HomeMy WebLinkAbout10-09JANUARY 12, 2010 10 -09 RESOLUTION
(CARRIED 7 -0 LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVE ACCEPTING STORM SEWER /DRAINAGE
EASEMENTS AT 220 -255 SOUTH WESTFIELD STREET
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
PLAN COMMISSION RECOMMENDATION: Approved
BE IT RESOLVED by the Common Council of the City of Oshkosh that the
proper City officials are hereby authorized and directed to accept storm sewer /drainage
easements at 220 -255 South Westfield Street, per the attached, and to execute any and
all documents necessary for purposes of same.
.fHK fH
ON THE WATER
TO: Honorable Mayor and Members of the Common Council
FROM: Darryn Burich
Director of Planning Services
DATE: January 7, 2010
RE: Approve Accepting Storm Sewer /Drainage Easements / 220 -255 South Westfield
Street (Plan Commission Recommends Approval)
BACKGROUND
The subject properties are located along S. Westfield Street approximately 925 feet north of W.
5 th Avenue. The four subject properties are all two - family dwellings with the immediate area
being a mix of single and two family uses to the north and south, commercial to the west, and the
newly completed Tipler Dry Detention Pond to the east.
ANALYSIS
The purpose of the easement request is to provide space needed to construct an upgraded storm
sewer system through the S. Westfield Street area in the form of a four foot by six foot box
culvert. The storm sewer system will convey runoff to the newly constructed Tipler Dry
Detention Basin to the east. The easements are necessary for the storm sewer upgrade and will
provide a reduction in flooding in the area between S. Koeller Street and the Tipler Basin. The
easements will run the entire depth of the subject properties, with a width of 25 feet east of S.
Westfield Street and 20 feet wide west of S. Westfield Street. The Department of Public Works
will work with the property owners to have appropriate easement documents signed and, if
approved, will be recorded at the Winnebago County Register of Deeds.
FISCAL IMPACT
N/A
RECOMMENDATION
The Plan Commission approved of this request at its December 15, 2009 meeting.
Approved,
City Manager
ITEM: ACCEPT STORM SEWER/DRAINAGE EASEMENTS FOR PROPERTIES
LOCATED AT 220 THROUGH 255 S. WESTFIELD STREET
Plan Commission meeting of December 15, 2009
GENERAL INFORMATION
Petitioner: City of Oshkosh, Department of Public Works
Owners: Multiple
Action Requested:
The Department of Public Works is requesting acceptance of storm sewer /drainage easements
located between 220/230 and 240/250 S. Westfield Street and 221/225 and 251/255 S. Westfield
Street.
Applicable Ordinance Provisions: N/A
Property Location and Type /Analysis:
The subject properties are located along S. Westfield Street approximately 925 feet north of W, 5th
Avenue. The four subject properties are all two - family dwellings with the immediate area being a
mix of single and two family uses to the north and south, commercial to the west, and the newly
completed Tipler Dry Detention Pond to the east.
The purpose of the easement request is to provide space needed to construct an upgraded storm
sewer system through the S. Westfield Street area in the form of a four foot by six foot box culvert.
The storm sewer system will convey runoff to the newly constructed Tipler Dry Detention Basin to
the east. This will provide a reduction in flooding in the area between S. Koeller Street and the
Tipler Basin.
The easements will run the entire depth of the subject properties, with a width of 25 feet east of S.
Westfield Street and 20 feet wide west of S. Westfield Street.
Staff does not have any concerns with the easements as they are necessary for the storm sewer
upgrade and will provide flooding relief to the immediate area.
The Department of Public Works will work with the property owners to have appropriate easement
documents signed. After review by the Plan Commission and approval by the Common Council,
the easement will be recorded at the Winnebago County Register of Deeds.
RECOMMENDATION /CONDITIONS
The Department of Community Development recommends approval of the acceptance of the
proposed storm sewer /drainage easements as requested.
The Plan Commission approved of the storm sewer /drainage easements as requested. The
following is the Plan Commission's discussion on this item.
Mr. Nau presented the item, reviewed the site and explained the purpose of the easement is to
provide space needed to construct an upgraded storm sewer system through the S. Westfield Street
area in the form of a four foot by six foot box culvert. The storm sewer system will convey runoff
to the newly constructed Tipler Dry Detention Basin to the east.
Ms. Lohry asked for clarification of the definition of a dry detention basin.
Steve Gohde, Assistant Director of Public Works, responded that a dry detention basin is one that
does not have water held in it all year round.
Mr. Thorns questioned if the box culvert would also be installed under the street as well.
Mr. Gohde replied that the street sewer is not wide enough therefore the box culvert would be
installed through the mentioned private properties as well as across S. Westfield Street.
Mr. Thorns asked what the distance was between the easements and the structures on these
properties and if it would create any issues for the homeowners.
Mr. Gohde responded that it was very close to the structures but construction would not
necessarily require the entire width of the easement requested. The contractor did not anticipate
any problems with the placement of the easement. Mr. Gohde also commented that he had
received a call from Mary Kemps, owner of 221 -225 S. Westfield Street, and she was in support of
this project.
Mr. Thorns then inquired if the location of the easement would create problems with setback
requirements for the properties.
Mr. Burich responded that the easements do not effect setback requirements.
Ms. Propp stated that she reviewed the site and there was not much room for the proposed
easement other than constructing it underneath the driveway of one of the homes and she had
concerns with how this may impact the use on the property.
Mr. Gohde replied that existing uses are allowed to continue and homeowners are compensated for
the placement of the easement on their property. If approved, negotiations with the homeowners
will commence and in the case of placement under the driveway, the driveway will be
reconstructed to be as it currently exists. Property owners are not allowed to place fences or trees
within the easement area however lawns and driveways are not an issue in these areas.
Mr. McHugh questioned why the request was not presented prior to the project being planned and
the basin constructed.
Mr. Fojtik commented that this was most likely not the only viable solution for directing runoff to
the basin.
Mr. Gohde responded that it was simply a timing issue with the design work and other issues
unfolding on the project with a short timetable.
Mr. McHugh commented that he understood the need for the detention basin.
Mr. Gohde stated that property owners were contacted prior to this meeting and no significant
objections were heard at this time.
Motion by Thoms to approve the easements for properties located at 220 through 255 S.
Westfield Street as requested.
Seconded by Monte. Motion carried 9 -0.
3
Campbell Creek Watershed
Accepting Easements
Storm Sewer / Drainage Easements
This purpose of accepting these storm sewer / drainage easements is to provide the easement space
needed to construct an upgraded storm sewer system through the South Westfield Street area The
upgraded storm sewer system will convey runoff to the newly constructed Tipler Dry Detention Basin,
and provide a reduction in flooding in the area between South Koeller Street, and the Tipler Dry
Detention Basin.
IAEngineering\Storm Water InformationlCampbell Creek Watershed\Landmark
Conveyance UpgradesMestfield Street Easements Description.doc
Page 1 of 1
N
W
S
i i o�Z
ii
�Z
F7 I �I
I
x
f
W
O
ox
lxo
am
CO
W .._.._.._..� ._.._.._.._.._.._ I w W
I I wC
I I I W
_ I W
x I W �--
x � co
I i ��
U) CO
3
I
xi I I I I cm
I j F O�Z I oLZ I = n
o
0
I I I SZ
i
._ .._.._.._..�.._.._.._.._.._..J. O
0 =W
W Y
N
1331d1S al3IJ1S3M H1f10S
XVM— J0- 1HOI2l _.._.._.._.._.
0
{ o f
1
r i
l6l S lZZ lSZ
l
; SSZ I LLZ
I I
I IC � I SLZ
ll� I
I =
wl I I
_.._.._.._.. ._.._.._.._.._. ...._.._.._�._.._.._.._..
m
tt
b
c2
lr
�
m
13 1� o
m
-
00
N: tf)
59.03'
r
f
T T
q 00
"
T
EASEMENT
EASEMENT 1 1 791
o
LOCATION
LOCATION
95
;�
T Sr s ui
O'
�
S7 aq a
<} ' v
-
� S .k�l S ro 168 14
T ! :. a +, b:Y., a' ; � r
K F
r
M.�< } $� x kf �ga t; � x, X .i �
~>
g A
•-
'+ a dry } P r 0n v� _.
� LL7F� > � �,
k
O •_ -' � i
/
N +1'
"
N
# ;t � ,
168.28'
'/+t
a � /
{ o
U
JJ
168.33'
17
153.05'
a
�p
N
164.85'
F
I A
t
Cl)
9.89'
i
DISCLAIMER
A l ^ ,C EP EASEMENTS
A CC
This map is neither a legally recorded map nor v v
a survey and It is not intended to be d a s one. 220 255 S W ESTF I E L D ST N O.I HKO.IH
data
This drawing is a compilation of rec —
and information located in various city, county ON THE WATEN
and state offices and other sources affecting
the area shown and it Is to be used for reference City of Oshkosh
purposes only. The City of Oshkosh is not re- Department of
s ned. Sc a le. 1 " — 1 00 , Community Development
lfdiscforanyl repencies a le refound a rein e contact the
If discre found, plesntact
City of Oshkosh.
12108/09
Created by - dff
►J
aw —=
Ft IL01
I. i
r.A � 0
■ BPI 118
mi :1 im mi 1
r
p
_ - — — -
�♦ / a •'�
yyn L r
L 11l
• L'
If
ff
I
JI
C9�t
� 4l i�V�ll11111
Em
MWA
IIC�i
-W
I
r.
, V
i
,.