HomeMy WebLinkAboutPW CNT 09-05/CNG # 2CHANGE ORDER # 2
DATED: September 11, 2009
TO: Four -Way Construction of WI Inc.
P O Box 133
Berlin, WI 54923
Your present contract with the City of Oshkosh, Contract No.
and changed as follows:
NET DECREASE TO: SECTION I - CONCRETE PAVING
NET INCREASE TO: SECTION III - SANITARY SEWER
NET DECREASE TO: SECTION IV WATER MAIN
NET DECREASE TO CONTRACT:
Recommended:
Director of Public Works
Approved and acce d:
c
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
mptroller
09 -05 , is hereby amended
($84,802.47)
$2,569.25
($53,463.70)
($135,696.92)
CITY OF OSHKOSH
BY: 'e4—
L City Manag
City Clerk
% W"
I ' l A, I WE MON
Mon
CONTRACT: 09 -05 CHANGE ORDER # 2
SECTION I - CONCRETE PAVING
ITEM
Pavement removal,
Square
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
IN
DECREASE
UNIT
CONTRACT
CONTRACT
101
Sidewalk and driveway
PRICE
PRICE
100
Pavement removal,
Square
complete asspecified
Yards
6,300
3,822.13
- 2,477.87
$2.00
($4,955.74)
101
Sidewalk and driveway
removal, complete as
Square
specified
Feet
755
1,300.00
545.00
$0.45
$245.25
102
Standard 30" curb and
gutter, complete as
Linear
specified
Feet
120
26.00
-94.00
$23.00
($2,162.00)
103
31/2" asphaltic concrete
driveway, complete as
Square
specified
Feet
755
1,112.00
357.00
$3.30
$1,178.10
104
2 3/4" asphaltic concrete
pavement, lower layer,
complete asspecified
Tons
940
674.75
- 265.25
$75.90
$20,132.48)
105
2 1/4" asphaltic concrete
pavement, upper layer,
complete asspecified
Tons
770
602.47
- 167.53
$54.85
($9,189.02)
106
Tack or prime coat,
complete asspecified
Gallon
155
196.08
41.08
$3.00
$123.24
107
Preparation of foundation
for asphalt paving on
Fernau Avenue, complete
Lump
asspecified
Sum
1
1
$4,000.00
108
Preparation of foundation
for asphalt paving on Snell
Road, complete as
Lump
specified
Sum
1
1
$3,820.00
109
Preparation of foundation
for asphalt paving on USH
Lump
45, complete asspecified
Sum
1
1
$1,450.00
110
Furnish and install crushed
stone base course,
complete as specified
Tons
4,200
1 111.92
1
- 4,088.08
$8.75
($35,770.70)
111
Sawing, complete as
Linear
specified
Feet
2,265
2,049.50
- 215.50
$1.10
($237.05)
112
Adjust manholes and inlets,
complete as specified
Each
9
9.00
$200.00
113
Clearing and grubbing,
Lump
complete asspecified
Sum
1
1
$1,000.00
114
Topsoil, seed, fertilizer and
_
erosion mat, complete as
Square
specified
Yards
15,460
1,060.21
- 14,399.79
$3.25
($46,799.32)
115
Furnish, install, maintain
and remove inlet protection
type D, as shown on the
plans, complete as
specified
Each
10
15.00
5.00
$90.00
$450.00
116
Furnish, install, maintain
and remove culvert pipe
ditch checks, as shown on
the plans, complete as
specified
Each
2
2
$50.00
Page 1 of 6
CONTRACT: 09 -05 CHANGE ORDER # 2
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
117
Furnish, install, maintain
Square
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
and remove ditch checks,
Yard
560
139.11
139.11
$3.42
$475.76
124
as shown on the plans,
Square
[ complete asspecified
Each
4
8
4.00
$75.001
$300.00
118
Furnish, install, maintain
Feet
8
3.30
-4.70
$200.00
$940.00)
302
and remove tracking pads,
as shown on the plans,
complete as specified
Each
4
3
-1.00
$500.00
($500.00)
119
Furnish, install, maintain
Feet
1,860
1,859.00
-1.00
$61.15
($61.15)
303
and remove silt fence, as
shown on the plans,
Linear
, complete asspecified
Feet
4,826.00
- 3,124.00
$1.40
($4,373.60
120
Furnish, install, maintain
Feet
1 1,700
1,669.00
-31.00
$20.40
($632.40)
and remove traffic control,
]
Lump
com lete ass ecified
Sum
1.00
$4,500.00
SECTION I - (BID ITEMS 100 -120) - SUB - TOTALS $2,296.59 ($124,119.91)
ADDITIONAL WORK REQUIRED: C.O. #2- SECTION I
ITEM
Topsoil, seed, fertilize and
Square
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
123
Topsoil, #70 seed, fertilize
Square
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
122
Topsoil, seed, fertilize and
Square
INCREASE IN
DECREASE IN
ITEM
mulch
Yard
CONTRACT
10,535.72
10,535.72
NET
$3.03
$31,923.23
CONTRACT
123
Topsoil, #70 seed, fertilize
Square
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
and ematt
Yard
560
139.11
139.11
$3.42
$475.76
124
Topsoil, #70 seed, fertilize
Square
and mulch
Yard
1,444.33
1,444.33
$3.20
$4,621.86
ADDITIONAL WORK: C.O. # 2 - (ITEMS 122 - 124) - SUB -TOTAL $37,020.85 $0.00
NET DECREASE TO: SECTION 1 ($84,802.47)
SECTION III - SANITARY SEWER
300
Furnish and install 8"
INCREASE IN
DECREASE IN
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
complete as specified
Linear
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
300
Furnish and install 8"
sanitary sewer (PVC Pipe),
complete as specified
Linear
Feet
560
568.00
8.00
$36.30
$290.40
301
Furnish and install 8"
sanitary sewer drop,
Vertical
complete asspecified
Feet
8
3.30
-4.70
$200.00
$940.00)
302
Furnish and install 24"
sanitary sewer (PVC Pipe),
complete as specified
Linear
Feet
1,860
1,859.00
-1.00
$61.15
($61.15)
303
Furnish and install 10"
sanitary sewer force main
(PVC Pipe), complete as
Linear
, specified
Feet
1 1,700
1,669.00
-31.00
$20.40
($632.40)
Page 2 of 6
CONTRACT: 09 -05 CHANGE ORDER # 2
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
304
Furnish and install 12"
sanitary sewer force main
(PVC Pipe), complete as
Linear
s ecified
Feet
1,700
1 1,667.00
-33.00
$23.00
$759.00)
305
Jack and bore 24" steel
casing pipe, complete as
Linear
specified
Feet
1,170
1,170.00
$240.00
306
Furnish and install std.
sanitary manhole (4' inside
diameter), complete as
Vertical
specified without casting
Feet
84
86.72
2.72
$165.00
$448.80
307
Furnish and install std.
sanitary manhole (6' inside
diameter), complete as
Vertical
specified without casting
Feet
9
8.78
-0.22
$335.00
($73.70)
308
Furnish and install 10" -
11.25 degree bends,
complete asspecified
Each
3
3.00
$320.00
309
Furnish and install 10" - 45
degree bends, complete as
specified
Each
5
3.00
-2.00
$320.00
($640.00)
310
Furnish and install 12" -
11.25 degree bends,
complete asspecified
Each
3
3.00
$380.00
311
Furnish and install
connections of new
sanitary main to existing
main, (various locations
and sizes), complete as
. specified
Each
3
5.00
2.00
$835.00
$1,670.00
312
Abandon sanitary
manholes, complete as
specified
Each
2
2.00
$250.00
313
Abandon sanitary sewer on
Fernau Avenue, complete
Lump
asspecified
Sum
1
1.00
$500.00
314
Abandon sanitary sewer on
Snell Road, complete as
Lump
specified
Sum
1
1.00
$500.00
315
Abandon sanitary sewer
force main on USH 45,
Lump
, complete
asspecified
Sum
1
1.00
$800.00
316
Remove existing sanitary
sewer manhole, complete
asspecified
Each
1
2.00
1.00
$400.00
$400.00
SECTION III - (BID ITEMS 300 - 316) - SUB - TOTALS $2,809.20 ($3,106.25)
Page 3 of 6
CONTRACT: 09 -05 CHANGE ORDER # 2
ITEM
Additional price pre foot to
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE /N
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
from
Pipe through Casing Pipe,
Linear
9.00
9.00
$20.00
PRICE
PRICE
ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION 111
ITEM
Additional price pre foot to
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
from
Pipe through Casing Pipe,
Linear
9.00
9.00
$20.00
PRICE
PRICE
CHANGES TO ITEMS 317 - 318 FROM CHANGE ORDER #1
317
Additional price pre foot to
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
Changes
use 10" C -900 Cert-a -lok
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
from
Pipe through Casing Pipe,
Linear
9.00
9.00
$20.00
$180.00
PRICE
Co #1
complete as specified
Foot
400.00
390.00
-10.00
$13.35
($133.50)
318
Additional price per foot to
Feet
75
58.00
-17.00
$32.10
($545.70)
Changes
use 12" C -900 Cert-a -lok
Each
1.00
1.00
$340.00
$340.00
from
Pipe through casing pipes,
CO #1
complete as specified
Each
400.00
390.00
-10.00
$17.42
1 ($174.20)
ADDITIONAL WORK REQUIRED: ITEMS # 321 - 325
321
Furnish & install sanitary
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
sewer marker balls,
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
complete asspecified
Each
9.00
9.00
$20.00
$180.00
PRICE
322
Furnish and install
Linear
10" 22.5 degree bends,
Feet
75
58.00
-17.00
$32.10
($545.70)
401
, complete asspecified
Each
1.00
1.00
$340.00
$340.00
323
Furnish and install
12" 22.5 degree bends,
complete asspecified
Each
1.00
1.00
$400.00
$400.00
324
Furnish and install tracer
Feet
1,755
523.00
- 1,232.00
$31.65
$38,992.80)
402
boxes & posts, complete as
.specified
ductile iron water main with
Each
12.00
12.00
$120.00
$1,440.00
325
Install Storm Sewer around
at Manhole # FER102, (per
Lump
Extra #2 )
Sum
490
1.00
1.00
-3.00
$814.00
$814.00
($166.50)
ADDITIONAL WORK: C. O. # 2 - (ITEMS 317 -318 & 321 -325) - SUB -TOTAL $3,174.00 ($307.70)
NET INCREASE TO: SECTION III $2,569.25
SECTION IV - WATER MAIN
ITEM
Furnish and install 6"
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
poly wrap, complete as
PRICE
PRICE
400
Furnish and install 6"
ductile iron water main with
poly wrap, complete as
specified (fittings not
Linear
included )
Feet
75
58.00
-17.00
$32.10
($545.70)
401
Furnish and install 8"
ductile iron water'main with
poly wrap, complete as
specified (fittings not
Linear
included )
Feet
1,755
523.00
- 1,232.00
$31.65
$38,992.80)
402
Furnish and install 12"
ductile iron water main with
poly wrap, complete as
specified (fittings not
Linear
included )
Feet
490
487.00
-3.00
$55.50
($166.50)
403
Item Deleted
Linear
Feet
0
0.00
$0.00
Page 4 of 6
CONTRACT: 09 -05 CHANGE ORDER # 2
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
CONTRACT
DECREASE 1N
CONTRACT
NUMBER
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
404
Furnish and install 8" x 6"
tees, complete as specified
Each
4
1.00
-3.00
$285.00
($855.00)
405
Furnish and install 12" x 6"
tees, complete as specified
Each
3
3.00
$435.00
406
Furnish and install 8" x 6"
reducers, complete as
, specified
Each
1
1.00
$180.00
407
Furnish and install 8" - 22.5
degree bends, complete as
specified
Each
4
1.00
-3.00
$220.00
($660:00)
408
Furnish and install 8" - 45
degree bends, complete as
specified
Each
14
9.00
-5.00
$220.00
($1,100.00)
409
Furnish and install 12"
plug, complete as specified
Each
1
1.00
$91.00
410
Furnish and install 6"
valves, complete as
, specified
Each
6
4.00
-2.00
$810.00
($1,620.00)
411
Furnish and install 8"
valves, complete as
specified
Each
5
2.00
-3.00
$1,010.00
$3,030.00)
412
Furnish and install 12"
valves, complete as
. specified
Each
2
2.00
$1,950.00
413
Furnish and install 12" x 8"
tapping sleeve and valve,
complete as specified
Each
1
1.00
$2,130.00
414
Furnish and install 16" x
12" tapping sleeve and
valve, complete as
specified
Each
1
1.00
$3,805.00
415
Furnish and install
hydrants, complete as
specified
Each
7
5.00
-2.00
$2,400.00
$4,800.00)
416
Furnish and install
gradeloks for hydrant
branches, complete as
specified
Each
7
0.00
-7.00
$290.00
$2,030.00)
417
Furnish and install
connections of new water
main to existing main,
(various locations and
sizes), complete as
. specified
Each
1
2.00
1.00
$930.00
$930.00
418
Abandon water main on
Westwind Avenue,
Lump
complete asspecified
Sum
1
1.00
$2,000.00
419
Abandon water main on
Snell Road, complete as
Lump
specified
Sum
1
1.00
$2,000.00
420
Furnish and install low
permeable plugs, complete
asspecified
Each
2
0.00
-2.00
$100.00
($200.00)
SECTION IV - (BID ITEMS 400 - 420) - SUB - TOTALS $930.00 ($54,000.00)
Page 5 of 6
CONTRACT: 09 -05 CHANGE ORDER # 2
ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION IV
ITEM
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE INUMBER
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRAC
CO #1
as specified
Each
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
427
Furnish and install 6"
PRICE
PRICE
ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION IV
ITEM
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
Changes
DESCRIPTION
UNIT
CONTRACT
CONTRACT
NUMBER
45 degree bends, complete
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CO #1
as specified
Each
3.00
4.00
1.00
$860.00
PRICE
PRICE
CHANnF3 Tin ITFMR A99 A97 A90 FRAM r.14AKIrF IlPnFR AI
422
Changes
Furnish and install 16"
from
45 degree bends, complete
CO #1
as specified
Each
3.00
4.00
1.00
$860.00
$860.00
427
Furnish and install 6"
Changes
45 degree bends, complete
from
as specified
CO #1
Each
8.00
10.00
2.00
$175.00
$350.00
429
Abandon water valve
Changes'
manhole, complete as
from
specified
CO #1 1
Each
1.00
0.00
- 1.00
$4,700.00
($4,700.00)
AUUI I IUNAL VVUKr% Kt4WIMMU: 11 MIVI FF 43U
430 1 Relocate Hydrant on Lump
Marine Dr. (per Extra #1 Sum 1.00 1.00 $3,096.30 $3,096.30
ADDITIONAL WORK: C.O. # 2 (ITEMS 422, 427, 429 & 430) - SUB -TOTAL $4,306.30 ($4,700.00)
NET DECREASE TO: SECTION IV ($53,463.70)
NET INCREASE TO SECTIONS I, II, III, IV $50,536.94
NET DECREASE TO SECTIONS I, II, III, IV ($186,233.86)
NET DECREASE TO CONTRACT: ($135,696.92)
Page 6 of 6