Loading...
HomeMy WebLinkAboutHVAC D3-51-495 (6/12/1995) CITY HALL 215 Church Avenue P. 0. Box 1130 Oshkosh, 54902-1130 City of Oshkosh Of -TKO/H June 12, 1995 St. Marys' Parish M J Zweiger 619 Merritt Avenue 1015 Mount Vernon Street Oshkosh, WI 54901 Oshkosh, WI 54901 Thomas Gunther 732 Evans Street Oshkosh, WI 54901 RE: o w! !0 /9 t7erri Day Care HVAC Alterations File #D3 -51 -495 Dear Sir: Plan Approval for the aforementioned project has been withheld. Plan Approval for the referenced project is withheld pending the receipt of addition information and /or revised plans. If the additional information and /or plans are not received with 2 months the plans will be stamped "Not Approved" and returned. Approval is withheld because of the following violations. ILHR 64.05 The supply of tempered make -up air shall be based on the occupancy derived from using the square foot occupant figures, not on a stated occupant load. ILHR 64.05 This section requires 5 cfm of exhaust air per occupant to be provided along with an equal amount of outside air to be brought in. The plan does not show exhaust air. ILHR 64.05 Interior air movement of 6 air changes per hour shall be provided unless the entire space is air conditioned. Sincerely All ho f f Chief ding Inspector cc: Lee Erdmann /Heating Inspector