HomeMy WebLinkAbout10-38FEBRUARY 9, 2010 10 -38 RESOLUTION (CARRIED 6 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF CHANGE ORDER NO. 2 FOR PUBLIC WORKS CONTRACT NO. 08 -01 WITH S.J. LOUIS CONSTRUCTION, INC., FOR HAZEL STREET AND NEW YORK AVENUE UTILITY RECONSTRUCTION ($136,709.17) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: S. J. LOUIS CONSTRUCTION, INC. 1351 W. BROADWAY ST. PO BOX 459 ROCKVILLE, MN 56369 Net Increase to contract: $136,709.17 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No Acct. No Acct. No Acct. No Acct. No Acct. No 317- 0410- 7480 -03302 317- 0410- 7480 -03303 317- 0410- 7480 -03305 541 - 1841- 1799 -00000 551 - 1910- 1799 -00000 561- 2010- 1799 -00000 - Special Assessments Fund - Sewer - Special Assessments Fund - Water - Special Assessments Fund - Storm Water - Water Utility Construction Work in Progress - Sewer Utility Construction Work in Progress - Storm Water Utility Construction Work in Progress ( 0 Of HKO H ON THE WATER MEMORANDUM TO: FROM DATE: RE: Honorable Mayor and Members of the Common Council Steven M. Gohde, Assistant Director of Public Works February 4, 2010 Change Order #2 for Public Works Contract No. 08 -01 / S. J. Louis Construction, Inc./ Hazel Street and New York Avenue Utility Reconstruction ( +$136,709.17) BACKGROUND Change Order #2 for Contract 08 -01 is scheduled for consideration by the Common Council at the February 9, 2010 meeting. The contract was originally awarded to S.J. Louis Construction, Inc., of Rockville, MN in December of 2008. ANALYSIS Additional costs were incurred in the Paving, Sanitary Sewer, Storm Sewer and Water Main sections to adjust for existing field conditions and utilities. The paving section increased due to replacing the traffic signal bases and conduits at the intersection of Bowen St. and New York Ave. while the concrete pavement was removed. The storm sewer section increased to modify structures and pipes to resolve conflicts with other utilities. The sanitary sewer section increased to modify structures to resolve conflicts and to include sanitary sewer drops needed to construct the project. The water main section increased due to deepening the water main for several blocks to eliminate several bends and lateral conflicts. Additional parts and time were also needed to repair water mains that failed outside of the work area. FISCAL IMPACT Funding for the project is in the 2008 and 2009 Capital Improvement Program Budgets including funds from prior years. The original contract was $4,656,326.00. The change order amounts are $11,550.00 for Paving, $8,173.28 for Storm Sewer, $53,463.66 for Sanitary Sewer and $63,522.23 for Water Main. RECOMMENDATIONS I recommend approval of the Change Order # 2 to Contact No. 08 -01 in the amount of $136,709.17 to S.J. Louis Construction, Inc. Respectfully Submitted, Steven M. Gohde Asst. Director of Public Works Approved: City Manager I: \Engineering \08 -01 Hazel & New York Interceptor, New York Storm \Project_Information \Correspondence \Memo \CO #2 exp.doc CHANGE ORDER # 2 DATED: January 15, 2010 TO: S. J. LOUIS CONSTRUCTION, INC. 1351 W. BROADWAY STREET P.O. BOX 459 ROCKVILLE, MN 56369 Your present contract with the City of Oshkosh, Contract No. 08 -01 , is hereby amended and changed as follows: NET INCREASE TO: WORK UNIT A- SECTION I -CONCRETE PAVING $11,550.00 $8,173.28 NET INCREASE TO: WORK UNIT A - SECTION [I - STORM SEWER III -SANITARY SEWER $53,463.66 NET INCREASE TO: NET INCREASE TO: WORK UNIT A -SECTION WORK UNIT A - SECTION IV - WATER MAIN $63,522.23 NET INCREASE TO CONTRACT: $136,709.17 CITY OF OSHKOSH Recommended: Director of Public Works BY: City Manager City Clerk Approved and accepted: q d Contr6dor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: Comptroller City Attorney CONTRACT: 08 -01 CHANGE ORDER # 2 WORK UNIT A - SECTION I - CONCRETE PAVING ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION I 135 Additional labor, equipment, INCREASE DECREASE IN ITEM and materials to install UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT T CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 135 Additional labor, equipment, INCREASE IN DECREASE IN ITEM and materials to install UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT I NUMBER underground conduit, pull QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE boxes, and concrete bases for traffic signals in the Lump intersection of Bowen St. and Lump 1.00 1.00 $2,896.52 $2,896.52 221 New York Ave., per SPR #15 Sum 1.00 1.00 $11,550.00 $11,550.00 ADDITIONAL WORK: C.O. # 2 - (ITEM 135) - SUB -TOTAL $11,550.00 $0.00 NET INCREASE TO: SECTION 1 $11,550.00 WORK UNIT A - SECTION II - STORM SEWER ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION II 220 Additional labor, equipment, INCREASE IN DECREASE IN ITEM and materials to cut down UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT I NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 220 Additional labor, equipment, and materials to cut down and cut in new holes for storm sewer in MH SS -2 due to plan being incorrect, per Lump SPR #21 Sum 1.00 1.00 $2,896.52 $2,896.52 221 Additional labor, equipment, and materials to cut one foot of base and recut 12" storm sewer connections on MH 1'u SS -3 due to plan elevations Lump being incorrect, per SPR Sum 1.00 1.00 $1,024.01 $1,024.01 222 Additional labor, equipment, and materials to over excavate area to install storm sewer lead from inlet 3.4 to inlet 3.3 and relocate inlet 3.4 due to gas main conflict, Lump per SPR #27 Sum 1.00 1.00 $779.08 $779.08 223 Additional labor, equipment, and materials to cut in opening in new inlet and MH #3 to install added 12" RCP which was added to contract, Lump per SPR #30 Sum 1.00 1.00 1 $400.91 $400.91 Page 1 of 5 CONTRACT: 08 -01 CHANGE ORDER # 2 224 Additional labor, equipment, INCREASE IN DECREASE IN ITEM and materials to relocate CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER inlet 4-4 to the west to avoid UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE conflict with gas main. Gas main had to be over excavated to it to be raised 1.5 feet per SPR #29 and Lump SPR #31 Sum 1.00 1.00 $2,799.76 $2,799.76 225 Additional labor, equipment, and materials needed to cut down and lower storm inlets. Inlets were set to plan grade Lump per SPR #33 Sum 1.00 1.00 $273.00 $273.00 ADDITIONAL WORK: C.O. # 2 - (ITEMS 220 -225) - SUB -TOTAL $8,173.28 $0.00 NET INCREASE TO: SECTION II $8,173.28 WORK UNIT A - SECTION III - SANITARY SEWER ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION III 341 Additional labor, equipment, INCREASE IN DECREASE IN ITEM and materials to reset MH H- CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 341 Additional labor, equipment, and materials to reset MH H- 12. Elevations were incorrect on plans and MH needed to be raised 1.0 feet. Drop in MH H -12 was abandoned. New hole 18" pipe needed to be cut in and lower hole was required to be abandoned and plugged. Sewage needed to be bi- passed during the reconfiguration of manhole, Lump er SPR #18 & SPR #19. Sum 1.00 1.00 $12,577.81 $12,577.81 342 Additional labor, equipment, and materials to raise MH N- 6 three feet due to wrong elevation on plans. Additional manhole section needed to be ordered and installed, MH N-6 was buried to allow traffic onto roadway while section was being built and had to be excavated once section arrived, per Lump 1.00 1.00 $962.45 $962.45 SPR #20 Sum 343 Additional labor, equipment, and materials to reconnect existing sanitary sewer outside of MH #13 at Broad St. Existing main was 15' higher than plan grade and required 2 -10" 45° bends to Lump be installed, per SPR #24 Sum 1.00 1.00 $1,614.36 $1,614.36 Page 2 of 5 CONTRACT: 08 -01 CHANGE ORDER # 2 344 Additional labor, equipment, and materials to investigate a lateral backup at 1136 Eastman. Lateral was excavated to determine the cause of backup. Upon excavation, it was determined nothing was wrong with lateral, per SPR Lump #28 Sum 1.00 1.00 $1,187.44 $1,187.44 345 Additional labor, equipment and materials to excavate and install sanitary lateral and water service for # 905 E. New York Avenue. Utilities were not shown on plans and in conflict with sewer, per Lump SPR #38 and SPR #39 Sum 1.00 1.00 $2,621.29 $2,621.29 346 Additional labor, equipment, and materials to excavate around utilities not shown on plans to install sanitary sewer Lump main, per SPR #40 Sum 1.00 1.00 $3,246.40 $3,246.40 347 Due to the timing of the construction of Mt. Vernon Ave. by Carl Bowers & Sons, various temporary manholes did not need to be installed. Since manholes were already delivered we bought manholes and put them in Lump City yard, per SPR #47 Sum 1.00 1.00 $4,966.97 $4,966.97 348 After S.J. Louis televised sanitary sewer, sewer laterals had large amounts of clear water. City requested the laterals be televised to verify the source of inflow. Upon completion it was determined that inflow was outside limits of construction, Lump per SPR #48 Sum 1.00 1.00 $1,617.54 $1,617.54 349 Furnish and install 8" sanitary sewer drops, complete asspecified Each 15.36 15.36 $350.00 $5,376.00 350 Furnish and install 10" sanitary sewer drops, complete asspecified Each 5.06 5.06 $415.00 $2,099.90 351 Furnish and install 12" sanitary sewer drops, Complete asspecified Each 28.66 28.66 $475.00 $13,613.50 352 Furnish and install 21" sanitary sewer drops, complete asspecified Each 3.58 3.58 $1,000.00 $3,580.00 ADDITIONAL WORK: C. 0. # 2 - (ITEMS 341 -352) - SUB -TOTAL $53,463.66 $0.00 NET INCREASE TO: SECTION III $53,463.66 WORK UNIT A - SECTION IV - WATER MAIN Page 3 of 5 CONTRACT: 08 -01 CHANGE ORDER # 2 ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION IV ITEM CONTRACT INSTALLED NET NET COST PER fNCREASE IN DECREASE !N NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE 001rc 434 Additional labor, equipment, Lump Sum 437 Additional labor, equipment, 1.00 and materials to cut and cap $3,260.42 $3,260.4 and materials to install existing 6" watermain to Ave. at Oak St. after MH N-4 I sanitary sewer was installed and backfilled. between MH# 7 and MH# 8, Lump location er SPR #35 438 Additional labor, equipment, Sum 1.00 and the watermain had to be 1 $1,639.45 $1,639.4; and materials to expose relocated around MH# 8 due exposed, water department to the size and location. City decided a new valve and tee supplied parts and S.J. Lump #36 and SPR#37 439 Additional labor and Sum 1.00 Louis installed pipe, per SPR Lump $2,694.37 equipment to repair #22 and SPR #23 termain connection by Sum 1 1.00 1.00 $6,253.06 $6,253.06 d tracks plan called for 74 +50. City supplied the bend. City requested 2 Lump #43 440 Additional labor, equipment, Sum 1.00 [T45' nds to be used due to $3,809.92 $3,809.92 and materials to cut and cap n of existing Lump 18, per SPR #44 Sum 1.00 main, additional time $2,661.29 $2,661.29 quired to make Lump ction, per SPR #25 436 Due to shallowness and Sum 1.00 1.00 $5,057.01 $5,057.01 condition of existing watermain by MH N-4, the watermain broke when MH N 4 was excavated. Additional time to cut & cap watermain, v..J' .11 ji ll L*, FR'ir SPR #34 Lump Sum 437 Additional labor, equipment, 1.00 1.00 $3,260.42 $3,260.4 and materials to install watermain across New York Ave. at Oak St. after MH N-4 was installed and backfilled. Watermain broke in another Lump location er SPR #35 438 Additional labor, equipment, Sum 1.00 1.00 1 $1,639.45 $1,639.4; and materials to expose watermain in Oak St. Once exposed, water department decided a new valve and tee needed be installed, per SPR Lump #36 and SPR#37 439 Additional labor and Sum 1.00 1.00 $2,694.37 $2,694.37 equipment to repair watermain that was broke over the weekend at station 74 +50. City supplied the parts, per SPR #42 and SPR Lump #43 440 Additional labor, equipment, Sum 1.00 1.00 $3,809.92 $3,809.92 and materials to cut and cap broken watermain by MH N- Lump 18, per SPR #44 Sum 1.00 1.00 1 $2,661.29 $2,661.29 Page 4 of 5 CONTRACT: 08 -01 CHANGE ORDER # 2 441 Additional labor and equipment to repair leaking watermain at stations 50 +50 Lump and 80 +90, per SP #45 Sum 1.00 1.00 $2,474.24 $2,474.24 442 Additional labor and equipment to cap broken watermain at station 75 +25, Lump 443 p er SPR#46 Additional labor, equipment, Sum 1.00 1.00 $1,024.97 $1,024.97 and materials to lower watermain approximately 2.5 feet from plan grade to eliminate multiple bends and Potential service conflicts with storm sewer, per SPR Lump 444 #49 Furnish and install 4" sleeve, Sum 1.00 1.00 $29,137.50 $2 9,137.50 complete as specified 445 Furnish and install 6' sleeve, Each 1.00 1.00 $180.00 $180.00 complete as specified 446 Furnish and install 8" sleeve, Each 10.00 10.00 $200.00 $2,000.00 complete as specified 447 Furnish and install 6 "W'W' Each 2.00 2.00 $240.00 $480.00 tee, complete as specified 448 Fumish and install 6 "x6" jEach 1.00 1.00 $350.00 $350.00 tapping valve and sleeve, 449 corn lete ass ecified Fumish and install 8 "x6" Sum 1.00 1.00 $1,200.00 $1,200.00 tapping valve and sleeve, Lump — complete ass ecified Sum 1.00 1 1.00 $1.300.00 $1.3on nn ADDITIONAL WORK: C.O. # 2 (ITEMS 434 -449) - SUB -TOTAL NET INCREASE TO: SECTION IV NET INCREASE TO SECTIONS I, II, III, IV NET DECREASE TO SECTIONS I, II, III, IV NET INCREASE TO CONTRACT: $63,522.23 $0.00 $63,522.23 $136,709.17 $0.00 $136,709.17 Page 5 of 5