Loading...
HomeMy WebLinkAboutPW CNT 09-05/CNG # 2CHANGE ORDER # 2 DATED: September 11, 2009 TO: Four -Way Construction of WI Inc. P O Box 133 Berlin, WI 54923 Your present contract with the City of Oshkosh, Contract No. and changed as follows: NET DECREASE TO: SECTION I - CONCRETE PAVING NET INCREASE TO: SECTION III - SANITARY SEWER NET DECREASE TO: SECTION IV WATER MAIN NET DECREASE TO CONTRACT: Recommended: Director of Public Works Approved and acce d: c Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. mptroller 09 -05 , is hereby amended ($84,802.47) $2,569.25 ($53,463.70) ($135,696.92) CITY OF OSHKOSH BY: 'e4— L City Manag City Clerk % W" I ' l A, I WE MON Mon CONTRACT: 09 -05 CHANGE ORDER # 2 SECTION I - CONCRETE PAVING ITEM Pavement removal, Square CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES IN DECREASE UNIT CONTRACT CONTRACT 101 Sidewalk and driveway PRICE PRICE 100 Pavement removal, Square complete asspecified Yards 6,300 3,822.13 - 2,477.87 $2.00 ($4,955.74) 101 Sidewalk and driveway removal, complete as Square specified Feet 755 1,300.00 545.00 $0.45 $245.25 102 Standard 30" curb and gutter, complete as Linear specified Feet 120 26.00 -94.00 $23.00 ($2,162.00) 103 31/2" asphaltic concrete driveway, complete as Square specified Feet 755 1,112.00 357.00 $3.30 $1,178.10 104 2 3/4" asphaltic concrete pavement, lower layer, complete asspecified Tons 940 674.75 - 265.25 $75.90 $20,132.48) 105 2 1/4" asphaltic concrete pavement, upper layer, complete asspecified Tons 770 602.47 - 167.53 $54.85 ($9,189.02) 106 Tack or prime coat, complete asspecified Gallon 155 196.08 41.08 $3.00 $123.24 107 Preparation of foundation for asphalt paving on Fernau Avenue, complete Lump asspecified Sum 1 1 $4,000.00 108 Preparation of foundation for asphalt paving on Snell Road, complete as Lump specified Sum 1 1 $3,820.00 109 Preparation of foundation for asphalt paving on USH Lump 45, complete asspecified Sum 1 1 $1,450.00 110 Furnish and install crushed stone base course, complete as specified Tons 4,200 1 111.92 1 - 4,088.08 $8.75 ($35,770.70) 111 Sawing, complete as Linear specified Feet 2,265 2,049.50 - 215.50 $1.10 ($237.05) 112 Adjust manholes and inlets, complete as specified Each 9 9.00 $200.00 113 Clearing and grubbing, Lump complete asspecified Sum 1 1 $1,000.00 114 Topsoil, seed, fertilizer and _ erosion mat, complete as Square specified Yards 15,460 1,060.21 - 14,399.79 $3.25 ($46,799.32) 115 Furnish, install, maintain and remove inlet protection type D, as shown on the plans, complete as specified Each 10 15.00 5.00 $90.00 $450.00 116 Furnish, install, maintain and remove culvert pipe ditch checks, as shown on the plans, complete as specified Each 2 2 $50.00 Page 1 of 6 CONTRACT: 09 -05 CHANGE ORDER # 2 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 117 Furnish, install, maintain Square QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE and remove ditch checks, Yard 560 139.11 139.11 $3.42 $475.76 124 as shown on the plans, Square [ complete asspecified Each 4 8 4.00 $75.001 $300.00 118 Furnish, install, maintain Feet 8 3.30 -4.70 $200.00 $940.00) 302 and remove tracking pads, as shown on the plans, complete as specified Each 4 3 -1.00 $500.00 ($500.00) 119 Furnish, install, maintain Feet 1,860 1,859.00 -1.00 $61.15 ($61.15) 303 and remove silt fence, as shown on the plans, Linear , complete asspecified Feet 4,826.00 - 3,124.00 $1.40 ($4,373.60 120 Furnish, install, maintain Feet 1 1,700 1,669.00 -31.00 $20.40 ($632.40) and remove traffic control, ] Lump com lete ass ecified Sum 1.00 $4,500.00 SECTION I - (BID ITEMS 100 -120) - SUB - TOTALS $2,296.59 ($124,119.91) ADDITIONAL WORK REQUIRED: C.O. #2- SECTION I ITEM Topsoil, seed, fertilize and Square CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT 123 Topsoil, #70 seed, fertilize Square QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 122 Topsoil, seed, fertilize and Square INCREASE IN DECREASE IN ITEM mulch Yard CONTRACT 10,535.72 10,535.72 NET $3.03 $31,923.23 CONTRACT 123 Topsoil, #70 seed, fertilize Square QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE and ematt Yard 560 139.11 139.11 $3.42 $475.76 124 Topsoil, #70 seed, fertilize Square and mulch Yard 1,444.33 1,444.33 $3.20 $4,621.86 ADDITIONAL WORK: C.O. # 2 - (ITEMS 122 - 124) - SUB -TOTAL $37,020.85 $0.00 NET DECREASE TO: SECTION 1 ($84,802.47) SECTION III - SANITARY SEWER 300 Furnish and install 8" INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER complete as specified Linear QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 300 Furnish and install 8" sanitary sewer (PVC Pipe), complete as specified Linear Feet 560 568.00 8.00 $36.30 $290.40 301 Furnish and install 8" sanitary sewer drop, Vertical complete asspecified Feet 8 3.30 -4.70 $200.00 $940.00) 302 Furnish and install 24" sanitary sewer (PVC Pipe), complete as specified Linear Feet 1,860 1,859.00 -1.00 $61.15 ($61.15) 303 Furnish and install 10" sanitary sewer force main (PVC Pipe), complete as Linear , specified Feet 1 1,700 1,669.00 -31.00 $20.40 ($632.40) Page 2 of 6 CONTRACT: 09 -05 CHANGE ORDER # 2 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 304 Furnish and install 12" sanitary sewer force main (PVC Pipe), complete as Linear s ecified Feet 1,700 1 1,667.00 -33.00 $23.00 $759.00) 305 Jack and bore 24" steel casing pipe, complete as Linear specified Feet 1,170 1,170.00 $240.00 306 Furnish and install std. sanitary manhole (4' inside diameter), complete as Vertical specified without casting Feet 84 86.72 2.72 $165.00 $448.80 307 Furnish and install std. sanitary manhole (6' inside diameter), complete as Vertical specified without casting Feet 9 8.78 -0.22 $335.00 ($73.70) 308 Furnish and install 10" - 11.25 degree bends, complete asspecified Each 3 3.00 $320.00 309 Furnish and install 10" - 45 degree bends, complete as specified Each 5 3.00 -2.00 $320.00 ($640.00) 310 Furnish and install 12" - 11.25 degree bends, complete asspecified Each 3 3.00 $380.00 311 Furnish and install connections of new sanitary main to existing main, (various locations and sizes), complete as . specified Each 3 5.00 2.00 $835.00 $1,670.00 312 Abandon sanitary manholes, complete as specified Each 2 2.00 $250.00 313 Abandon sanitary sewer on Fernau Avenue, complete Lump asspecified Sum 1 1.00 $500.00 314 Abandon sanitary sewer on Snell Road, complete as Lump specified Sum 1 1.00 $500.00 315 Abandon sanitary sewer force main on USH 45, Lump , complete asspecified Sum 1 1.00 $800.00 316 Remove existing sanitary sewer manhole, complete asspecified Each 1 2.00 1.00 $400.00 $400.00 SECTION III - (BID ITEMS 300 - 316) - SUB - TOTALS $2,809.20 ($3,106.25) Page 3 of 6 CONTRACT: 09 -05 CHANGE ORDER # 2 ITEM Additional price pre foot to CONTRACT INSTALLED NET NET COST PER INCREASE /N DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT from Pipe through Casing Pipe, Linear 9.00 9.00 $20.00 PRICE PRICE ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION 111 ITEM Additional price pre foot to CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT from Pipe through Casing Pipe, Linear 9.00 9.00 $20.00 PRICE PRICE CHANGES TO ITEMS 317 - 318 FROM CHANGE ORDER #1 317 Additional price pre foot to CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN Changes use 10" C -900 Cert-a -lok UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT from Pipe through Casing Pipe, Linear 9.00 9.00 $20.00 $180.00 PRICE Co #1 complete as specified Foot 400.00 390.00 -10.00 $13.35 ($133.50) 318 Additional price per foot to Feet 75 58.00 -17.00 $32.10 ($545.70) Changes use 12" C -900 Cert-a -lok Each 1.00 1.00 $340.00 $340.00 from Pipe through casing pipes, CO #1 complete as specified Each 400.00 390.00 -10.00 $17.42 1 ($174.20) ADDITIONAL WORK REQUIRED: ITEMS # 321 - 325 321 Furnish & install sanitary CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER sewer marker balls, UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT complete asspecified Each 9.00 9.00 $20.00 $180.00 PRICE 322 Furnish and install Linear 10" 22.5 degree bends, Feet 75 58.00 -17.00 $32.10 ($545.70) 401 , complete asspecified Each 1.00 1.00 $340.00 $340.00 323 Furnish and install 12" 22.5 degree bends, complete asspecified Each 1.00 1.00 $400.00 $400.00 324 Furnish and install tracer Feet 1,755 523.00 - 1,232.00 $31.65 $38,992.80) 402 boxes & posts, complete as .specified ductile iron water main with Each 12.00 12.00 $120.00 $1,440.00 325 Install Storm Sewer around at Manhole # FER102, (per Lump Extra #2 ) Sum 490 1.00 1.00 -3.00 $814.00 $814.00 ($166.50) ADDITIONAL WORK: C. O. # 2 - (ITEMS 317 -318 & 321 -325) - SUB -TOTAL $3,174.00 ($307.70) NET INCREASE TO: SECTION III $2,569.25 SECTION IV - WATER MAIN ITEM Furnish and install 6" CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT poly wrap, complete as PRICE PRICE 400 Furnish and install 6" ductile iron water main with poly wrap, complete as specified (fittings not Linear included ) Feet 75 58.00 -17.00 $32.10 ($545.70) 401 Furnish and install 8" ductile iron water'main with poly wrap, complete as specified (fittings not Linear included ) Feet 1,755 523.00 - 1,232.00 $31.65 $38,992.80) 402 Furnish and install 12" ductile iron water main with poly wrap, complete as specified (fittings not Linear included ) Feet 490 487.00 -3.00 $55.50 ($166.50) 403 Item Deleted Linear Feet 0 0.00 $0.00 Page 4 of 6 CONTRACT: 09 -05 CHANGE ORDER # 2 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE 1N CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 404 Furnish and install 8" x 6" tees, complete as specified Each 4 1.00 -3.00 $285.00 ($855.00) 405 Furnish and install 12" x 6" tees, complete as specified Each 3 3.00 $435.00 406 Furnish and install 8" x 6" reducers, complete as , specified Each 1 1.00 $180.00 407 Furnish and install 8" - 22.5 degree bends, complete as specified Each 4 1.00 -3.00 $220.00 ($660:00) 408 Furnish and install 8" - 45 degree bends, complete as specified Each 14 9.00 -5.00 $220.00 ($1,100.00) 409 Furnish and install 12" plug, complete as specified Each 1 1.00 $91.00 410 Furnish and install 6" valves, complete as , specified Each 6 4.00 -2.00 $810.00 ($1,620.00) 411 Furnish and install 8" valves, complete as specified Each 5 2.00 -3.00 $1,010.00 $3,030.00) 412 Furnish and install 12" valves, complete as . specified Each 2 2.00 $1,950.00 413 Furnish and install 12" x 8" tapping sleeve and valve, complete as specified Each 1 1.00 $2,130.00 414 Furnish and install 16" x 12" tapping sleeve and valve, complete as specified Each 1 1.00 $3,805.00 415 Furnish and install hydrants, complete as specified Each 7 5.00 -2.00 $2,400.00 $4,800.00) 416 Furnish and install gradeloks for hydrant branches, complete as specified Each 7 0.00 -7.00 $290.00 $2,030.00) 417 Furnish and install connections of new water main to existing main, (various locations and sizes), complete as . specified Each 1 2.00 1.00 $930.00 $930.00 418 Abandon water main on Westwind Avenue, Lump complete asspecified Sum 1 1.00 $2,000.00 419 Abandon water main on Snell Road, complete as Lump specified Sum 1 1.00 $2,000.00 420 Furnish and install low permeable plugs, complete asspecified Each 2 0.00 -2.00 $100.00 ($200.00) SECTION IV - (BID ITEMS 400 - 420) - SUB - TOTALS $930.00 ($54,000.00) Page 5 of 6 CONTRACT: 09 -05 CHANGE ORDER # 2 ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION IV ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE INUMBER ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRAC CO #1 as specified Each QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 427 Furnish and install 6" PRICE PRICE ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION IV ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN Changes DESCRIPTION UNIT CONTRACT CONTRACT NUMBER 45 degree bends, complete QUANTITIES QUANTITIES INCREASE DECREASE UNIT CO #1 as specified Each 3.00 4.00 1.00 $860.00 PRICE PRICE CHANnF3 Tin ITFMR A99 A97 A90 FRAM r.14AKIrF IlPnFR AI 422 Changes Furnish and install 16" from 45 degree bends, complete CO #1 as specified Each 3.00 4.00 1.00 $860.00 $860.00 427 Furnish and install 6" Changes 45 degree bends, complete from as specified CO #1 Each 8.00 10.00 2.00 $175.00 $350.00 429 Abandon water valve Changes' manhole, complete as from specified CO #1 1 Each 1.00 0.00 - 1.00 $4,700.00 ($4,700.00) AUUI I IUNAL VVUKr% Kt4WIMMU: 11 MIVI FF 43U 430 1 Relocate Hydrant on Lump Marine Dr. (per Extra #1 Sum 1.00 1.00 $3,096.30 $3,096.30 ADDITIONAL WORK: C.O. # 2 (ITEMS 422, 427, 429 & 430) - SUB -TOTAL $4,306.30 ($4,700.00) NET DECREASE TO: SECTION IV ($53,463.70) NET INCREASE TO SECTIONS I, II, III, IV $50,536.94 NET DECREASE TO SECTIONS I, II, III, IV ($186,233.86) NET DECREASE TO CONTRACT: ($135,696.92) Page 6 of 6