HomeMy WebLinkAbout0139782-Plumbing (water heater)0
OSHKOSH
ON THE WATER
Job Address 1303 HAZEL ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor SAMMONS PLUMBING
Roof Drain
Bathtub
Clothes Wshr
Classrm Sink
Shower
Lndry Tray
Exam Sink
Whirlpool
Sump Pump
F Prep Sink
Lavatory
San Sump /Pump
Flr/Wst Sink
Toilet
Water Softner
Hand Sink
Kit Sink
Standp Rec
Lab Sink
Disposal
Gar Drain
Plaster Sink
Dishwasher
Local Waste
Sculry Sink
Floor Drain
Bar Sink
Sery Sink
Hose Bibb
Breakrm Sink
Shamp Sink
Water Heater
1
Use /Nature
of Work
Valuation
Owner JEREMIAH M /MARGUERITTE F MILLER
No 139782
Create Date 02/16/2010
Category 413 - Res - Interior (Replacement Fixtures) Plan
Surgeons Sink
Roof Drain
Deduct Meters
Sterilizer
Soda Disp
Wtr Sewer Mtrs
RPZ Valve
Coffee Maker
Wtr Usage Mtrs
Bidet
Site Drain
Misc.
Urinal
Wait. St.
Fixtures
Beer Tap
Ice Chest
Dip Well
Comm Ice Maker
Drink Ftn
Int Grease Trap
Wash Ftn
Ext Grease Trap
Catch Basin
Eye Wash Statn
$700.00 Plan Approval $0.00 Permit Fees $25.00 ❑ Permit Voided
Issued By `2- 7— Date 02116/2010
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522 W. MURDOCK AVE OSHKOSH WI 54901 -2298 Telephone Number (920) 231 -9880
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.