Loading...
HomeMy WebLinkAboutLetter (DNR/boat shelter) - 08/11/1997 State of Wisconsin DEPARTMENT OF NATURAL RESOURCES Tomm G. Thompson, Governor Sturgeon Bay Field Station George E. Meyer, Secretary 110 South Neenah Avenue William R. Selbig, District Director Sturgeon Bay, Wisconsin 54235 r A w TELEPHONE 414-748 -2860 WISCONSIN FAX 414 -748 -2863 DEPT. OF NATURAL RESOURCES RECEWED August 11, 1997 AUG 15 1997 3- NE- 97- 0341UF 0342UF Bernie Gonzales DEPARTMENT O F 2324 White Swan Drive COMMUNITY DEVELOPMENT Oshkosh, WI 54901 Dear Mr. Gonzales: We have reviewed your application for a permit to construct a boat shelter and a boat ramp on Lake Winnebago (Bay Off) in the City of Oshkosh, Winnebago County. You will be pleased to know your application is approved with a few limitations. Attached is a copy of your permit which lists the conditions that must be followed. In addition, I have included a copy of our findings of fact and conclusions of law and your rights to appeal our action. A copy of the permit must be kept for reference at the project site. Please read your permit conditions carefully so that you are fully aware of what is expected of you. Your next step will be to notify me of the date on which you plan to start construction and again after your project is complete. If you have any questions about your permit, please feel to call me at 920 746 -2873. And remember, your permit is not valid until you notify me of your intention to begin construction. Good luck on your project! Sincerely, Tere Duperrault Water Management Specialist Attach. Quality Natural Resources Management Through Excellent Customer Service P`irUd >ydd Paper STATE OF WISCONSIN BOAT SHELTER/BOAT RAMP PERMIT DEPARTMENT OF NATURAL RESOURCES 3- NE- 97- 0341UF 0342UF Bernie Gonzales is hereby granted under Section 30.12(3)(a)5 6, Wisconsin Statutes, a permit to construct a boat ramp and a boat shelter on Lake Winnebago (Bay Off), in the City of Oshkosh, Winnebago County, in the NE'/ of the SW of Section 7, Township 18 North, Range 17 East, subject to the following conditions: PERMIT CONDITIONS 1. You must notify Tere Duperrault, 920 746 -2873 before starting construction and again not more than 5 days after the project is complete. 2. You must complete the project as described on or before August 11, 1999. You may not begin or continue construction after this date unless the Department grants a new permit or permit extension in writing. 3. This permit does not authorize any work other than what you specifically describe in your application and plans, and as modified by the conditions of this permit. If you wish to alter the project or permit conditions, you must first obtain written approval of the Department. 4. You are responsible for obtaining any permit or approval that may be required for your project by local zoning ordinances or by the U.S. Army Corps of Engineers before starting your project. 5. You must allow free and unlimited access to your project site at any time to any Department employee who is investigating the project's construction, operation, or maintenance. 6. The Department may modify or revoke this permit if the project is not completed according to the terms of the permit, or if the Department determines the activity is detrimental to the public interest. 7. You must keep a copy of this permit and approved plans at the project site at all times until the project is complete. 8. Your acceptance of this permit and efforts to begin work on this project signify that you have read, understood and agreed to follow all conditions of this permit. 9. The existing 9.5 feet wide wharf must be reduced to a width of 6 feet or this permit is not valid. 10 This permit becomes null and void and the boat shelter must be removed if a boat house is constructed on the riparian's adjacent property. 11 Erosion prevention/control must be used during and after construction until all disturbed areas are stabilized. 3- NE- 97- 0342UF Page 2 FINDINGS OF FACT (Facts which were considered in making this decision.) 1. Bernie Gonzales has filed an application for a permit to construct a boat shelter, a boat ramp and modify a wharf on Lake Winnebago (Bay Off) in the City of Oshkosh, Winnebago County, in the NE of the SW of Section 7, Township 18 North, Range 17 East. 2324 White swan Drive 2. The project will consist of modifying an existing wharf to a width of 6 feet, constructing a wooden boat ramp, 8 feet wide by 16 feet long attached to the modified wharf. A 14 feet wide by 24 feet long permanent boat shelter attached to a 5 feet wide by 30 feet long wharf on the bed of Lake Winnebago. 3. The Department has completed an investigation of the project site and has evaluated the project as described in the application and plans. The existing wharf which is 9.5 feet wide must be modified to a width of 6 feet in order for this permit to be valid. 4. The proposed project will not materially obstruct navigation and will not be detrimental to other public interests if constructed in accordance with this permit. 5. The proposed project, if constructed in accordance with this permit, will not adversely affect water quality, will not increase water pollution in surface waters and will not cause environmental pollution as defined in Section 144.01(3), Wisconsin Statutes. 6. The project has been reviewed for compliance with Chapter NR 103, Wisconsin Administrative Code. The Department has determined that the proposed project is wetland dependent and that there is not a practicable alternative. The proposed project will not result in significant adverse impacts to the functional values of the affected wetlands, significant adverse impacts to water quality or other significant adverse environmental consequences. 7. The Department has determined that granting or denying this permit does not constitute a major state action significantly affecting the quality of the human environment. 8. The Department of Natural Resources and the applicant have completed all procedural requirements and the project as permitted will comply with all applicable requirements of Sections 1.11, 30.12(3)(a)5 6 Wisconsin Statutes and Chapters NR 102, 103, 115, 117, 150, 299, 326 of the Wisconsin Administrative Code. CONCLUSIONS OF LAW (These are the legal reasons why the Department can make these decisions) 1. The Department has authority under the above indicated Statutes and Administrative Codes, to issue a permit for the construction and maintenance of this project. 2. The proposed project conforms with the standards of Chapters NR 103, 115, 116 and 117, Wisconsin Administrative Code. 3- NE- 97- 0342UF Page 3 NOTICE OF APPEAL RIGHTS If you believe that you have a right to challenge this decision, you should know that Wisconsin Statutes and Wisconsin Administrative Rules establish time periods within which requests to review Department decisions must be filed. To request a contested case hearing pursuant to Section 227.42, Wisconsin Statutes, you have 30 days after the decision is mailed or otherwise served by the Department, to serve a petition for hearing on the Secretary of the Department of Natural Resources. This notice is provided pursuant to Section 227.48(2), Wisconsin Statutes. Dated at Sturgeon Bay, Wisconsin on August 11, 1997 STATE OF WISCONSIN DEPARTMENT OF NATURAL RESOURCES For the Secretary By _P.¢t Te Duperrault Water Management Specialist cc:Wayne Jeidy City Manager, 215 Church, Oshkosh, WI 54901 Tom Radtke, 6408 Hwy 110, Winneconne, WI 54986 Linda VanPay th Ae4P -^41 s. Not*...4A\ 44H%11414, ....111A1 k i ii, in..: 0 Pr A I ti ii, It ill r '4. ot s, i L• •ilf...., 14 ti OIA al a‘• 4 ik 14,. e" *It: ,v. r, dr a