Loading...
HomeMy WebLinkAbout09-463DECEMBER 8, 2009 09 -463 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 09 -10 WITH B &P MECHANICAL, INC., FOR WASTEWATER UTILITY HEATING AND VENTILATION IMPROVEMENTS ($9,044.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: B &P MECHANICAL, INC. 3200 W. Highview Dr. Appleton, WI 54914 Net Increase to contract: $9,044.00 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 551 - 1910 - 1799 -00000 -- Sewer Utility Construction Work in Progress STRAND ASS OCIATES. ING- ENGINEERS 910 West Wingra Drive Madison, WI 53715 Phone: 608 -251 -4843 Fax: 608 - 251 -8655 office Locations Madison, WI Joliet, IL Louisville, KY Lexington, KY Mobile, AL Columbus, IN Columbus, OH Indianapolis, IN Milwaukee, WI Cincinnati, OH Phoenix, AZ c(opy November 4, 2009 CHANGE ORDER NO. 1 PROJECT: Wastewater Utility Heating and Ventilation Improvements OWNER: City of Oshkosh CONTRACT: 09 -10 CONTRACTOR: B &P Mechanical, Inc. Description of Change www.strand.com la Replace two stainless steel ductwork elbows on ADD the supply ductwork for RTU -1 and RTU -2 at the Headworks Building. lb Relocate MAU -3 at the Broad Street Lift Station ADD to provide required maintenance clearance. 1 c Interlock EF -3 to MAU -3 at the Broad Street Lift ADD Station so that EF -3 will run when MAU -3 is called to run. 1 d Interlock existing intake damper to MAU -3 at the ADD Broad Street Lift Station so the damper will open when MAU -3 is called to run.. TOTAL VALUE OF THIS CHANGE ORDER: ADD Contract Price Adjustment Original Contract Price Previous Change Order Adjustments Adjustment in Contract Price this Change Order Current Contract Price including this Change Order $6,390.00 $808.00 $923.00 $923.00 $9,044.00 $319,000.00 $0.00. $9,044.00 $328,044.00 ( 0 Of HKOf H ON THE WATER MEMORANDUM TO: FROM DATE: RE: Honorable Mayor and Members of the Common Council Stephan M. Brand, Utilities Superintendent December 2, 2009 Change Order #1 for Wastewater Treatment Plant Contract No. 09 -10; Heating and Ventilation Improvements Various Locations BACKGROUND Change Order #1 for Contract 09 -10 is scheduled for consideration by the Common Council at the December 8, 2009 meeting. The contract was originally awarded to B &P Mechanical, Inc. of Appleton in April of 2009. This change order is for additional work to replacement stainless steel ductwork that was not accessible for evaluation until the old HVAC unit was removed for replacement, relocating a panel to provide required maintenance clearance, and control interlocks at two locations so remote HVAC equipment will run when primary units are activated. ANALYSIS These changes were reviewed by Matthew Merten, from Strand and Associates, our consultant on the project and found to be reasonable based on his experience with similar work. FISCAL IMPACT Funds are available in the 2009 Equipment Replacement Section (Wastewater Utility Funds) of the Capital Improvement Budget. RECOMMENDATIONS I recommend approval of the Change Order # 1 to Contact No. 09 -10 in the amount of $9,044.00 to B &P Mechanical Inc. Respectfully Submitted, A (' 6 -4D &Jlxv� Stephan M. Brand Utilities Superintendent Approved: I le City Manager