HomeMy WebLinkAbout09-408OCTOBER 27, 2009 09 -408 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 09 -04 WITH CARL BOWERS & SONS CONSTRUCTION CO, INC., FOR CONCRETE PAVING & UTILITIES ($44,434.82) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: CARL BOWERS & SONS CONSTRUCTION CO., INC. N1844 Maloney Rd Kaukauna, WI 54130 Net Increase to contract: $44,434.82 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 317 - 0410 - 7480 -03302 Special Assessments Fund - Sewer Acct. No. 317 - 0410 - 7480 -03303 Special Assessments Fund - Water Acct. No. 317 - 0410 - 7480 -03305 Special Assessments Fund - Storm Water Acct. No. 541 - 1841 - 1799 -00000 Water Utility Construction Work in Progress Acct. No. 551 - 1910 - 1799 -00000 Sewer Utility Construction Work in Progress Acct. No. 561 - 2010 - 1799 -00000 Storm Water Utility Constr. Work in Progress CONTRACT: 09 -04 CHANGE ORDER # 1 SECTION III - SANITARY SEWER ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION III 324 Additional labor, ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER to plug and re -core new Each QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT 440 hole in MH E -6 due to PRICE PRICE 324 Additional labor, ITEM equipment, and materials UNIT CONTRACT INSTALLED NET NET COST PER INCREASE /N DECREASE IN NUMBER to plug and re -core new Each QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT 440 hole in MH E -6 due to PRICE PRICE water main conflicts, per Lump Invoice #2031 Sum 1 1.00 1.00 $3,285.00 $3,285.00 325 Additional labor, equipment, and materials to remove existing concrete encased sanitary laterals on 11th Avenue, from Ohio St. to Georgia Lump Ave., per Invoice #2033 Sum 1.00 1.00 $4,187.50 $4,187.50 326 Additional labor, equipment, and "materials to core into existing MH 16- 524 in intersection of Sullivan St. and Lombard Ave., due to stub at wrong elevation and direction, per Lump Invoice #2035 Sum 1.00 1.00 $1,050.00 $1,050.00 327 Additional labor, equipment, and materials to connect additional sanitary later from Tan Lump Lines, per Invoice #2036 Sum 1.00 1.00 $1,260.00 $1,260.00 328 Additional labor, equipment, and materials to reconnect laterals at Lakeside Marina that were in conflict with storm sewer installation, per Invoice Lump #2045 Sum 1.00 1.00 $6,973.32 $6,973.32 ADDITIONAL WORK: C. 0. # 1 - (ITEMS 324 - 328) - SUB -TOTAL $16,755.82 $0.00 NET INCREASE TO: SECTION 111 $16,755.82 SECTION IV - WATER MAIN ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION IV 439 Furnish and install 8" solid ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE /N DECREASE IN NUMBER specified Each QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT 440 Furnish and install 8" PRICE PRICE 439 Furnish and install 8" solid sleeve, complete as specified Each 4.00 4.00 $275.00 $1,100.00 440 Furnish and install 8" 22 1/2 degree bends, complete asspecified Each 1 1 3.00 1 3.00 f $275.00 1 $825.00 Page 1 of 3 CONTRACT: 09 -04 CHANGE ORDER # 1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COSTPER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 441 Furnish and install 6x6" locking tee, complete as specified Each 1.00 1.00 $325.00 $325.00 442 Furnish and install 6 "x12" SSI sleeve, complete as sped ad Each 1.00 1.00 $300.00 $300.00 443 Furnish and install 8 "x12" SSI sleeve, complete as sped ied Each 1.00 1.00 $350.00 $350..00 444 Furnish and install 10 "x8" tee, complete as specified Each 5.00 5.00 $300.00 $1,500.00. 445 Furnish and install 10" solid sleeve, complete as specified Each 4.00 4.00 $300.00 $1,200.00 446 Furnish and install 6" solid sleeve, complete as specified Each 2.00 2.00 $225.00 $450.00 447 Furnish and install 10" 45 degree bends, complete asspecified Each 4.00 4.00 $300.00 $1,200.00 448 Furnish and install 10" gate valve, complete as specified Each 1.00 1.00 $2,200.00 $2,200.00 449 Furnish and install 10 "x10 "x6" tee, complete asspecified Each 1.00 1.00 $475.00 $475.00 450 Furnish and install 10" D.I. watermain, complete as Linear specified Foot 52.80 52.80 $80.00 $4,224.00 451 Additional labor, equipment, and materials to fix unmarked waterman that was hit in the intersection of 11th Ave. and Rugby Ave., per Lump Invoice # 2034 Sum 1.00 1.00 $2,010.00 $2,010.00 452 Additional labor, equipment, and materials to sleeve existing watermain. Plan called for a cut and cap, but due to a leaded tee, it was removed and sleeved, per Invoice Lump #2037 Sum 1.00 1.00 $955.00 $955.00 453 Additional labor, equipment, and materials to cut -in and sleeve existing waterman. Plan called for 8 "x10" tapping tees but Water Department requested cut -in, per Lump Invoice #2038 Sum 1.00 1.00 $930.00 $930.00 Page 2 of 3 CONTRACT: 09 -04 CHANGE ORDER # 1 ITEM DES CRIPTION UNIT CONTRACT INSTALLED NET NET COSTPER INCREASEIN CONTRACT DECREASEIN CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 454 Additional labor, equipment, and materials to lower the watermain that was in conflict with the storm sewer in the intersection of Hawk St. and Taft Ave., per Invoice Lump #2039 Sum 1.00 1.00 $3,975.00 $3,975.00 455 Additional labor, equipment and materials to lower new waterman that was in conflict with storm sewer after safe was taken, per Invoice #2040 Lump Sum 1.00 1.00 $670.00 $670.00 456 Additional labor, equipment, and material s to extend 10" watermain through the intersection of Hawk St. and Taft Ave., per Invoice #2041 Lump Sum 1.00 1.00 $4,990.00 $4,990.00 ADDITIONAL WORK: C.O. # 1 (ITEMS 439 - 456) - SUB -TOTAL $27,679.00 $0.00 NET INCREASE TO: SECTION IV $27,679.00 NET INCREASE TO CONTRACT: $44,434.82 Page 3 of 3 ( 0 OfHKOlH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works DATE: October 22, 2009 RE: Change Order #1 for Public Works Contract No. 09 -04; Concrete Paving and Utilities (South Side) ($44,434.82) BACKGROUND Change Order #1 for Contract 09 -04 is scheduled for consideration by the Common Council at the October 27, 2009 meeting. The contract was originally awarded to Carl Bowers & Sons Construction Co. Inc. in April of 2009. This change order is for various changes to sanitary sewer and water main items. The changes are a result of additional work needed to complete the project due to existing conditions underground. ANALYSIS Following is a summary of the significant additional work items performed for each section of the CIP. - Sanitary Sewer included additional labor and materials to adjust existing and new utilities to avoid conflicts. -Water Main included additional parts and fittings to adjust mains to avoid conflicts with other utilities and adjust to existing underground conditions. FISCAL IMPACT The Sanitary Sewer construction section of the contract increased by $16,755.82; of which $6,973.32 will be charged to the Storm Water Section of the CIP. The Water Main construction section of the contract increased by $27,679.00. The CIP budgeted amount for this contract are $975,000 for Sanitary Sewer , $1,320,00 for Storm Sewer and $1,095,000 for Water Main. The new contract totals are $594,190.82 for Sanitary Sewer, $786,340.22 for Storm Sewer and $608,644 for Water Main. Adequate funds are available in the Capital Improvement Budget in the utility sections. RECOMMENDATIONS I recommend approval of the Change Order #1 to Contact No. 09 -04 in the amount of $44,434.82 to Carl Bowers & Sons Construction Co. Inc. Respectfully �Submitted, Approved: Steven M. Gohde Asst. Director of Public Works City Manager I:\Engineering \09 -04 Concrete Paving - South Side\ Project_ Information \Correspondence\Memo \CO 91 exp.doc