Loading...
HomeMy WebLinkAboutstate/municipal 1/8/09 us 41DATE: January 8, 2009 STATE. / MUNICIPAL AGREEMENT LD.: 1120 -11 -74 FOR HIGHWAY: US 41 LENGTH: 1.141 HIGHWAY IMPROVEMENT PROJECT. LIMITS: STH 21- US 45 COUNTY: Winnebago The signatory, City of Oshkosh, hereinafter called the Municipality, through its undersigned duly uthor the o fficers or officials, hereby requests the State of Wisconsin Department of Transportation, State, to initiate and effect the highway or street improvement hereinafter described. The authority for the Municipality to enter into this agreement with the State is provided by Section 86.25(1), (2), and (3) of the Statutes. NEEDS AND ESTIMATE SUMMARY: Existing Facility (describe and .give reason for request): US 41 will be reconstructed future needs of the travelling publi 26 - Breezewood Lane. US 41 has reached its capacity and upgrading capacity with improving safety. Proposed Improvement (nature of work): With this US 41 project, Boulevard Butte h s work l is being done to l accommodate t the furture bridge over US 41 south of US 45 and will connect into Algoma 41/45 Interchange. Describe non- participating work included in the project contract: Sealing concrete joint pavement joints on Lake Butte des Morts Drive. Describe other work necessary to finish the project completely which will be undertaken independently by the Municipality: rsanit or water main relocation for Project 1120 -11 -74 will undertaken b City of Oshkosh. PHASE ESTIMATED COST Total Federal/ Municipal Estimated Cost Funds % Funds Construction (Participating): Project 1120 -11 -74 Category 0010 — Roadway Items $14,000,000 $14 000 000 100% $0 $0 0% 0% Category 0020 - B -70 -271 $560,000 $560,000 $1,900,000 100% 100% $0 0% Category 0030 -B -70 -272 $1,900,000 $490,000 $490,000 100% $0 0% Category 0040 - B -70 -275 Category 0050 -B -70 -277 $190,000 $190,000 100% $0 $0 0% 0% Category 0060 - R -70 -20 $520,000 $520,000 $383,000 100% 100% $0 0% Category 0070 - R -70 -21 383,000 0 SUBTOTAL: $18,043,000 $18,043,000 $0 0 $16,000 100% Construction (Non - Participating): $16,000 Category 0080 — City of Oshkosh Concrete Joint Sealer $6000 $0 0 $6000 100% Construction (Non- participating): Category 0090 — Sunset Point Sanitary District Adjusting Manholes $18,065,000 $18,043,000 $16,000 OOST DISTRIBUTION: TTAL C This request is subject to the terms and conditions that follow and is made by the undersigned under proper authority to make such a request for the designated Municipality and upon acceptance by the State shall constitute agreement between the Municipality and the State. Signed for and in behalf of City of Oshkosh Signed for and in behalf of the City of Oshkosh Peggy teen ���� c e I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. OAII Mark ohloff, City Manager