HomeMy WebLinkAbout0138119-Building (various alterations)�1
OSHKOSH
ON THE WATER
Job Address 2737 HARRISON ST
Designer
Category 211 -Alteration Industrial
Type 0 Building O Sign O Canopy O Fence O Raze
Zoning Class of Const: Size
CITY OF OSHKOSH No 138119
BUILDING PERMIT -APPLICATION AND RECORD
Owner OSHKOSH CORPORATION Create Date 09/11/2009
Contractor CR MEYER
Plan K1- 2788 -0809
Unfinished/Basement Sq. Ft. Rooms Height Ft. ❑ Projection
Finished /Living Sq. Ft. Bedrooms Stories Canopies
Garage Sq. Ft. Baths Signs
Foundation O Poured Concrete O Floating Slab O Pier Other
O Concrete Block O Post O Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use /Nature
of Work
HVAC Contractor
Electric Contract(
Fees: Valuati
Issued By:
)ry/ Various alterations. Task 3: east side main building -cut door opening in ext. wall. Task 8: SW corner of main building -cut door
ing in ext. wall. Task 9: South side building 2 -prep for 2 new truck docks.
Plumbing Contractor
000.00 Plan Approval $0.00 Permit Fee Paid $241.00 Park Dedication $0.00
Date 09/15/2009 Final /O.P.00 /00 /0000
❑ Permit Voided
Parcel Id # 1519600000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secur neces ry approvals before starting such activity.
I have read and un rstand the of a mentioned inforpeftv.
Signature Date
Address 895 W 20TH AVE
OSHKOSH
WI 54902 - 6766 Telephone Number 235 -3350
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.