HomeMy WebLinkAboutHVAC D3-51-495 (6/20/1995) CITY HALL
215 Church Avenue
P. 0. Box 1130
Oshkosh, Wisconsin
54902 -1130 City of Oshkosh
OJHKQ/H
June 20, 1995
St. Mary's Parish Thomas Gunther
619 Merritt Avenue 732 Evans Street
Oshkosh, WI 54901 Oshkosh, WI 54901
Re: 149 rflerr; 114 ✓t
DayCare HVAC Plans
File #D3 -51 -495
Dear Sir:
Heating and ventilating plans have been reviewed by this office for compliance
with important code requirements. All items that are required to be changed by
this letter, must be corrected before commencing that part of the work. This
approval is not a Heating Permit. Necessary city permits must be secured before
commencing work.
You are hereby advised that the owner, as defined in Chapter 101.01(i) of the
Wisconsin State Statutes, is responsible for all code requirements not
specifically cited herein. Code requirements are set forth in Chapters 50
through 64 of the rules of the Department of Industry, Labor and Human Relations.
The building will be inspected during construction and a final inspection will
be made after completion to insure complete compliance with city and state codes.
The architect, professional engineer, builder or owner shall keep at the
building, as evidence of approval, one set of plans bearing the stamp of
approval.
ILHR 64.05 Provide a shroud around the ceiling fans extending from the suspended
ceiling to a level even with the upper most portion of the fan blades to provide
direction for the air movement into the occupied rooms.
Note: This ceiling area is now being used as an air handling plenum, this may
have other code repercussions, such as with the electric code.
Sincerely,
Allyn Dannhoff
Chief Building Inspector
cc: Lee Erdmann /Heating Inspector
John Sullivan /Electrical Inspector