Loading...
HomeMy WebLinkAboutBuilding Q7-122-1190B O.fHKOM City of Oshkosh ON THE WATER Nov. 29, 1990 Fred Litjens 1600 Rivermill Rd. Oshkosh, WI 54901 Dear Fred: RE: 2050 Winchester Ave. Storage garage File #Q7- 122 -1190B Building plans have been reviewed by this office for compliance with important code requirements. The drawings are stamped "Construction may proceed." All items that are required to be changed by this letter must be corrected before commencing that part of the work. This approval is not a Building Permit. Necessary city permits must be secured before commencing work. You are hereby advised that the owner, as defined in Chapter 101.01(i) of the Wisconsin State Statutes, is responsible for all code requirements not specifically cited herein. Code requirements are set forth in Chapters 50 through 64 of the rules of the Department of Industry, Labor and Human Relations. The building will be inspected during construction and a final inspection will be made after completion to insure complete compliance with city and state codes. The architect, professional engineer, builder or owner shall keep at the building, as evidence of approval, one set of plans bearing the stamp of approval. ILHR 64.02 This approval does not include heating and ventilating. Such plans are required to be submitted and approved prior to installation of such equipment. ILHR 59.13 An exit door at least 3'0" in width shall be provided in the larger storage area. ILHR 51.15 An exit lite shall be installed above each exit service door. Page Two Nov. 29, 1990 Fred Litjens ILHR 63.12(3) Slab on grade perimeter insulation shall be provided. This insulation shall have a minimum R value of 5.9 and shall extend a minimum of 48 inches horizontally around the perimeter of the heated storage area. ILHR 51.03(18) (19) The attic shall be separated into areas less than 3200 square feet. Each attic area shall be accessible by a 20 inch by 30 inch access panel. ILHR51.22 Fire extinguishers shall be provided and maintained in each storage section. ILHR 53 Submit a structural detail with calculations showing the header intended over the garage door in the heated storage area. This facility is only approved as a storage structure. Any other use will require further review. Sincerely, ALLYN DANNHOFF Chief Building Inspector AD :mr