HomeMy WebLinkAboutPlumbing 01-69-980P (j)
OIHKOJH City of Oshkosh
ON THE WATER
September 26, 1.991.1
Schroeder Hanson P l u m b i n g
2253 Wnndale Ave.
Green Hay WI 54S03
Ref: Plumbing plan approval 1/0 Cimmeron Lt.
I1 '1- 69- 91iI1P
Gentlemen:
Examination of the plumbing plans and sper.if1cations •for the
abovementioned prnject has been completed.
In accord with Chapter :145, Wisconsin Statute, and IL.HR 81 through
85, Wisconsin Administrative Code, the plumbing plans and specifications
are approved contingent upon cnmpliance with the stipulation noted
below:
1. The distance downstream from the base of a 2" or larger waste
stack is 1U ID of the building drain. ILHR 82.31
2. Clean nut access to horizontal building drain required. ILHR
82.35
3. See Limitation on use of Inr.aL waste. ILHR 82.33
In the event installation of this plumbing system has not commenced
within two years from this date, this approval shall become void. A
new application acr.ompani.ed by full examination fee shall be filed and
an updated approval•recieved before work may commence.
In granting this approval, the City of Oshkosh or its representitive
does not held itself liable For any defects in plans or specifir.ation,
plan omissions, examination oversight, construction or any damage that
may result to or after installation and reserves the right to order
changes or additions should conditions arise making this necessary.
It shall be necessary "for the installing plumper to obtain a plumbing
permzt from the City of Oshkosh before proceeding with actual
installation of this plumbing system or any of its parts.
Sinceriy,
Richard Wood, Plumbing Supervisor