Loading...
HomeMy WebLinkAboutPlumbing D1-46-989P Oot. 4, 1989 Planks Plumbing Inc. 122 Ridgeway Dr. Appleton, WI 54915 REsPlumbing `Plan Approval for 111 -113 -115 -117 Cimmaron Ct. #D1- 46 -989P Gentlemen: Examination of the plumbing plans and specifications for the above mentioned project has been completed. In accord with Chapter 145, Wisconsin Statute, and ILHR 81 through 85, Wisconsin Administrative Code, the plumbing plans and specifications are approved contingent upon compliance with the stipulation noted below: 1. Seperation from -base of offset in etaok for horizontal branoh drains is 10xID. ILHR 82.30 The architect, professional engineer, registered designer, owner or plumbing oontraotor shall keep, at the construction site, one set of plans bearing the stamp of approval. In the event installation of this plumbing system has not commenced within two years from thia date, this approval shall beoome void. A new application accompanied by full examination II fee shall be filed and an updated approval received before work may commence. In granting this approval, the City of Oshkosh, or its representative does not hold itself liable for any defects in plans or apeoifioation, plan omissions, examination oversight, construction or any damage that may result in or after installation and reserves the right to order changes or additions should conditions arias making this neoesaary. It shall be necessary for installing plumber to obtain a plumbing permit from the City of Oshkosh before proceeding with actual installation of this plumbing system or any of its parts. Sincerely, RICHARD WOOD Plumbing Inspector RW :mr