Loading...
HomeMy WebLinkAbout10-44FEBRUARY 9, 2010 10 -44 RESOLUTION (CARRIED 6 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF AGREEMENT WITH WISCONSIN DEPARTMENT OF TRANSPORTATION FOR UTILITY RELOCATOINS REQUIRED FOR RECONSTRUCTION OF USH 41: 9TH AVENUE WATERMAIN (Total Cost - $537,851.00, City Share - $53,785.10) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the attached Agreement for Payment For Relocation or Replacement of Municipal Utility Facilities Located on Public Held Land Required by Freeway between the Wisconsin Department of Transportation and the City of Oshkosh for utility relocations required for reconstruction of USH 41: 9th Avenue watermain with a cost to the City of Oshkosh of $53,785.10 is hereby approved and the proper City officials are hereby authorized to execute and deliver the agreement in substantially the same form as attached hereto, any changes in the execution copy being deemed approved by their respective signatures, and said City officials are authorized and directed to take those steps necessary to implement the terms and conditions of the Agreement. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 541 - 1841 - 1799 -00000 Water Utility Construction Work in Progress ( 0 HKO H A ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works DATE: February 4, 2010 RE: Approve of Agreement with Wisconsin Department of Transportation for Utility Relocations Required for Reconstruction of US Highway 41: 9 Avenue Watermain (Total Cost $537,851.00, City Share $53,785.10) BACKGROUND The Wisconsin Department of Transportation (DOT) is planning to reconstruct USH 41 from State Highway 26 to Breezewood Lane in Neenah. USH 41 has reached its capacity and will be expanded to meet the public needs and improve safety. The construction addressed in this agreement covers relocation of the City's watermain crossing of USH 41 near 9 Ave. ANALYSIS The DOT will be replacing the 9 Avenue Bridge over USH 41 as part of the overall USH 41 project. The new bridge and ramps conflict with the existing watermain crossing. The agreement allows for the City to be reimbursed for 90% of the cost to relocate the existing watermain. The City will pay for the costs of betterment to increase the size of the watermain crossing from 12" to 16 ". FISCAL IMPACT This work is included in the 2010 Capital Improvement Program (CIP) Budget. The total agreement amount is $537,851.00. The DOT will reimburse the City $484,065.90. The cost to the City will be $53,785.10. RECOMMENDATIONS I recommend approval of the Utility Relocation Agreement. Respectfully Submitted, Steven M. Gohde Asst. Director of Public Works Approved: ,, � ,O, )!!. 0 "�� Mark A. Rohloff City Manager I:\ Engineering \Correspondence \Steve Gohde\council memos \9th watermain DOT agreement.doc AGREEMENT FOR PAYMENT For Relocation or Replacement of Municipal Utility Facilities Located on Public Held Land Required by Freeway Construction Wisconsin Department of Transportation DT1575 6/2008 s.84.295(4m) Wis. Stats. Municipal Utility Name CITY OF OSHKOSH - WATER (NINTH AVENUE) Project Description — Include Project ID, Title, Limits, Highway, County PROJECT 1120- 10 -72, STH 26 - BREEZEWOOD LANE, STH 26 - STH 21, USH 41, WINNEBAGO COUNTY This Agreement is made and entered into by and between 2. the Wisconsin Department of Transportation, designated as the "DEPARTMENT, and the above- identified municipal utility, designated as the `MUNICIPAL UTILITY', for the payment for the relocation or replacement of certain municipal utility facilities on publicly held lands as required by the construction of the freeway project identified above. For and in consideration of the acceptable relocation or replacement of the MUNICIPAL UTILITY facilities presently located on publicly held lands which must be modified to accommodate the construction of the above - identified freeway, the DEPARTMENT will pay an amount equal to 90% of the net cost incurred by the MUNICIPAL UTILITY for the actual removal, relocation, alteration or other rearrangement of the MUNICIPAL UTILITY facilities situated on the lands required to restore equivalent function as necessary and in kind, if feasible, of the affected segment of the MUNICIPAL UTILITY facility. The work covered by this Agreement is set forth and made a part of the attached Exhibit. The Exhibit consists of a statement of the work and a proposed schedule for its accomplishment and coordination, if necessary, with the companion highway work, an estimate of costs, plans and special provisions, if any. The work shall be performed under normal MUNICIPAL UTILITY practices and the costs computed and determined in accordance with the work order accounting procedure prescribed or approved for the MUNICIPAL UTILITY by the regulatory agency having jurisdiction, including applicable provisions of the Code of Federal Regulations 23, Part 645, Subpart A - Utility Relocations, Adjustments, and Reimbursement. It is further understood that: All salvage shall be credited to the project in the manner prescribed under the MUNICIPAL UTILITY's accounting procedure for work undertaken at the expense and volition of the MUNICIPAL UTILITY. When recovered materials are to be disposed of by sale as scrap, the MUNICIPAL UTILITY shall either have filed with the DEPARTMENT an acceptable statement outlining the MUNICIPAL UTILITY's current standard practice and procedure for disposal of such material or shall give written notice to the DEPARTMENT of the location and time said recovered materials will be available for inspection. The MUNCIPAL UTILITY shall not subcontract any portion of the work included under this Agreement without the prior approval of the DEPARTMENT except for work of relatively minor cost or nature. Any existing continuing contract, under which the MUNICIPAL UTILITY now has certain work regularly performed, will be considered to conform to the requirements of this section, provided the contract is submitted for the Regional Director's prior approval. The MUNICIPAL UTILITY shall keep and make available to the DEPARTMENT detailed payrolls for office and field personnel, equipment use records, materials used, and salvage records including the condition and disposition of the removed and salvaged materials, as well as payments to any MUNICIPAL UTILITY subcontractor if the work is performed in that manner. The MUNICIPAL UTILITY agrees to maintain all records of costs incurred that are covered by this Agreement for a period of 3 years from the date of final payment for inspection by the DEPARTMENT and the Federal Highway Administration. Utility Project ID 1120- 10- 46Municipal Agreement CITY OF OSHKOSH - WATER (9 AVENUE) A credit shall be given representative of the amount of depreciation accrual, if any, assignable to the facilities subject to replacement. Such credit shall be calculated in accordance with s.645.117(h)(2) of the Code of Federal Regulations, Title 23. The amount of the credit shall be based upon the original installed cost, the age of the facility and the applicable depreciation rates, but may also consider the average service lives certified by the regulatory agency having jurisdiction and the expected remaining service lives of the existing materials. 3. Work under this Agreement shall not start until the MUNICIPAL UTILITY has received written notice from the DEPARTMENT to proceed with the work. The MUNICIPAL UTILITY shall give prior notice to the appropriate DEPARTMENT Regional Transportation Office when it proposes to commence its construction operations and shall give similar notification when operations are resumed subsequent to suspension of operations. Any significant change in the extent or scope of the work under this Agreement must be covered by a written change order or any extra work order. It is expressly understood and agreed that any work done by the MUNICIPAL UTILITY prior to authorization by the DEPARTMENT shall be at the MUNICIPAL UTILITY's sole expense. UA No. 301 Page 1 of 3 4. Upon completion of the work contemplated under this Agreement, the MUNICIPAL UTILITY will submit invoices to the DEPARTMENT setting forth the actual and related indirect cost in substantially the same detail and order indicated in the estimate attached to this Agreement. Each copy of such invoice shall identify the location where the supporting records for the costs included in the billing may be reviewed as well as the name of the MUNICIPAL UTILITY custodian of such records. Invoice shall be submitted within one year of the completion of the companion highway project. The MUNICIPAL UTILITY agrees to permit audit of said invoices by the DEPARTMENT and by the Federal Highway Administration, if necessary, and to offer prompt support for any item cited for review or be deemed to concur in the item's deletion or correction. The supportable net amount of the invoice verified by audit as being in compliance with the provisions of this Agreement shall be paid by the DEPARTMENT and will be accepted as full compensation for the agreed upon work including all damages, costs and expenses incurred by the MUNICIPAL UTILITY and arising from or necessitated by the work. 5. In connection with the performance of work under this contract, the MUNICIPAL UTILITY agrees not to discriminate against any employe or applicant for employment because of age, race, religion, color, handicap, sex, physical condition, developmental disability as defined in s.51.01(5) Wisconsin Statutes, sexual orientation as defined in s.111.32(13m) Wisconsin Statutes or national origin. This provision shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. Except with respect to sexual orientation, the MUNICIPAL UTILITY further agrees to take affirmative action to ensure equal employment opportunities. The MUNICIPAL UTILITY agrees to post in conspicuous places, available for employes and applicants for employment, notices to be provided by the contracting officer setting forth the provisions of the nondiscrimination clause. 6. The execution of this Agreement by the DEPARTMENT shall not relieve the MUNICIPAL UTILITY from compliance with applicable Federal and State laws, Wisconsin Administrative Codes, and local laws or ordinances which may affect the performance of the work covered, and shall not be construed to supersede any other governmental agency requirements for plan approval or authority to undertake the utility alteration work. This Agreement does not supplant any permit required under sections 84.08, 86.07(2), or 86.16, Wisconsin Statutes. No MUNICIPAL UTILITY work affecting highway lands shall be undertaken without any required separate permit, which may be processed and . approved concurrently with this Agreement. In accordance with section 84.295(4m)(d), Wisconsin Statutes, any entry upon or occupation of freeway right of way under this Agreement by a Metropolitan Sewerage District acting under section 66.24(5)(b), Wisconsin Statutes, shall be done in a manner acceptable to the DEPARTMENT. 7. The Agreement is not binding upon the parties until this document has been fully executed by the MUNICIPAL UTILITY and the DEPARTMENT. The parties have caused this Agreement to be executed by their proper officers and representatives on the date shown. Wisconsin Department of Transportation (Municipal Utility) (Contract Manager) (Date) (Governor of Wisconsin) (Date) (Signature) (Date) (Title) (Signature) (Date) (Title) (Signature) (Date) (Title) utility Project ID 1120- 10- 46Municipal Agreement CITY OF OSHKOSH - WATER (9TM AVENUE) UA No. 301 Page 2 of 3