Loading...
HomeMy WebLinkAbout09-462DECEMBER 8, 2009 09 -462 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF CHANGE ORDER NO. 2 FOR PUBLIC WORKS CONTRACT NO. 08 -03 WITH J. F. AHERN CO., FOR HEADWORKS AND STORMWATER CONTROL IMPROVEMENTS PROJECT (- $471.16) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: J. F. AHERN CO. 855 Morris St. PO Box 1316 Fond du Lac, WI 54936 -1316 Net Decrease to contract: (- $471.16) PURPOSE: See attached Change Order. STRAND P ASSOCIATES. INC.- ENGINEERS 910 West Wingra Drive Madison, WI 53715 Phone: 608-251 -4843 Fax: 608- 251 -8655 Office Locations Madison, WI Joliet, IL Louisville, KY Lexington, KY Mobile, AL Columbus, IN Columbus, OH Indianapolis, IN Milwaukee, WI Cincinnati, OH Phoenix, AZ www.strand.com September 18, 2009 CHANGE ORDER NO.2 (FINAL) PROJECT: Headworks and Stormwater Control Improvements Project OWNER: City of Oshkosh, Wisconsin CONTRACT: 08 -03 CONTRACTOR: J.F. Ahern Co. Description of Change 2a Credit for the Unsuitable Foundation Material for DEDUCT ($600.00) Structures and Roads Allowance (Section 02222, paragraph 1.01.C) that was unused during construction (40 cubic yards at $15.00 per cubic yard). 2b Additional cost to excavate additional material from ADD $1,959.00 the drive area where liquid chemical loads are received. 2c Credit for eliminating the preparation and painting DEDUCT ($424.00) of the steel components of the three existing IDI mechanical bar screens. 2d Credit for eliminating the relocation of the 2 inch DEDUCT ($306.16) sodium bisulfate vent line which was completed by City staff. 2e Credit for one -calf of the cost associated with DEDUCT ($1,100.00) replacement ofthe slide gate stem (upstream of the north mechanical bar screen) which was found to be inoperable during construction. TOTAL VALUE OF THIS CHANGE ORDER DEDUCT ($471.16) Contract Price Adjustment Original Contract Price(( $465,600.00 Previous Change Orders djustments $7,829.00 Adjustment in Contract Price this Change Order ($471.16) Current Contract Price including this Change Order $472,957.84 Contract Completion Date Adjustment Original Contract Completion Date March 31, 2009 Contract Completion Date Adjustments due to previous Change Orders None STRAND ASSOCIAT ING- ENGINEERS 91 o West Wingra Drive Madison, WI 53715 Phone: 60 8-251 -4843 Fax: 608- 251 -8655 office Locations Madison, WI Joliet, IL Louisville, KY Lexington, KY Mobile, AL Columbus, IN Columbus, OH Indianapolis, IN Milwaukee, WI Cincinnati, OH Phoenix, AZ wwwstrand.com September 18, 2009 CHANGE ORDER NO.2 (FINAL) PROJECT: Headworks and Stormwater Control Improvements Project OWNER: City of Oshkosh, Wisconsin CONTRACT: 08 -03 CONTRACTOR: J.F. Ahern Co. Description of Change 2a Credit for the Unsuitable Foundation Material for DEDUCT Structures and Roads Allowance (Section 02222, paragraph 1.01.C) that was unused during construction (40 cubic yards at $15.00 per cubic yard). 2b Additional cost to excavate additional material from ADD the drive area where liquid chemical loads are received. 2c Credit for eliminating the preparation and painting DEDUCT of the steel components of the three existing IDI mechanical bar screens. 2d Credit for eliminating the relocation of the 2 inch DEDUCT sodium bisulfate vent line which was completed by City staff. 2e Credit for one -half of the cost associated with DEDUCT replacement of the slide gate stem (upstream of the north mechanical bar screen) which was found to be inoperable during construction. TOTAL VALUE OF THIS CHANGE ORDER Contract Price Adjustment Original Contract Price Previous Change Order Adjustments Adjustment in Contract Price this Change Order Current Contract Price including this Change Order ($600.00) $1,959.00 ($424.00) ($306.16) ($1,100.00) DEDUCT ($471.16) Contract Completion Date Adjustment Original Contract Completion Date Contract Completion Date Adjustments due to previous Change Orders $465,600.00 $7,829.00 ($471.16) $472,957.84 March 31, 2009 None a STRAND ASSOCIATES, INC E N 131 N E E R S City of Oshkosh, Wisconsin —J.F. Ahern, Co. Contract 08 -03, Change Order No. 2 (Final) Page 2 September 18, 2009 Contract Completion Date Adjustments due to this Change Order None Current Contract Completion Dates including all Change Orders March 31, 2009 This document shall become a supplement to the Contract and all provisions will apply hereto. 1 1 -lS 07 Date APPR VED A/A. 0-/- x/2 4 CONTRACTOR —J.F. Ahern Co. Date APPROVED OWNER —City of Oshkosh B.]L:mro\S : A \1300- 1399\1382 \037 \Wrd\Change Orders\COIVIIP.doc Date sa . City of Oshkosh, Wisconsin —J.F. Ahern, Co. STRAND Contract 08 -03, Change Order No. 2 (Final) ASSOCIATES, INC.- Page 3 E N G I N E E R S September 1.8, 2009 RECOMMENDED BY OWNER Director of Public Works Date APPROVED BY OWNER City Manager Date City Clerk Date I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under this Change Order. City Comptroller Date APPROVED AS TO FORM City Attorney /Assistant City Attorney Date BJL:mro\S: MAD \1300 - 139911382\037 \Wrd\Change Orders \CO 2.WIP.doe ( 0 OfHKO1H ON THE WATER MEMORANDUM TO: FROM DATE: RE: Honorable Mayor and Members of the Common Council Stephan M. Brand, Utilities Superintendent December 2, 2009 Change Order #2 for Wastewater Treatment Plant Contract No. 08 -03; Headworks and Stormwater Control Improvements Project BACKGROUND Change Order #2 for Contract 08 -03 is scheduled for consideration by the Common Council at the December 8, 2009 meeting. The contract was originally awarded to J.F. Ahern Co. of Fond du Lac in May of 2008. This change order includes a deduct for adjustment of a quantity allowance for unused materials, an addition for removal additional unsuitable materials in the chemical unloading area, and deducts for painting, a vent line relocation, and a slide gate stem replacement. ANALYSIS These changes were reviewed by Bradley Lake, from Strand and Associates, our consultant on the project and found to be reasonable based on his experience with similar work. FISCAL IMPACT Funds are available in the 2008 Equipment Replacement Section (Wastewater Utility Funds) of the Capital Improvement Budget. RECOMMENDATIONS I recommend approval of the Change Order # 2 to Contact No. 08 -03 for a deduct in the amount of $471.16 to J.F. Ahern Co. Respectfully Submitted, Approved: Stephan M. Brand Utilities Superintendent City Manager