Loading...
HomeMy WebLinkAbout0111856-Plumbing (toilet) #(14 CITY OF OSHKOSH No 111856 OSHKOSH PLUMBING PERMIT APPLICATION AND RECORD ON THE WATER Job Address 1712 WILSON AVE Owner JOAN C VAN DENSEN Create Date 12/02/2004 Contractor SAMMONS PLUMBING Category 410 Residential- Interior Plan Bathtub 0 Shower 0 Ejector /Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Sery Sink 0 Soda Disp 0 Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 Toilet 1 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Bar Sink 0 Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use /Nature of Work INSTALL TOILET Size Material Type Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 Parcel Id 0 1211860000 Valuation $250.00 Plan Approval $0.00 Permit Fees $20.00 Permit Voided Issued By Date 12/02/2004 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522 W. MURDOCK AVE OSHKOSH WI 54901 2298 Telephone Number 231 -9880 To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.