HomeMy WebLinkAbout0111967-Building CITY OF OSHKOSH No 111967
OSHKOSH BUILDING PERMIT APPLICATION AND RECORD Voss
ON THE WATER
TE
Job Address 1707 WILSON AVE Owner SEAN S /ELISSA A RUPPERT Create Date 12/10/2004
Designer Contractor OWNER
Category 140 Interior Remodeling Plan
Type Building 0 Sign 0 Canopy 0 Fence 0 Raze
Zoning Class of Const: Size
Unfinished /Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication Dwelling Units 0 Structures 0
Use /Nature SFR/ Remodeling the kitchen including new cabinets and extending a wall and shortening another wall to make room for a penninsula.
of Work Kitchen Specialists is the General contractor and P &N construction will be doing the installation.
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $15,000.00 Plan Approval $0.00 Permit Fee Paid $99.00 Park Dedication $0.00
Issued By: d Date 12/10/2004 Final /O.P. 00 /00 /0000
,w.-.
Permit Voided I Parcel Id 1212380000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
Address 1707 WILSON AVE OSHKOSH WI 54901 1746 Telephone Number
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.