Loading...
HomeMy WebLinkAbout09-383OCTOBER 13, 2009 09 -383 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 09 -19 TO FAITH TECHNOLOGIES, INC. FOR LIFT STATIONS AND FLOW STATIONS SCADA UPGRADE ($1,031,810.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids SCADA upgrade for lift stations and flow stations; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: FAITH TECHNOLOGIES, INC. 2662 American Drive Appleton, WI 54914 Total Bid: $1,031,810.00 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 551-1910-1799-00000 — Sewer Utility Construction Work in Progress (0 OOfH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Stephan M. Brand, Utilities Superintendent DATE: October 6, 2009 RE: Wastewater Utility Liftstation Telemetry and Supervisory Control and Data Acquisition System Upgrades Project Number 09 -19 BACKGROUND This project includes upgrading the wastewater system liftstation telemetry system technology from a telephone dial up system to radio communications, related software upgrades and replacement of control panels at various locations. Strand Associates, Inc. (Strand) is the engineering consultant on this project. The construction estimate for this project is $1,350.000.00 with the total estimated project cost including engineering services $1,525,000.00 ANALYSIS Bids were open on September 22, 2009 with four contractors bidding on the project. The bid included a base bid and two bid alternates. Bid alternate 1 was for the cost of computer screen graphics development for the software application and bid alternate 2 was for replacement of one additional control panel if the bid pricing was favorable. Based on the bid results, I would not take alternate 1 and I would recommend accepting alternate 2. The low bid including alternate 2 is Faith Technologies of Appleton WI for a total $1,031,810.00. Strand Associates, Inc. has reviewed the bid and contractor documentation and based on this information and their previous experience in working with this contractor, have found them to be responsible. FISCAL IMPACT This project is included in the Capital Improvements Program under the Property Improvements Section (Sewer Utility Fund) and will be funded through the equipment replacement fund. The total bid price using Faith Technologies bid including alternate 2 is $1,031,810.00. This is $318,190.00 under the estimated construction costs. RECOMMENDATIONS I recommend award to Faith Technologies for the base bid plus alternate 2 in the amount of $1,031,810.00. Respectfully Submitted, Approved: Stephan M. Brand Utilities Superintendent City Manager Bids Received: 10:00 AM STRAND ASSOCIATES, INC. Tuesday, September 22, 2009 910 West Wingra Drive Madison, Wisconsin 53715 LIFT STATIONS AND FLOW STATIONS SCADA UPGRADE CONTRACT 09 -19 CITY OF OSHKOSH, WISCONSIN BID TABULATION SUMMARY Bidder Bid Bond Bid Bid and or Addenda Lump Sum Alternative Alternative Address Guarantee Acknowledged Base Bid No.1 No. 2 Town and Country\ Faith Technologies, Inc. 5% Yes $991,145 $176,680 $40,665 2662 American Drive Appleton, WI 54914 Van Ert Electric Co., Inc. 2000 Progress Way 5% Yes $1,415,000 $172,500 $34,500 Kaukauna, WI 54130 Specht Electric Co., Inc. 571 Van Dyne Road 5% Yes $1,028,473 $170,000 $34,105 Fond du Lac, WI 54937 Hogen Electric, Inc. 1131 Limerick Lane 5% Yes $1,170,000 $177,000 $45,000 Hartford, WI 53027 Reviewed by: Mz� AI vX� W M: caI1 R_\ MADtDocuments \SpecificationsWrchive 12009 \Oshkosh, WI \09- 19.1382.044.spz16id Tabs\0shkosh.09- 19.doex