Loading...
HomeMy WebLinkAbout0121378-Plumbing (laterals) CITY OF OSHKOSH No 121378 OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 3200 WHITETAIL LN Owner MIDWEST GENERAL CONTRACTORS Create Date 09/05/2006 Contractor RADTKE CONTRACTORS INC Category 430 - Industrial- Exterior (laterals) Plan Bathtub Shower Water Softner Wait. St. Shamp Sink Coffee Maker Whirlpool Floor Drain Local Waste Ice Chest Flr/Wst Sink Int Grease Trap Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Roof Drain Ejector /Grind Drink Ftn Sery Sink Soda Disp Misc. Fixtures Use /Nature Sanitary and water laterals for new 6 -unit apartment. * *debit acct of Work Size Material Type # Conn. Type Sanitary Sewer 6" Plastic Lateral 1 New Storm Sewer Water Service 2" Plastic Lateral 1 New Parcel Id # Valuation $1,500.00 Plan Approval $0.00 Permit Fees $100.00 ❑ Permit Voided Issued By Date 09/05/2006 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 6408 CROSS RD WINNECONNE WI 54986 - 9731 Telephone Number (920) 582 -4114 To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.