HomeMy WebLinkAbout09-383OCTOBER 13, 2009 09 -383 RESOLUTION
(CARRIED 7 -0 LOST LAID OVER WITHDRAWN )
PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 09 -19
TO FAITH TECHNOLOGIES, INC. FOR LIFT STATIONS AND
FLOW STATIONS SCADA UPGRADE ($1,031,810.00)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
WHEREAS, the City of Oshkosh has heretofore advertised for bids SCADA upgrade
for lift stations and flow stations; and
WHEREAS, upon the opening and tabulation of bids, it appears that the following is
the most advantageous bid:
FAITH TECHNOLOGIES, INC.
2662 American Drive
Appleton, WI 54914
Total Bid: $1,031,810.00
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that the said bid is hereby accepted and the proper City officials are hereby
authorized and directed to enter into an appropriate agreement for the purpose of same, all
according to plans, specifications, and bid on file. Money for this purpose is hereby
appropriated from:
Acct. No. 551-1910-1799-00000 — Sewer Utility Construction Work in Progress
(0 OOfH
ON THE WATER
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Stephan M. Brand, Utilities Superintendent
DATE: October 6, 2009
RE: Wastewater Utility Liftstation Telemetry and Supervisory Control and Data Acquisition
System Upgrades Project Number 09 -19
BACKGROUND
This project includes upgrading the wastewater system liftstation telemetry system technology from a
telephone dial up system to radio communications, related software upgrades and replacement of control
panels at various locations. Strand Associates, Inc. (Strand) is the engineering consultant on this project.
The construction estimate for this project is $1,350.000.00 with the total estimated project cost including
engineering services $1,525,000.00
ANALYSIS
Bids were open on September 22, 2009 with four contractors bidding on the project. The bid included a
base bid and two bid alternates. Bid alternate 1 was for the cost of computer screen graphics
development for the software application and bid alternate 2 was for replacement of one additional control
panel if the bid pricing was favorable. Based on the bid results, I would not take alternate 1 and I would
recommend accepting alternate 2.
The low bid including alternate 2 is Faith Technologies of Appleton WI for a total $1,031,810.00.
Strand Associates, Inc. has reviewed the bid and contractor documentation and based on this information
and their previous experience in working with this contractor, have found them to be responsible.
FISCAL IMPACT
This project is included in the Capital Improvements Program under the Property Improvements Section
(Sewer Utility Fund) and will be funded through the equipment replacement fund. The total bid price
using Faith Technologies bid including alternate 2 is $1,031,810.00. This is $318,190.00 under the
estimated construction costs.
RECOMMENDATIONS
I recommend award to Faith Technologies for the base bid plus alternate 2 in the amount of
$1,031,810.00.
Respectfully Submitted, Approved:
Stephan M. Brand
Utilities Superintendent City Manager
Bids Received: 10:00 AM STRAND ASSOCIATES, INC.
Tuesday, September 22, 2009 910 West Wingra Drive
Madison, Wisconsin 53715
LIFT STATIONS AND FLOW STATIONS SCADA UPGRADE
CONTRACT 09 -19
CITY OF OSHKOSH, WISCONSIN
BID TABULATION SUMMARY
Bidder
Bid Bond
Bid
Bid
and
or
Addenda
Lump Sum
Alternative
Alternative
Address
Guarantee
Acknowledged
Base Bid
No.1
No. 2
Town and Country\
Faith Technologies, Inc.
5%
Yes
$991,145
$176,680
$40,665
2662 American Drive
Appleton, WI 54914
Van Ert Electric Co., Inc.
2000 Progress Way
5%
Yes
$1,415,000
$172,500
$34,500
Kaukauna, WI 54130
Specht Electric Co., Inc.
571 Van Dyne Road
5%
Yes
$1,028,473
$170,000
$34,105
Fond du Lac, WI 54937
Hogen Electric, Inc.
1131 Limerick Lane
5%
Yes
$1,170,000
$177,000
$45,000
Hartford, WI 53027