Loading...
HomeMy WebLinkAboutPlumbing D3-44-989P Sept. 15, 19A9 Plasski Plumbing► Tnc. 94 Ridgeway Dr. Appleton, TAT 54915 Art Pl umbing Plan an Approval for 101 -103- 105 -107 Cimarron Place 4n3- 44 -909P cent l omen t Pxaa~ination of the plumbing -plans and specifications for the above mentioned protect has been completed. *n accord-with-Chapter 145, Wisconsin Statute, and TLRR P1 through AS,• wiseconain Administrative Code, the plumbing plans and specification'', are approved contingent upon compliance with the atipulation noted below: 1. Puildina sewer must be served by full sine cleanout. 7. t'4-rcnit vented branch drain must be full size from stack connection to vent connection. vbe architect,- professional engineer, registered designer owner or plumbing contractor shall keep, at the construction site, one set of plans bearing the stamp of approval. Tn the event installation of this plumbing system has not commenced within two years from this date, this approval shall become void. A new application accompanied by full examination fee shall be filed and an updated approval received before work Bray commence. Ta granting this approval, the City of Oshkosh, or its representative does not bold itself liable for any defects in plane or specification, plan omiaeions, examination oversight, con-struction, or any damage that may result in or after installation and reserves the right to order changes or additions should eonditiona arise making this necessary. It shall necessary for installing plumber to obtain a plumbing perm-it from the City of Oshkosh before proceeding with actual installation of this plumbing system or any of its parts. Sincerely, PTCPARD WOOD) Plumbing Inspector