Loading...
HomeMy WebLinkAbout0138119-Building (various alterations)�1 OSHKOSH ON THE WATER Job Address 2737 HARRISON ST Designer Category 211 -Alteration Industrial Type 0 Building O Sign O Canopy O Fence O Raze Zoning Class of Const: Size CITY OF OSHKOSH No 138119 BUILDING PERMIT -APPLICATION AND RECORD Owner OSHKOSH CORPORATION Create Date 09/11/2009 Contractor CR MEYER Plan K1- 2788 -0809 Unfinished/Basement Sq. Ft. Rooms Height Ft. ❑ Projection Finished /Living Sq. Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation O Poured Concrete O Floating Slab O Pier Other O Concrete Block O Post O Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use /Nature of Work HVAC Contractor Electric Contract( Fees: Valuati Issued By: )ry/ Various alterations. Task 3: east side main building -cut door opening in ext. wall. Task 8: SW corner of main building -cut door ing in ext. wall. Task 9: South side building 2 -prep for 2 new truck docks. Plumbing Contractor 000.00 Plan Approval $0.00 Permit Fee Paid $241.00 Park Dedication $0.00 Date 09/15/2009 Final /O.P.00 /00 /0000 ❑ Permit Voided Parcel Id # 1519600000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secur neces ry approvals before starting such activity. I have read and un rstand the of a mentioned inforpeftv. Signature Date Address 895 W 20TH AVE OSHKOSH WI 54902 - 6766 Telephone Number 235 -3350 To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.