HomeMy WebLinkAbout0063628-Building (siding) CITY OF OSHKOSH No 0063628
OSH' OSH BUILDING PERMIT APPLICATION AND RECORD
ON THE WATER
Job Address 823 JACKSON ST Owner STEVEN C/MARY J YOUNG Create Date 4/29/98
Designer Contractor OWNER
Category 141 Exterior Remodeling Plan
Type 0 Building 0 Sign O Canopy 0 Fence O Raze
Zoning Class of Const: 8 Size
Unfinished/Basement Sq. Ft. Rooms Height Ft. u Projection
Finished/Living Sq. Ft. Bedrooms Stories Canopies
Garage Sq. Ft. Baths Signs
Foundation Poured Concrete O Floating Slab O Pier Q Other
Concrete Block O Post O Treated Wood
Occupancy Permit Not Required Flood Plain No Height Permit Not Required
Park Dedication Not Required Dwelling Units 0 Structures 0
Use /Nature 81-R/ Install vinyl siding on house and garage.
of Work
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation v.00 Plan •royal $0.00 Permit Fee Paid $15.00 Park Dedication $0.00
Issued By: Date 4/29/98 Final /O.P.
Li Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
Signature l Y 4 akt s).1 Date y q q 7
it/Owner
ner
Address 823 JACKSON ST O KOSH WI 54901 4322 Telephone Number
Building Permit Work Card
Job Address 823 JACKSON ST Permit Number 0063628 Create Date 4/29/98
Owner STEVEN C /MARY J YOUNG Contractor OWNER
Category 141 Exterior Remodeling
Type 0 Building O Sign 0 Canopy O Fence O Raze Plan
Zoning Class of Const: 8 Size Value $1,700.00
Unfinished /Basement Sq. Finished /Living Sq. Ft. Garage Sq. Ft.
Ft.
Rooms Bedrooms Baths Projection
Stories Height Ft. Canopies Signs
Foundation Poured Concrete 0 Floating Slab 0 Pier 0 Other
Concrete Block 0 Post 0 Treated Wood
Occupany Permit Not Require Flood Plain No Height Permit Not Require
Park Dedication Not Require Dwelling Units 0 Structures 0
Use /Nature SFIt/ Install vinyl siding on house and garage.
of Work
HVAC Contr Plumbing Contr
Electric Contr
Inspections:
Date 4/14/99 Type Inspector Brian Noe Approved
Owner came in to ask if he had to renew permit since job is not entirely completed Permit is extended
until 6/30/99 all work must be done by then or a new permit will be required.