TO: PTS Contractors Inc.
4075 Eaton Road
Green Bay, WI 54311
Your present contract with the City of Oshkosh, Contract No
and changed as follows:
NET DECREASE TO: SECTION I - CONCRETE PAVING
NET INCREASE TO: SECTION II - STORM SEWER .
NET INCREASE TO: SECTION III -SANITARY SEWER
NET INCREASE TO: SECTION IV -WATER MAIN
NET INCREASE TO CONTRACT:
IV
Recommended:
A"lic, (Cla-1k
Director of Public Works
CHANGE ORDER # 2
DATED: August 7, 2009
09 -03 , is hereby amended
($14,414.85)
$12,059.50
$3,112.84
$37,462.46
$38,219.95
CITY OF OSHKOSH
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
omptroller
--
App Roved as to form
City Atto ey
Approved and accepted:
Cont
CONTRACT: 09 -03 CHANGE ORDER # 2
SECTION I - CONCRETE PAVING
100
Pavement removal,
Square
INCREASE IN
DECREASE IN
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
Sidewalk and driveway
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
100
Pavement removal,
Square
complete asspecified
Yards
5,010
3,318.91
- 1,691.09
$0.01
($16.91)
101
Sidewalk and driveway
removal, complete as
Square
specified
Feet
22,615
6,945.60
- 15,669.40
$0.01
($156.69)
102
8" non - reinforced concrete
pavement, including
integral curb, 6" base
material and grading,
complete as specified
Square
Yards
2,580
2,935.91
355.91
$34.20
$12,172.12
103
Standard 30" curb and
gutter, complete as
Linear
specified
Feet
990
175.90
- 814.10
$9.80
($7,978.18)
104
4" Concrete sidewalk,
Square
complete asspecified
Feet
140
258.00
118.00
$3.35
$395.30
105
3 1/2" asphaltic concrete
driveway, complete as
Square
specified
Feet
8,430
6,945.60
- 1,484.40
$2.57
($3,814.91)
106
2 3/4" asphaltic concrete
pavement, lower layer,
complete as specified
Tons
330
143.84
- 186.16
$94.00
($17,499.04)
107
2 1/4" asphaltic concrete
pavement, upper layer,
complete as specified
Tons
265
161.98
- 103.02
$61.50
$6,335.73)
108
Tack or prime coat,
complete asspecified
Gallon
50
39.21
-10.79
$310.00
($3,344.90)
109
Preparation of foundation
for asphalt paving on
Koeller Street, complete
Lump
asspecified
Sum
1
1.00
$1,400.00
110
Preparation of foundation
for asphalt paving on
Oshkosh Avenue,
Lump
complete asspecified
Sum
1
1.00
$3,700.00
111
Furnish and install
crushed stone base
course, complete as
specified
Tons
1,695
0.00
- 1,695.00
$11.85
($20,085.75)
112
Sawing, complete as
Linear
specified
Feet
6,230
3,864.90
- 2,365.10
$1.15
($2,719.87)
113
Furnish and install
pavement ties (epoxy
coated), complete as
, specified
Each
955
936.00
-19.00
$3.60
($68.40)
114
Adjust manholes and
inlets, complete as
specified
Each
17
20.00
3.00
$351.50
$1,054.50
115
Furnish and install No. 4
reinforcing bars (epoxy
coated), complete as
Linear
specified
Feet
60
1,200.00
1,140.00
$2.10
$2,394.00
116
Clearing and grubbing,
Lump
T
complete ass specified
Sum
1
1.00
$3,900.00
Page 1 of 9
CONTRACT: 09 -03 CHANGE ORDER # 2
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COSTPER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
square yard for using 7-
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
117
Topsoil, seed, fertilizer
UNIT
CONTRACT
CONTRACT
NUMBER
and erosion mat,
Square
QUANTITIES
QUANTITIES
IN
DECREASE
UNIT
complete asspecified
Yards
15,540
9,506.10
- 6,033.90
$3.40
PRICE
($20,515.26
118
Excavation, Special,
Yards
281.67
281.67
$5.50
$1,549.19
128
complete asspecified
Tons
450
979.69
529.69
$33.65
$17,824.07
119
Furnish, install, maintain
Square
1
and remove inlet
Yards
8,910.00
8,910.00
$2.68
$23,878.80
protection type A, as
shown on the plans,
, complete asspecified
Each
5
0.00
-5.00
$140.00
($700.00)
120
Furnish, install, maintain
and remove inlet
protection type C, as
shown on the plans,
complete asspecified
Each
25
2.00
-23.00
$55.00
($1,265.00)
121
Furnish, install, maintain
and remove culvert pipe
ditch checks, as shown on
the plans, complete as
specified
Each
1
8.00
7.00
$170.00
$1,190.00
122
Furnish, install, maintain
and remove tracking
pads, as shown on the
plans, complete as
, specified
Each
4
2.00
-2.00
$800.00
($1,600.00)
123
Furnish, install, maintain
and remove silt fence, as
shown on the plans,
Linear
complete asspecified
Feet
2,250
1,102.00
- 1,148.00
$1.18
($1,354.64
124
Furnish, install, maintain
and remove traffic control,
Lump
complete as specified
Sum
1
1.00
$5,000.00
125
From C.O. #1 - Furnish,
install, maintain and
remove Inlet Protection,
Type D
Each
25
24.00
-1.00
$140.00
($140.00)
SECTION I - (BID ITEMS 100 -124) - SUB - TOTALS $35,029.99 ($87,595.28)
ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION I
127
Additional price per
INCREASE IN
DECREASE IN
ITEM
square yard for using 7-
CONTRACT
INSTALLED
NET
NET
COST PER
DESCRIPTION
UNIT
CONTRACT
CONTRACT
NUMBER
reinforced concrete
QUANTITIES
QUANTITIES
IN
DECREASE
UNIT
pavement with 6" base &
Square
PRICE
PRICE
127
Additional price per
square yard for using 7-
bag H.E.S. 8" non -
reinforced concrete
pavement with 6" base &
Square
a radinq
Yards
281.67
281.67
$5.50
$1,549.19
128
Furnish and install topsoil,
fertilizer, seed and mulch
Square
1
Yards
8,910.00
8,910.00
$2.68
$23,878.80
Page 2 of 9
CONTRACT: 09 -03 CHANGE ORDER # 2
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
129
Additional days required
Each
QUANTITIES
QUANTITIES
IN
DECREASE
UNIT
PRICE
PRICE
206
for message boards on
Each
1
2.00
1.00
$900.00
$900.00
202
Washburn Ave. for
crossing of sanitary sewer
LF
200.00
200.00
$19.50
$3,900.00
, specified
Days
1
8.00
8.00
1 $100.00
$800.00
130
Furnish and install 2 1/2"
Asphaltic concrete
Linear
driveway skim patch in the
Feet
45
184.00
139.00
$45.50
$6,324.50
204
parking lot for "The Bar"
Square
concrete collar, complete
Yards
593.22
593.22
$14.83
$8,797.45
131
Furnish and install topsoil,
Each
1
0.00
-1.00
$375.00
($375.00)
fertilizer, seed and mulch
D.O.T. stockpile site on
Oshkosh Ave. per D.O.T.
agreed price
Acres
5.00
5.00
$625.00
$3,125.00
ADDITIONAL WORK: C.O. #2 -(ITEMS 127 -131) - SUB -TOTAL $38,150.44 $0.00
NET DECREASE TO: SECTION I . ($14,414.85)
SECTION II - STORM SEWER
200
Inlet removal, complete as
INCREASE IN
DECREASE IN
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
Furnish and install inlet,
Each
QUANTITIES
QUANTITIES
IN
DECREASE
UNIT
PRICE
PRICE
200
Inlet removal, complete as
INCREASE IN
DECREASE IN
ITEM
specified
Each
2
3.00
1.00
NET
$110.00
$110.00
CONTRACT
201
Furnish and install inlet,
Each
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
206
complete asspecified
Each
1
2.00
1.00
$900.00
$900.00
202
Furnish and install field
inlet, complete as
LF
200.00
200.00
$19.50
$3,900.00
, specified
Each
1
1.00
$850.00
203
Furnish and install 12"
storm sewer pipe,
Linear
complete asspecified
Feet
45
184.00
139.00
$45.50
$6,324.50
204
Furnish and install
concrete collar, complete
asspecified
Each
1
0.00
-1.00
$375.00
($375.00)
SECTION II - (BID ITEMS 200 - 204) - SUB - TOTALS $7,334.50 ($375.00)
ADDITIONAL WORK REQUIRED: C.O. # 2- SECTION II
205
Furnish and install 4"
INCREASE IN
DECREASE IN
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
Robin Avenue
Each
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
205
Furnish and install 4"
diameter inlet manhole on
Robin Avenue
Each
1.00
1.00
$1,200.00
$1,200.00
206
Furnish and install 6"
perforated drain tile in
easement
LF
200.00
200.00
$19.50
$3,900.00
ADDITIONAL WORK: C.O. # 2 - (ITEMS 205 - 206) - SUB -TOTAL
NET INCREASE TO: SECTION II
$5,100.00 $0.00
$12,059.50
Page 3 of 9
CONTRACT: 09 -03 CHANGE ORDER # 2
SECTION III - SANITARY SEWER
Furnish and install 8"
INCREASE IN
DECREASE IN
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
I NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
SECTION III - SANITARY SEWER
300
Furnish and install 8"
INCREASE IN
DECREASE IN
ITEM
sanitary sewer (PVC
CONTRACT
INSTALLED
NET
NET
COSTPER
DESCRIPTION
UNIT
CONTRACT
CONTRACT
NUMBER
specified
Feet
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
$10,766.25
301
Furnish and install 8"
PRICE
PRICE
300
Furnish and install 8"
sanitary sewer (PVC
Pipe), complete as
Linear
specified
Feet
775
887.50
112.50
$95.70
$10,766.25
301
Furnish and install 8"
sanitary sewer drop,
Vertical
. Complete asspecified
Feet
7
7.00
$465.00
302
Furnish and install 12"
sanitary sewer (PVC
Pipe), complete as
Linear
specified
Feet
1,400
1,410.00
10.00
$66.15
$661.50
303
Furnish and install 15"
sanitary sewer (PVC
Pipe), complete as
Linear
, specified
Feet
40
34.50
-5.50
$230.00
($1,265.00)
304
Furnish and install 21"
sanitary sewer (PVC
Pipe), complete as
Linear
specified
Feet
1,100
1,116.90
16.90
$111.60
$1,886.04
305
Furnish and install 24"
sanitary sewer (PVC
Pipe), complete as
Linear
specified
Feet
425
426.00
1.00
$102.00
$102.00
306
Jack and bore 36" steel
casing pipe, complete as
Linear
specified
Feet
120
120.00
$435.00
307
Jack and bore 42" steel
casing pipe, complete as
Linear
specified
Feet
225
225.00
$520.00
308
Furnish and install std.
sanitary manhole
(4' inside diameter),
complete as specified
Vertical
Without casting
Feet
242
242.20
0.20
$154.25
$30.85
309
Furnish and install 8" x 4"
factory wye, complete as
specified
Each
2
4.00
2.00
$62.00
$124.00
310
Furnish and install 8" x 6"
factory wye, complete as
specified
Each
1
0.00
-1.00
$64.00
($64.00)
311
Furnish and install 12" x
4" factory wye, complete
asspecified
Each
2
4.00
2.00
$155.00
$310.00
312
Furnish and install 12" x
6" factory wye, complete
asspecified
Each
3
5.00
2.00
$170.00
$340.00
313
Furnish and install 4 "76"
sanitary sewer lateral,
Linear
complete asspecified
Feet
125
211.00
86.00
$76.00
$6,536.00
Page 4 of 9
CONTRACT: 09 -03 CHANGE ORDER # 2
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
314
Furnish and install
Each
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
I PRICE
323
connections of new
sanitary main to existing
Cubic
main, (various locations
Yards
1
80.00
80.00
$76.50
$6,120.00
324
and sizes), complete as
specified
Each
3
8.00
5.00
$500.00
$2,500.00
315
Abandon sanitary
manholes, complete as
specified
Each
9
8.00
2.00
-1.00
$425.00
$9,142.00
($425.00)
316
Abandon sanitary sewer
on Washburn Street,
Lump
complete asspecified
Sum
1
1.00
$560.00
317
Abandon sanitary sewer
on Robin Avenue,
Lump
complete asspecified
Sum
1
1.00
1.00
$113.00
$3,600.00
318
Abandon sanitary sewer
on Oshkosh Avenue,
Lump
, complete asspecified
Sum
1
1.00
$560.00
319
Furnish and install _
sanitary lateral marker
balls, complete as
specified
Each
14
35.00
21.00
$40.00
$840.00
320
Remove existing sanitary
sewer manhole, complete
ass ecified
Each
5
5.00
$225.00
321
Rock excavation,
Cubic
1 complete as s ecified
Yards
450
55.90
- 394.10
$98.00
($38,621.80)
SECTION III - (BID ITEMS 300 - 321) - SUB - TOTALS $24,096.64 ($40,375.80)
ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION III
322
Furnish & install 6" insert
INCREASE IN
DECREASE IN
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
sanitary laterals
Each
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
I PRICE
322
Furnish & install 6" insert
A -Tees for additional
sanitary laterals
Each
2.00
2.00
$265.00
$530.00
323
Furnish & install slurry
backfill for abandonment
Cubic
of 21" sanitary sewer
Yards
1
80.00
80.00
$76.50
$6,120.00
324
Additional crew days
required for installing
sanitary sewer due to
delays from unmarked
utilities
Days
2.00
2.00
$4,571.00
$9,142.00
325
Additional cost for blasting
sub- contractor due to
large change of quantity,
per Paschke Drilling &
Blasting Invoice #6210,
Lump
lump sum
Sum
1.00
1.00
$3,600.00
$3,600.00
ADDITIONAL WORK: C. O. # 2 - (ITEMS 322 - 325) - SUB -TOTAL $19,392.00 $0.00
NET INCREASE TO: SECTION III $3,112.84
Page 5 of 9
CONTRACT: 09 -03 CHANGE ORDER # 2
ITEM
Furnish and install 4"
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
NUMBER
with poly wrap, complete
QUANTITIES
QUANTITIES
IN
DECREASE
UNIT
PRICE
PRICE
as specified (fittings not
Linear
PRICE
PRICE
SECTION IV - WATER MAIN
ITEM
Furnish and install 4"
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
with poly wrap, complete
PRICE
PRICE
400
Furnish and install 4"
ductile iron water main
with poly wrap, complete
as specified (fittings not
Linear
included )
Feet
30
27.00
-3.00
$71.50
($214.50)
401
Furnish and install 6"
ductile iron water main
with poly wrap, complete
as specified (fittings not
Linear
included )
Feet
285
271.40
-13.60
$73.50
($999.60)
402
Furnish and install 8"
ductile iron water main
with poly wrap, complete
as specified (fittings not
Linear
included )
Feet
40
56.50
16.50
$83.00
$1,369.50
403
Furnish and install 12"
ductile iron water main
with poly wrap, complete
as specified (fittings not
Linear
included )
Feet
300
310.40
10.40
$64.00
$665.60
404
Furnish and install 16"
ductile iron water main
with poly wrap, complete
as specified (fittings not
Linear
included )
Feet
4,400
4,589.70
189.70
$81.90
$15,536.43
405
Jack and bore 24" steel
casing pipe, complete as
Linear
specified
Feet
225
225.00
$274.00
406
Jack and bore 30" steel
casing pipe, complete as
Linear
specified
Feet
715
717.00
2.00
$320.00
$640.00
407
Reconnect 1" water
services, complete as
specified
Each
13
14.00
1.00
$296.00
$296.00
408
Furnish and install 1"
water service, complete
as specified, not including
corporation and stop box
Linear
Feet
375
352.00
-23.00
$62.00
($1,426.00)
409
Furnish and install 1"
corporation and stop box
with rod, complete as
specified
Each
13
14.00
1.00
$215.00
$215.00
410
Furnish and install 16" x
4" tees, complete as
. specified
Each
1
0.00
-1.00
$950.00
($950.00)
411
Furnish and install 16" x
6" tees, complete as
specified
Each
9
11.00
2.00
$925.00
$1,850.00
412
Furnish and install 16" x
8" tees, complete as
specified
Each
2
3.00
1.00
$925.00
$925.00
Page 6 of 9
CONTRACT: 09 -03 CHANGE ORDER # 2
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
413
Furnish and install 16" x
12" tees, complete as
specified
Each
1
1.00
$950.00
414
Furnish and install 16" x
16" tees, complete as
specified
Each
1
3.00
2.00
$1,075.00
$2,150.00
415
Furnish and install 8" x 6"
reducers, complete as
s ecified -
Each
1
0.00
-1.00
$175.00
($175.00)
416
Furnish and install 12" x
8" reducers, complete as
specified
Each
1
1.00
$240.00
417
Furnish and install 12" x
10" reducers, complete as
specified
Each
1
1.00
$260.00
418
Furnish and install 16"
x12" reducers, complete
ass ecified
Each
1
1.00
$485.00
419
Furnish and install 12" -
45 degree bends,
complete asspecified
Each
2
3.00
1.00
$428.00
$428.00
420
Furnish and install 16" -
11.25 degree bends,
complete asspecified
Each
6
0.00
-6.00
$695.00
($4,170.00)
421
Furnish and install 16" -
22.5 degree bends,
complete asspecified
Each
6
10.00
4.00
$700.00
$2,800.00
422
Furnish and install 16" -
45 degree bends,
complete asspecified
Each
12
9.00
-3.00
$695.00
$2,085.00)
423
Furnish and install 16" x
8" cross, complete as
specified
Each
1
0.00
-1.00
$1,400.00
($1,400.00)
424
Furnish and install 6" plug,
complete as specified
Each
3
2.00
-1.00
$84.00
($84.00)
425
furnish and install 16"
plug, complete as
specified
Each
1
5.00
4.00
$262.00
$1,048.00
426
Furnish and install 6"
valves, complete as
specified
Each
9
12.00
3.00
$828.00
$2,484.00
427
Furnish and install 8"
valves, complete as
specified
Each
1
3.00
2.00
$1,142.00
$2,284.00
428
Furnish and install 12"
valves, complete as
specified
Each
1
3.00
2.00
$1,980.00
$3,960.00
429
Furnish and install 16"
valves, complete as
s ecified
Each
12
14.00
2.00
$5,485.00
$10,970.00
430
Furnish and install 16" x
6" tapping sleeve and
valve, complete as
specified
Each
2
2.00
$2,150.00
Page 7 of 9
CONTRACT: 09 -03 CHANGE ORDER # 2
ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION IV
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE 1N
DECREASE IN
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION IV
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
446
Furnish & install 8" -
45° bends, complete as
specified
EACH
2.00
2.00
$222.45
$444.90
447
Furnish & install 4" -
45° bends, complete as
specified
EACH
2.00
2.00
$280.22
$560.44
448
Furnish & install 12" cap,
complete as specified
EACH
1.00
1.00
$158.60
$158.60
449
Furnish & install 8" -
90° bend, complete as
specified
EACH
1.00
1.00
$222.45
$222.45
450
Furnish & install 8" -
22 1/2° bend complete as
specified
EACH
1.00
1.00
$222.45
$222.45
451
Furnish & install 8" X 6"
Tee, complete as
specified
EACH
1.00
1.00
$306.00
$306.00
452
Furnish & install 12" -
22 1/2° bend complete as
specified
EACH
1.00
1.00
$428.00
$428.00
453
Dig up & cut 16"
watermain out of way for
30" casing pipe, per
invoices # 09- 5450SH -5
& Boremaster Invoice
LUMP
#1511
SUM
1.00
1.00
$4,631.99
$4,631.99
454
Additional labor for
Saturday work due to
timing of waterman tie -in
to minimize disruption of
service to residents, per
LUMP
Invoice # 09- 5450SH -7
SUM
1.00
1.00
$764.95
$764.95
455
Dig down to cap off 12"
waterman & plug holes on
12" watermain, per
LUMP
Invoice # 09- 5450SH -6
SUM
1.00
1.00
$3,467.57
$3,467.57
456
Move receiving pit 10'
south on Koeller St., per
LUMP
Invoice # 09- 5450SH -4
SUM
1.00
1.00
$1,048.38
$1,048.38
457
Remove 2 - 6" water
valves off watermain on
Washburn Ave., per
LUMP
Invoice # 09- 5450SH -3
SUM
1.00
1.00
$2,286.65
$2,286.65
ADDITIONAL WORK: C.O. # 2 (ITEMS 446 457) - SUB -TOTAL $14,542.38 $0.00
NET INCREASE TO: SECTION IV $37,462.46
NET INCREASE TO SECTIONS I, II, III, IV $194,548.18
NET DECREASE TO SECTIONS I, II, III, IV ($156,328.23)
NET INCREASE TO CONTRACT: $38,219.95