HomeMy WebLinkAboutPlumbing 01-69-980P 1:
O.IHK01H City of Oshkosh
ON THE WATER
sr :ornerier r Hanson 1 umn i no
2255 Wnnoate Ave.
reen day jail
Ref: Pi3.â–ºmninn plan Approval frill Limmeron Ct.
ip 111- 69- 9111.1P
Gentlemen:
Examination of the plumbing plans ano specifications for the
annvementioneo project has been completed.
in accord with Chapter 145, Wisconsin Statute and 11..Hk 81 through
85 Wisconsin Hdmini.strative Lode the plumbing plans ano specifications
are approved contingent upon compliance with the stipulation noted
be tow:
1. The distance downstream from the base of a 2" or larger waste
stack is 10 ID of the building drain. ILHR 82.31
2. Clean out access to horizontal building drain required. ILHR
82.35
3. See limitation on use of local waste. ILHR 82.33
In the event installation of this plumping system has not commenced
within two years from this date this approval shall become void. H
new application accompanied by full examination fee shall he filed and
an updated approval recieved before work may commence.
In granting this approval the City of Oshkosh or its representitive
does not hold itself liable for any defects in plans or specification
plan omissions examination oversight construction or any damage that
may result in or after installation and reserves .the right to order
changes or additions should conditions arise making this necessary.
it shall be necessary for the installing plumper to obtain a plumbing
permit from the City of Oshkosh before proceeding with actual
installation of this plumbing system or any of its parts.
Sincer1y,
Richard Wood Plumbing Supervisor