Loading...
HomeMy WebLinkAboutPW CNT 09-01/chge order # 1City of Oshkosh Department of Public Works 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903 -1130 (920) 236 -5065 _ OlHKO ON THE WATER July 15, 2009 Mr. John Feaker Feaker & Sons Company, Inc. P.O. Box 5817 De Pere, WI 54115 Re: Change Order #1 /Contract 09 -01 Dear Mr. Feaker: Enclosed please find an executed copy of the Change Order between the City of Oshkosh and Feaker & Sons Company, Inc. regarding the above - mentioned project. If you have any questions, please call our office at (920) 236 -5065. Thank you. Sincerely, David C. Patek Director of Public Works DCP /clm Enclosure cc: Pam Ubrig, City Clerk (w /original) Lynn Lorenson, City Attorney (w /copy) File Copy (w /original) CHANGE ORDER # 1 DATED: June 22, 2009 TO: Feaker & Sons Co., Inc P. O. Box 5817 De Pere, WI 54115 Your present contract with the City of Oshkosh, Contract No and changed as follows: NET INCREASE TO: SECTION I - CONCRETE PAVING NET DECREASE TO: SECTION II - STORM SEWER NET DECREASE TO: SECTION III - SANITARY SEWER NET DECREASE TO: SECTION IV - WATER MAIN NET INCREASE TO CONTRACT: M Recommended: ��C.P Director of Pubic Works 09 -01 , is hereby amended $46,184.93 ($385.00) ($541.32) ($1,879.60) $43,379.01 Approved and acc ted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. mptroller Ap ro ed as to form. City Atfia ey CITY OF OSHKOSH CONTRACT: 09 -01 CHANGE ORDER # 1 SECTION I - CONCRETE PAVING 100. Furnish and install 5" Lump INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COSTPER CONTRACT CONTRACT NUMBER pavement with 9" base, Square QUANTITIES QUANTITIES IN DECREASE UNIT PRICE PRICE 100. Furnish and install 5" Lump INCREASE IN DECREASE IN ITEM Asphaltic concrete UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER pavement with 9" base, Square QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 110 complete asspecified Yards 1,950 3,706.53 1,756.53 $24.70 $43,386.29 101. Furnish and install 2" Lump 111 Asphaltic concrete Sum 1.00 1.00 $175.00 $175.00 pavement with 6" base, Square complete asspecified Yards 2,000 679.20 - 1,320.80 $11.50 ($15,189.20) 102. Furnish and install 8" Non - reinforced concrete pavement, special HES (9 -bag), 6" base material and grading, Square com lete asspecified Yards 495 806.91 311.91 $53.00 $16,531.23 103. Furnish and install pavement ties (epoxy coated), complete as specified Each 110 110.00 $7.14 104. Asphaltic pavement sawing, complete as Linear specified Feet 5,235 4,202.98 - 1,032.02 $0.70 ($722.41) 105. Full depth concrete sawing, complete as specified Linear Feet 930 1,289.44 359.44 $1.75 $629.02 106. Terrace work on E. Irving Avenue, complete as specified Lump Suml 1 1.00 $200.00 107. Terrace restoration on Ontario Street, complete as specified Lump Sum 1 1.00 $1,650.00 108. Terrace restoration on W. 9th Avenue, complete as specified Lump Sum 1 1.00 $3,500.00 SECTION I - (BID ITEMS 100 -108) - SUB - TOTALS $60,546.54 ($15,911.61) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION I ADDITIONAL WORK: C.O. # 1- (ITEMS 109 -111) - SUB -TOTAL $1,550.00 $0.00 NET INCREASE TO: SECTION 1 $46,184.93 SECTION II - STORM SEWER Page 1 Additional Traffic Control Lump INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER Adjust Manholes on QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE ADDITIONAL WORK: C.O. # 1- (ITEMS 109 -111) - SUB -TOTAL $1,550.00 $0.00 NET INCREASE TO: SECTION 1 $46,184.93 SECTION II - STORM SEWER Page 1 Additional Traffic Control Lump 109 on Ontario St. Sum 1.00 1.00 $925.00 $925.00 Adjust Manholes on 110 Murdock @ Wisconsin Each 3.00 3.00 $150.00 $450.00 Install Rings on Manholes Lump 111 @ Main Sum 1.00 1.00 $175.00 $175.00 ADDITIONAL WORK: C.O. # 1- (ITEMS 109 -111) - SUB -TOTAL $1,550.00 $0.00 NET INCREASE TO: SECTION 1 $46,184.93 SECTION II - STORM SEWER Page 1 CONTRACT: 09 -01 CHANGE ORDER # 1 200. Furnish and install 10" Linear INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COSTPER CONTRACT CONTRACT ' NUMBER specified Feet QUANTITIES QUANTITIES !INCREASE DECREASE UNIT PRICE PRICE 200. Furnish and install 10" Linear INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER specified Feet QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 200. Furnish and install 10" Linear INCREASE IN DECREASE IN ITEM storm sewer, complete as Linear CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER specified Feet 10 8.00 INCREASE -2.00 $35.00 PRICE ($70.00) 201. Furnish and install 12" Feet 10.00 10.00 $32.00 $320.00 storm sewer, complete as Linear s ecified Feet 85 62.50 -22.50 $38.00 ($855.00) 202. Furnish and install 14" x 23" storm sewer, complete Linear asspecified Feet 80 78.00 9.27 -2.00 $90.00 $1,344.15 ($180.00) 203. Furnish and install, and maintain Type "D" inlet Vertical protection in 29 locations, Linear 42 41.37 -0.63 $350.00 ($220.50) complete asspecified Feet 29 29.00 $100.00 SECTION II - (BID ITEMS 200 - 203) - SUB - TOTALS $0.00 ($1,105.00) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION II 204 Furnish and install Linear INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER Furnish and install Linear QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 204 Furnish and install Linear INCREASE IN DECREASE IN ITEM 15" Storm Sewer Feet CONTRACT 10.00 10.00 NET $40.00 $400.00 CONTRACT 205 Furnish and install Linear QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 301. 18 " Storm Sewer Feet 10.00 10.00 $32.00 $320.00 ADDITIONAL WORK: C.O. # 1 - (ITEMS 204 - 205) - SUB -TOTAL $720.00 $0.00 NET DECREASE TO: SECTION II ($385.00) SECTION III - SANITARY SEWER 300. Furnish and install 8" INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER complete as speci Feet QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 300. Furnish and install 8" sanitary sewer relay, Linear complete as speci Feet 220 274.53 54.53 $112.60 $6,140.08 301. Furnish and install 10" sanitary sewer relay, Linear complete as specified Feet 1,355 1,332.13 -22.87 $103.80 ($2,373.91) 302. Furnish and install 12" sanitary sewer relay, Linear complete as specified Feet 60 69.27 9.27 $145.00 $1,344.15 303. Furnish and install 12" sanitary sewer drop, Vertical complete as specified Feet 42 41.37 -0.63 $350.00 ($220.50) Page 2 CONTRACT: 09 -01 CHANGE ORDER # 1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET' NET COST PER INCREASE IN CONTRACT DECREASE 1N CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 304. Furnish and install 15" sanitary sewer new, Linear complete as specified Feet 425 426.39 1.39 $107.001 $148.73 305. Furnish and install 15" sanitary sewer relay, Linear complete as specified Feet 1,220 1,210.94 -9.06 $77.85 ($70132) 306. Furnish and install 15" sanitary sewer drop, Vertical complete as specified Feet 3 2.61 -0.39 $670.00 ($261.30) 307. Furnish and install std. sanitary manholes (4' inside diameter) in 21 locations, complete as Vertical specified, without castings Feet 285 283.06 -1.94 $145.00 ($281.30) 308. Furnish and install 10" x 6" factory wyes, complete as specified Each 32 27.00 -5.00 $125.00 ($625.00) 309. Furnish and install 15" x 4" factory wyes, complete as specified Each 2 2.00 $225.00 310. Furnish and install 15" x 6" factory wyes, complete as specified Each 27 32.00 5.00 $245.00 $1,225.00 311. Furnish and install 4" sanitary sewer lateral new, Linear complete as specified Feet 55 54.50 -0.50 $45.00 ($22.50) 312. Furnish and install 4'76" sanitary sewer lateral relay, Linear complete as specified Feet 1,150 1,037.25 - 112.75 $60.00 ($6,765.00) 313. Furnish and install sanitary sewer marker balls, complete as specified Each 122 98.00 -24.00 $20.00 ($480.00) 314. Furnish and install connections of new sanitary main to existing main, (various sizes and locations), complete as specified Each 12 12.00 1 $250.00 315. Core into existing sanitary manhole, complete as specified Each 1 2.00 1.00 $250.00 $250.00 316. Furnish and install concrete collar, complete as specified Each 1 4.00 3.00 $250.00 $750.00 317. Furnish and install 15" sanitary sewer plug, complete as specified Each 1 1.00 $130.00 318. Abandon sanitary sewer on E. Irving Avenue, complete as specified Lump Sum 1 1.00 $300.00 319. Abandon sanitary sewer on Ontario Street, complete as specified Lump Sumi 1 1.00 $300.00 Page 3 CONTRACT: 09 -01 CHANGE ORDER # 1 SECTION 111 - (BID ITEMS 300 - 320) - SUB - TOTALS $9,857.96 ($11,734.83) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION III Furnish and install INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER Furnish and install QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 320. Abandon sanitary sewer on Linear W. Murdock Avenue, Feet 25 12.00 12.00 -10.00 $103.80 $1,245.60 $400.00) 401. complete as specified Lump Surni 1.00 $300.00 SECTION 111 - (BID ITEMS 300 - 320) - SUB - TOTALS $9,857.96 ($11,734.83) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION III 321 Furnish and install INCREASE IN DECREASE 1N ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER Furnish and install QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 321 Furnish and install INCREASE IN DECREASE 1N ITEM 10" X 8" WYE Each CONTRACT 1.00 1.00 NET $89.95 $89.95 CONTRACT 322 Furnish and install QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 10" Sanitary Sewer Lateral Linear Relav Feet 25 12.00 12.00 -10.00 $103.80 $1,245.60 $400.00) ADDITIONAL WORK: C. O. # 1 - (ITEMS 321 - 322) - SUB -TOTAL $1,335.55 $0.00 NET DECREASE TO: SECTION III ($541.32) SECTION IV - WATER MAIN 400. Furnish and install 6" INCREASE IN DECREASE 1N ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER w /poly wrap, complete as QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 400. Furnish and install 6" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included ) Feet 25 15.00 -10.00 $40.00 $400.00) 401. Furnish and install 12" ductile iron water main w /poly wrap, complete as specified (fittings not Linear included ) Feet 415 407.00 -8.00 $54.20 ($433.60) 402. Furnish and install 1" water service new, complete as specified, not including corporation and stop box Linear Feet 60 53.00 -7.00 $28.00 ($196.00) 403. Furnish and install 1" corporation and stop box with rod, complete as specified Each 1 1.00 $190.00 404. Furnish and install connections of new water main to existing water main, complete as , specified Each 1 1.00 $250.00 405. Furnish and install 6" valves, complete as ::E specified ach 2 2.00 $855.00 Page 4 CONTRACT: 09 -01 CHANGE ORDER # 1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 406. Furnish and install 12" valve, complete as specified Each 1 1.00 $1,860.00 407. Furnish and install 12" x 6" tapping valve and sleeve, complete as specified Each 1 1.00 $2,800.00 408. Furnish and install 12" x 12" x 6" tee, complete as specified Each 1 1.00 $390.00 409. Furnish and install 12" cap, complete as specified Each 1 1.00 $210.00 410. Furnish and install hydrants, complete as specified Each 2 2.00 $2,265.00 411. Furnish and install gradeloks, complete as specified Each 2 0.00 -2.00 $425.00 ($850.00) 412. Remove existing hydrant, . complete asspecified Each 1 1.00 $500.00 413. Remove existing 8" x 6" reducer, complete as specified Each 1 1.00 $500.00 414. Furnish and install 12" x 12" x 6" tee, complete as , specified Each 1 1.00 $500.00 SECTION IV - (BID ITEMS 400 - 414) - SUB - TOTALS NET DECREASE TO: SECTION IV $0.00 ($1,879.60) ($1,879.60) NET INCREASE TO SECTIONS I, il, III, IV NET DECREASE TO SECTIONS I, II, III, IV NET INCREASE TO CONTRACT: $74,010.05 ($30,631.04) $43,379.01 Page 5