HomeMy WebLinkAboutHWY US 41-STH 26-STH 21` STATE / MUNICIPAL AGREEMENT FOR A HIGHWAY IMPROVEMENT PROJECT DATE: June 12, 2009 The signatory City of Oshkosh, hereinafter called the Municipality, through its undersigned duly authorized officers or officials, hereby requests the State of Wisconsin Department of Transportation, hereinafter called the State, to initiate and effect the highway or street improvement hereinafter described. The authority for the Municipality to enter into this agreement with the State is provided by Section 86.25(1), (2), and (3) of the Statutes. NEEDS AND ESTIMATE SUMMARY: Existing Facility (describe and give reason for request): US 41 will be reconstructed from four to six lanes from STH 26 - Breezewood Lane. US 41 has reached its capacity and upgrading capacity will meet the future needs of the travelling public along with improving safety. Proposed Improvement (nature of work): Reconstruct 20' Avenue structure over US 41 to meet vertical clearance standards. Provide 8 foot wide sidewalk on north side of structure. Describe non - participating work included in the project contract: Sealing concrete pavement joints. Describe other work necessary to finish the project completely which will be undertaken independently by the Municipality: Relocation of water main in conflict with project will be relocated prior to project with its own City contract. PHASE ESTIMATED COST Federal / State Municipal Total Estimated Cost Funds % Funds % Construction (Participating): Project ID 1120 -10 -71 Category 0010 — Roadway Items $960,000 $960,000 100 $ 0 0 Category 0020 — B -70 -282 20"' Avenue $1,525,000 over US 41 Priorityl Funding - 2 ft extra sidewalk width on structure Priority 2- Balance $ 1,490,000 100 $35,000 LS Category 0030 — R -70 -27 $140,000 $140,000 100 $ 0 0 Category 0040 — R -70 -28 $630,000 $630,000 100 $0 0 Category 0050 — R -70 -29 $115,000 $115,000 100 $0 0 SUBTOTAL: $ 3,370,000 $.3,335,000 $35,000 Construction (Non- Participating): Category 0060 — Non - Participating — $ 8,000 $ 0 0 $8,000 100 Sealing Concrete Joints Construction SUBTOTAL: $3,378,000 $ 3,335,000 $43,000 TOTAL COST DISTRIBUTION: $ 3,378,000 $ 3,335,00 $ 43,000 n This request is subject to the terms and conditions that follow and is made by the undersigned under proper authority to make such a request for the designated Municipality and upon acceptance by the State shall constitute agreement between the Municipality and the State. Signed for and in behalf of See page 2A Name Title City .of Oshkosh Municipality 7 -15 -2009 Date 0) Signed for and in behalf of the City of Oshkosh p sww4 &4�17 0 - Peggy to no, Director of Finance I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. 2A Mark W. Rohloff, City Manager TERMS AND CONDITIONS: 1. The initiation and accomplishment of the improvement will be subject to the applicable Federal and State regulations. 2. The Municipality will pay to the State all costs incurred by the State in connection with the improvement which exceed Federal /State .financing commitments or are ineligible for Federal /State financing. 3. Funding of each project phase (preliminary engineering, real estate, construction, and other) is subject to inclusion in an approved program. Federal aid and/or State transportation fund financing will be limited to participation in the costs of the following items as specified in the estimate summary: a) The grading, base, pavement, and curb and gutter. b) Catch basins and inlets for surface water drainage of the improvement with connections to the storm sewer main. c) Construction engineering incidental to inspection and supervision of actual construction work. d) Signing and pavement marking including detour routes. e) Compensable utility adjustment. f) Storm Sewer mains necessary for the surface water drainage (does not include additional upsizing of storm sewer main requested by Municipality). g) Replacement of sidewalks and resurfacing of private driveways, necessitated by the project. h) New installations of street lighting and traffic signals or devices at the time of construction. i) Alteration of existing street lighting and traffic signal devices necessitated by the project. D Real estate for the improvement. k) Preliminary engineering and State review services. 4. Work necessary to complete the improvement to be financed entirely by the Municipality or other utility or facility owner includes the following items: a) New installations of or alteration of sanitary sewers and connections, water, gas, electric, telephone telegraph, fire or police alarm facilities, parking meters, and similar utilities. b) Damages to abutting property due to change in street or sidewalk widths, grades, or drainage. c) Conditioning, if required, and maintenance of detour routes. 3 Public Convenience and Safety A While performing any maintenance activities associated with this agreement, the Municipality shall comply with the following conditions. Maintain the safety of the traveling public and control traffic using warnings signs, cones, drums and flaggers. Materials and equipment cannot be stored on the right -of -way. 11. Basis for Local Participation: Construction Category 0010 - Construction of the roadway items for the project are 100% Federal/State funded. Construction Category 0020 — Construction of B -70 -282 20' Avenue structure over US 41 is 100% Federal /State Funded except for the Priority 1 Funding of L.S. $35,000 to the City of Oshkosh. The lump sum amount is for the 2 foot extra sidewalk width across the structure. WisDOT policy is to fund 6 foot wide sidewalk width. The additional cost for 2 foot width to build 8 foot sidewalk is City of Oshkosh responsibility. The $35,000 is calculated from roughly $71.77/sf cost based on recent WisDOT . bid projects. Construction — Category 0030 - Construction of R -70 -27 is 100% Federal /State funded. Construction — Category 0040 — Construction of R -70 -28 is 100% Federal /State Funded. Construction —,Category 0050 - Construction of R -70 -29 is 100% Federal /State Funded. Construction — Category 0060 — Non - participating item in the contract is sealing concrete pavement joints is 100 % City of Oshkosh funded. JUL 21 2009 OFFIC CITY C fi 5 5