HomeMy WebLinkAbout0137467-Building CITY OF OSHKOSH No 137467
OSHKOSH BUILDING PERMIT APPLICATION AND RECORD EVISE
ON THE WATER i0 06']
Job Address 1870 STILLMAN DR Owner CORRIM COMPANY LLC Create Date 08/04/20
Designer Contractor FOX CITIES CONST CORP
Category 210 Addition Industrial Plan J2- 2753 -0709
Type Building 0 Sign 0 Canopy O Fence O Raze
Zoning M3 Class of Const: 2B Size 50x200
Unfinished /Basement Sq. Ft. Rooms Height Ft. Projection
Finished /Living 10000 Sq. Ft. Bedrooms Stories 1 Canopies
Garage Sq. Ft. Baths Signs
Foundation Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required
Park Dedication Not Required Dwelling Units 0 Structures 1
Factory/
Use /Nature ry/ 10,000 sf addition.
of Work I
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $280,000.00 Plan Approval $0.00 Permit Fee Paid $928.00 Park Dedication $0.00
Issued By: Date 08/06/2009 Final /O.P. 00 /00 /0000
Permit Voided Parcel Id 1225000100
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
I have read and understand the afore mentioned information.
Signature Date
Agent/Owner
Address 4614 RED FOX RD OSHKOSH WI 54904 7784 Telephone Number 235 -8008
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.