HomeMy WebLinkAbout0137956-Plumbing (disposal)0
OSHKOSH
ON THE WATER
Job Address 2510 C HAVENWOOD DR
Contractor SAMMONS PLUMBING
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Bathtub
Clothes Wshr
Classrm Sink
Shower
Lndry Tray
Exam Sink
Whirlpool
Sump Pump
F Prep Sink
Lavatory
San Sump /Pump
Flr/Wst Sink
Toilet
Water Softner
Hand Sink
Kit Sink
Standp Rec
Lab Sink
Disposal
1 Gar Drain
Plaster Sink
Dishwasher
Local Waste
Sculry Sink
Floor Drain
Bar Sink
Sery Sink
Hose Bibb
Breakrm Sink
Shamp Sink
Water Heater
Use /Nature
of Work
Owner WARREN D /JOANETTE SCHNEIDER
No 137956
Create Date 09/02/2009
Category 411 - Res - Interior (Replacement Fixtures) Plan
Surgeons Sink
Roof Drain
Deduct Meters
Sterilizer
Soda Disp
Wtr Sewer Mtrs
RPZ Valve
Coffee Maker
Wtr Usage Mtrs
Bidet
Site Drain
Misc.
Urinal
Wait. St.
Fixtures
Beer Tap
Ice Chest
Dip Well
Comm Ice Maker
Drink Ftn
Int Grease Trap
Wash Ftn
Ext Grease Trap
Catch Basin
Eye Wash Statn
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcel Id #
1631001000
Valuation $300.00 Plan Approval $0.00 Permit Fees $25.00 ❑ Permit Voided
Issued By Date 09102/2009
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number (920) 231 -9880
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.