HomeMy WebLinkAboutHVAC D3-51-495 (6/12/1995) CITY HALL
215 Church Avenue
P. 0. Box 1130
Oshkosh, 54902-1130 City of Oshkosh
Of -TKO/H
June 12, 1995
St. Marys' Parish M J Zweiger
619 Merritt Avenue 1015 Mount Vernon Street
Oshkosh, WI 54901 Oshkosh, WI 54901
Thomas Gunther
732 Evans Street
Oshkosh, WI 54901
RE: o w! !0 /9 t7erri
Day Care HVAC Alterations
File #D3 -51 -495
Dear Sir:
Plan Approval for the aforementioned project has been withheld. Plan Approval
for the referenced project is withheld pending the receipt of addition
information and /or revised plans. If the additional information and /or plans are
not received with 2 months the plans will be stamped "Not Approved" and returned.
Approval is withheld because of the following violations.
ILHR 64.05 The supply of tempered make -up air shall be based on the occupancy
derived from using the square foot occupant figures, not on a stated occupant
load.
ILHR 64.05 This section requires 5 cfm of exhaust air per occupant to be provided
along with an equal amount of outside air to be brought in. The plan does not
show exhaust air.
ILHR 64.05 Interior air movement of 6 air changes per hour shall be provided
unless the entire space is air conditioned.
Sincerely
All ho f f
Chief ding Inspector
cc: Lee Erdmann /Heating Inspector