HomeMy WebLinkAboutPlumbing D3-44-989P Sept. 15, 19A9
Plasski Plumbing► Tnc.
94 Ridgeway Dr.
Appleton, TAT 54915
Art Pl umbing Plan an Approval for 101 -103- 105 -107 Cimarron Place
4n3- 44 -909P
cent l omen t
Pxaa~ination of the plumbing -plans and specifications for the
above mentioned protect has been completed.
*n accord-with-Chapter 145, Wisconsin Statute, and TLRR P1 through
AS,• wiseconain Administrative Code, the plumbing plans and
specification'', are approved contingent upon compliance with the
atipulation noted below:
1. Puildina sewer must be served by full sine cleanout.
7. t'4-rcnit vented branch drain must be full size from stack
connection to vent connection.
vbe architect,- professional engineer, registered designer owner
or plumbing contractor shall keep, at the construction site, one
set of plans bearing the stamp of approval.
Tn the event installation of this plumbing system has not
commenced within two years from this date, this approval shall
become void. A new application accompanied by full examination
fee shall be filed and an updated approval received before work
Bray commence.
Ta granting this approval, the City of Oshkosh, or its
representative does not bold itself liable for any defects in
plane or specification, plan omiaeions, examination oversight,
con-struction, or any damage that may result in or after
installation and reserves the right to order changes or additions
should eonditiona arise making this necessary.
It shall necessary for installing plumber to obtain a plumbing
perm-it from the City of Oshkosh before proceeding with actual
installation of this plumbing system or any of its parts.
Sincerely,
PTCPARD WOOD)
Plumbing Inspector