Loading...
HomeMy WebLinkAbout0111967-Building CITY OF OSHKOSH No 111967 OSHKOSH BUILDING PERMIT APPLICATION AND RECORD Voss ON THE WATER TE Job Address 1707 WILSON AVE Owner SEAN S /ELISSA A RUPPERT Create Date 12/10/2004 Designer Contractor OWNER Category 140 Interior Remodeling Plan Type Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished /Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication Dwelling Units 0 Structures 0 Use /Nature SFR/ Remodeling the kitchen including new cabinets and extending a wall and shortening another wall to make room for a penninsula. of Work Kitchen Specialists is the General contractor and P &N construction will be doing the installation. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $15,000.00 Plan Approval $0.00 Permit Fee Paid $99.00 Park Dedication $0.00 Issued By: d Date 12/10/2004 Final /O.P. 00 /00 /0000 ,w.-. Permit Voided I Parcel Id 1212380000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1707 WILSON AVE OSHKOSH WI 54901 1746 Telephone Number To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.