Loading...
HomeMy WebLinkAboutHVAC D3-51-495 (6/20/1995) CITY HALL 215 Church Avenue P. 0. Box 1130 Oshkosh, Wisconsin 54902 -1130 City of Oshkosh OJHKQ/H June 20, 1995 St. Mary's Parish Thomas Gunther 619 Merritt Avenue 732 Evans Street Oshkosh, WI 54901 Oshkosh, WI 54901 Re: 149 rflerr; 114 ✓t DayCare HVAC Plans File #D3 -51 -495 Dear Sir: Heating and ventilating plans have been reviewed by this office for compliance with important code requirements. All items that are required to be changed by this letter, must be corrected before commencing that part of the work. This approval is not a Heating Permit. Necessary city permits must be secured before commencing work. You are hereby advised that the owner, as defined in Chapter 101.01(i) of the Wisconsin State Statutes, is responsible for all code requirements not specifically cited herein. Code requirements are set forth in Chapters 50 through 64 of the rules of the Department of Industry, Labor and Human Relations. The building will be inspected during construction and a final inspection will be made after completion to insure complete compliance with city and state codes. The architect, professional engineer, builder or owner shall keep at the building, as evidence of approval, one set of plans bearing the stamp of approval. ILHR 64.05 Provide a shroud around the ceiling fans extending from the suspended ceiling to a level even with the upper most portion of the fan blades to provide direction for the air movement into the occupied rooms. Note: This ceiling area is now being used as an air handling plenum, this may have other code repercussions, such as with the electric code. Sincerely, Allyn Dannhoff Chief Building Inspector cc: Lee Erdmann /Heating Inspector John Sullivan /Electrical Inspector