Loading...
HomeMy WebLinkAbout0137467-Building CITY OF OSHKOSH No 137467 OSHKOSH BUILDING PERMIT APPLICATION AND RECORD EVISE ON THE WATER i0 06'] Job Address 1870 STILLMAN DR Owner CORRIM COMPANY LLC Create Date 08/04/20 Designer Contractor FOX CITIES CONST CORP Category 210 Addition Industrial Plan J2- 2753 -0709 Type Building 0 Sign 0 Canopy O Fence O Raze Zoning M3 Class of Const: 2B Size 50x200 Unfinished /Basement Sq. Ft. Rooms Height Ft. Projection Finished /Living 10000 Sq. Ft. Bedrooms Stories 1 Canopies Garage Sq. Ft. Baths Signs Foundation Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required Park Dedication Not Required Dwelling Units 0 Structures 1 Factory/ Use /Nature ry/ 10,000 sf addition. of Work I HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $280,000.00 Plan Approval $0.00 Permit Fee Paid $928.00 Park Dedication $0.00 Issued By: Date 08/06/2009 Final /O.P. 00 /00 /0000 Permit Voided Parcel Id 1225000100 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. I have read and understand the afore mentioned information. Signature Date Agent/Owner Address 4614 RED FOX RD OSHKOSH WI 54904 7784 Telephone Number 235 -8008 To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.