HomeMy WebLinkAbout0112001-Plumbing 0 CITY OF OSHKOSH No 112001
OSHKOSH PLUMBING PERMIT APPLICATION AND RECORD
ON THE WATER
Job Address 1707 WILSON AVE Owner SEAN S /ELISSA A RUPPERT Create Date 12/14/2004
Contractor PLUMBING CONTRACTOR SPECIALISTS, LLC Category 410 Residential- Interior Plan
Bathtub 0 Shower 0 Ejector /Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Sery Sink 0 Soda Disp 0
Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0
Toilet 0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 Flr/Wst Sink 0 Int Grease Trap 0
Res. Sink 1 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Bar Sink 0 Dishwasher 1 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use /Nature Kitchen Remodel/ New kitchen sink and dishwasher.
of Work
Size Material Type Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0 Parcel Id
0 1212380000
Valuation 04.10 Plan Approval $0.00 Permit Fees $20.00 Permit Voided
Issued By Date 12/14/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement hol and t re an ary prov fore starting such activity.
Signature
��%CP Date /.'Z fr Ra
Agent/Owner
Address 1226 CHELSEA CT MENASHA WI 54952 0000 Telephone Number 920 749 -9121
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.