Loading...
HomeMy WebLinkAbout0139782-Plumbing (water heater)0 OSHKOSH ON THE WATER Job Address 1303 HAZEL ST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Contractor SAMMONS PLUMBING Roof Drain Bathtub Clothes Wshr Classrm Sink Shower Lndry Tray Exam Sink Whirlpool Sump Pump F Prep Sink Lavatory San Sump /Pump Flr/Wst Sink Toilet Water Softner Hand Sink Kit Sink Standp Rec Lab Sink Disposal Gar Drain Plaster Sink Dishwasher Local Waste Sculry Sink Floor Drain Bar Sink Sery Sink Hose Bibb Breakrm Sink Shamp Sink Water Heater 1 Use /Nature of Work Valuation Owner JEREMIAH M /MARGUERITTE F MILLER No 139782 Create Date 02/16/2010 Category 413 - Res - Interior (Replacement Fixtures) Plan Surgeons Sink Roof Drain Deduct Meters Sterilizer Soda Disp Wtr Sewer Mtrs RPZ Valve Coffee Maker Wtr Usage Mtrs Bidet Site Drain Misc. Urinal Wait. St. Fixtures Beer Tap Ice Chest Dip Well Comm Ice Maker Drink Ftn Int Grease Trap Wash Ftn Ext Grease Trap Catch Basin Eye Wash Statn $700.00 Plan Approval $0.00 Permit Fees $25.00 ❑ Permit Voided Issued By `2- 7— Date 02116/2010 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522 W. MURDOCK AVE OSHKOSH WI 54901 -2298 Telephone Number (920) 231 -9880 To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.