HomeMy WebLinkAbout0138350-Plumbing (storm extension)0
CITY OF OSHKOSH
No 138350
OSHKOSH
PLUMBING PERMIT - APPLICATION
AND RECORD
ON THE WATER
Job Address 2737 HARRISON ST
Owner OSHKOSH CORPORATION
Create Date 09/30/2009
Contractor ZILLGES EXCAVATING
Category 430 - Industrial - Exterior (Laterals)
Plan
Bathtub
Clothes Wshr
Classrm Sink
Surgeons Sink
Roof Drain
Deduct Meters
Shower
Lndry Tray
Exam Sink
Sterilizer
Soda Disp
Wtr Sewer Mtrs
Whirlpool
Sump Pump
F Prep Sink
RPZ Valve
Coffee Maker
Wtr Usage Mtrs
Lavatory
San Sump /Pump
Flr/Wst Sink
Bidet
Site Drain
Misc.
Toilet
Water Softner
Hand Sink
Urinal
Wait. St.
Fixtures
Kit Sink
Standp Rec
Lab Sink
Beer Tap
Ice Chest
Disposal
Gar Drain
Plaster Sink
Dip Well
Comm Ice Maker
Dishwasher
Local Waste
Sculry Sink
Drink Ftn
Int Grease Trap
Floor Drain
Bar Sink
Sery Sink
Wash Ftn
Ext Grease Trap
Hose Bibb
Breakrm Sink
Shamp Sink
Catch Basin
Eye Wash Statn
Water Heater
Use /Nature
of Work
Valuation
Issued By
$7,000.00 Plan Approval $0.00 Permit Fees $50.00 ❑ Permit Voided
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
Date 09/30/2009
easement holde s) nd to secure y n essary approvals before starting such activity. �y
Signature U'-'y ST. Date 3o v J
Address 1800 FOUNTAIN AVE
Agent/Owner
OSHKOSH
WI 54904 -1045 Telephone Number 231 -1994
To schedule inspections please call the Inspection Request line at z3e -b i ZU noting ine Auoress, r -erumL ryurnuer, i ype vi
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.