Loading...
HomeMy WebLinkAboutPlumbing H4-61-894-P August 26, 1994 P S Plumbing Inc. 870 Bengal Rd. Neenah, WI 54956 Heat Treat Plant Ref: Plumbing Plan Approval: 2601 Badger Ave. H4 -61 -894 -P Dear Sirs, Examination of the plumbing plans and specifications for the above mentioned project has been completed. In accord with Chapter 145, Wisconsin Statute, and ILHR 81 through 85, Wisconsin Administrative Code, the plumbing plans and specifications are approved contingent upon compliance with the stipulation(s) noted below: 1. Main stack provides a horizontal dry vent for building sewer in violation of ILHR 82.31(15)(b)(1) 2. Janitor sink and hose bibbs require backflow /siphonage protection. ILHR 82.41 3. Hand wash sink located on main floor may require hot water per ILHR 81.10(5) 4. Building sewer cleanout access minimum is every 100 feet of developed length. ILHR 82.35 In the event installation of this plumbing system has not commenced within two years from this date, this approval shall become void. A new application accompanied by full examination fees shall be filed and an updated approval received before work may commence. In granting this approval, the City of Oshkosh or its representa- tive does not hold itself liable for any defects in plans or specification, plan omissions, examination oversight, construction or any damage that may result in or after installation and reserves the right to order changes or additions should conditions arise making this necessary. It shall be necessary for the installing plumber to obtain a plumbing permit from the City of Oshkosh before proceeding with actual installation of this plumbing system or any of its parts. Sincerely, Richard Wood Plumbing Supervisor