HomeMy WebLinkAbout09-255JULY 14, 2009 09 -255 RESOLUTION
(CARRIED 7 -0 LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 FOR PUBLIC WORKS
CONTRACT NO. 09 -01 WITH FEAKER & SONS COMPANY INC.,
FOR VARIOUS UTILITY CONSTRUCTION ( +$43,379.01)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
FEAKER & SONS CO., INC.
PO Box 5817
DePere, WI 54115
Net Increase to contract: $43,379.01
PURPOSE: See attached Change Order.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Acct.
No.
317 - 0410 - 7480 -03302
- Special Assessments Fund - Sewer
Acct.
No.
314 - 0410 - 7480 -03303
- Special Assessments Fund - Water
Acct.
No.
541 - 1841 - 1799 -00000
- Water Utility Construction Work in Progress
Acct.
No.
551 - 1910 - 1799 -00000
- Sewer Utility Construction Work in Progress
( 0
OfHKOIH
ON THE WATER
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Steven M. Gohde, Assistant Director of Public Works
DATE: July 9, 2009
RE: Change Order #1 for Public Works Contract No. 09 -01;
Sanitary Sewer Relay and Extension Work and Water Main Extension Work
BACKGROUND
Change Order #1 for Contract 09 -01 is scheduled for consideration by the Common Council at the July
14, 2009 meeting. The contract was originally awarded to Feaker & Sons Co. Inc. in February of 2009.
This change order is for various changes to paving, storm sewer, sanitary sewer and water main items
and finalizes the contract to the actual quantities installed. The changes are a result of additional work
needed or not needed to complete the project due to existing conditions underground.
ANALYSIS
Following is a summary of the significant additional work items performed for each section of the CIP.
- Paving included additional width and areas needed to construct utilities.
-Storm Sewer included additional pipe, manhole adjustment and pavement removal to replace
failing items.
- Sanitary Sewer included additional fittings and lateral length to reconnect existing laterals and
adjustment to actual quantities used.
-Water Main included reductions to actual quantities used.
FISCAL IMPACT
The increased amount for the contract Paving section is $46,184.93 ($17,156.23 to Storm and
$29,653.70 to Sanitary). The following contract sections were reduced by the amounts show: Storm
Sewer $385.00, Sanitary Sewer $541.32 and Water Main $1,879.60. The CIP budgeted amount is
$721,000. The new contract total is $667,467.41. Adequate funds are available in the 2009 Capital
Improvement Budget in the utility sections.
RECOMMENDATIONS
I recommend approval of the Change Order #1 to Contact No. 09 -01 in the amount of $43,379.01 to
Feaker and Sons Co. Inc.
Respectfully Submitted,
Approved:
Steven M. Gohde
Asst. Director of Public Works City Manager
I: \Engineering \09 -01 Sanitary Sewer\ Project_ Information \Correspondence\Memo \CO #1 exp.doc
CHANGE ORDER # 1
DATED: June 22, 2009
TO: Feaker & Sons Co., Inc
P. O. Box 5817
De Pere, WI 54115
Your present contract with the City of Oshkosh, Contract No.
and changed as follows:
NET INCREASE TO: SECTION I - CONCRETE PAVING
NET DECREASE TO: SECTION II - STORM SEWER
NET DECREASE TO: SECTION III - SANITARY SEWER
NET DECREASE TO: SECTION IV - WATER MAIN
NET INCREASE TO CONTRACT:
Recommended:
Director of Public Works
W
09 -01 , is hereby amended
$46,184.93
($385.00)
($541.32)
($1,879.60)
$43,379.81
CITY OF OSHKOSH
City Manager
City Clerk
Approved and acce ted:
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
Comptroller
Approved as to form:
City Attorney
CONTRACT: 09 -01 CHANGE ORDER # 1
SECTION 1- CONCRETE PAVING
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COSTPER
INCREASE IN
DECREASE IN
NUMBER
Asphaltic concrete
Sum
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
pavement with 9" base,
Square
PRICE
PRICE
100.
Furnish and install 5"
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE 1N
NUMBER
Asphaltic concrete
Sum
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
pavement with 9" base,
Square
PRICE
PRICE
110
complete asspecified
Yards
1,950
3,706.53
1,756.53
$24.70
$43,386.29
101.
Furnish and install 2"
Lump
111
Asphaltic concrete
Sum
1.00
1.00
$175.00
$175.00
pavement with 6" base,
Square
complete asspecified
Yards
2,000
679.20
- 1,320.80
$11.50
($15,189.20)
102.
Furnish and install 8" Non -
reinforced concrete
pavement, special
HES (9 -bag), 6" base
material and grading,
Square
complete ass ecified
Yards
495
806.91
311.91
$53.00
$16,531.23
103.
Furnish and install
pavement ties (epoxy
coated), complete as
specified
Each
110
110.00
$7.14
104.
Asphaltic pavement
sawing, complete as
Linear
specified
Feet
5,235
4,202.98
- 1,032.02
$0.70
($722.41)
105.
Full depth concrete sawing,
complete as specified
Linear
Feet
930
1,289.44
359.44
$1.75
$629.02
106.
Terrace work on E. Irving
Avenue, complete as
specified
Lump Suml
1
1.00
$200.00
107.
Terrace restoration on
Ontario Street, complete as
specified
Lump Sum
1
1.00
$1,650.00
108.
Terrace restoration on W.
9th Avenue, complete as
specified
Lump Sum
1
1.00
$3,500.00
SECTION I - (BID ITEMS 100 -108) - SUB - TOTALS
ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION I
$60,546.54 ($15,911.61)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE 1N
NUMBER
on Ontario St.
Sum
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
Adjust Manholes on
PRICE
PRICE
ADDITIONAL WORK: C.O. # 1- (ITEMS 109 - 111) - SUB -TOTAL $1,550.00
NET INCREASE TO: SECTION I
SECTION II - STORM SEWER
$46,184.93
$0.00
Page 1
Additional Traffic Control
Lump
109
on Ontario St.
Sum
1.00
1.00
$925.00
$925.00
Adjust Manholes on
110
Murdock @ Wisconsin
Each
3.00
3.00
$150.00
$450.00
Install Rings on Manholes
Lump
111
@ Main
Sum
1.00
1.00
$175.00
$175.00
ADDITIONAL WORK: C.O. # 1- (ITEMS 109 - 111) - SUB -TOTAL $1,550.00
NET INCREASE TO: SECTION I
SECTION II - STORM SEWER
$46,184.93
$0.00
Page 1
CONTRACT: 09 -01 CHANGE ORDER # 1
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE !N
DECREASE IN
NUMBER
storm sewer, complete as
Linear
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
205
specified
Feet
10
8.00
54.53
-2.00
$35.00
PRICE
PRICE
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
storm sewer, complete as
Linear
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
205
specified
Feet
10
8.00
54.53
-2.00
$35.00
PRICE
PRICE
200.
Furnish and install 10"
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE 1N
DECREASE IN
NUMBER
storm sewer, complete as
Linear
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
205
specified
Feet
10
8.00
54.53
-2.00
$35.00
PRICE
($70.00)
201.
Furnish and install 12"
Feet
10.00
10.00
$32.00
$320.00
storm sewer, complete as
Linear
specified
Feet
85
62.50
-22.50
$38.00
$855.00)
202.
Furnish and install 14" x
23" storm sewer, complete
Linear
asspecified
Feet
80
78.00
9.27
-2.00
$90.00
$1,344.15
($180.00)
203.
Furnish and install, and
maintain Type "D" inlet
Vertical
protection in 29 locations,
Linear
42
41.37
-0.63
$350.00
($220.50)
complete asspecified
Feet
29
29.00
1
$100.00
SECTION II - (BID ITEMS 200 - 203) - SUB - TOTALS
ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION II
$0.00 ($1,105.00)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE 1N
DECREASE IN
NUMBER
15" Storm Sewer
Feet
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
205
Furnish.and install
Linear
220
274.53
54.53
$112.60
PRICE
PRICE
204
Furnish and install
Linear
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
15" Storm Sewer
Feet
QUANTITIES
10.00
10.00
DECREASE
$40.00
$400.00
CONTRACT
205
Furnish.and install
Linear
220
274.53
54.53
$112.60
PRICE
PRICE
301.
18 " Storm Sewer
Feet
10.00
10.00
$32.00
$320.00
ADDITIONAL WORK: C.O. # 1 - (ITEMS 204 - 205) - SUB -TOTAL
NET DECREASE TO: SECTION II
SECTION III - SANITARY SEWER
$720.00 $0.00
($385.00)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
sanitary sewer relay,
Linear
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
complete as specified
Feet
220
274.53
54.53
$112.60
PRICE
PRICE
300.
Furnish and install 8"
sanitary sewer relay,
Linear
complete as specified
Feet
220
274.53
54.53
$112.60
$6,140.08
301.
Furnish and install 10"
sanitary sewer relay,
Linear
complete as specified
Feet
1,355
1,332.13
-22.87
$103.80
$2,373.91)
302.
Furnish and install 12"
sanitary sewer relay,
Linear
complete as specified
Feet
60
69.27
9.27
$145.00
$1,344.15
303.
Furnish and install 12"
sanitary sewer drop,
Vertical
complete as specified
Feet
42
41.37
-0.63
$350.00
($220.50)
Page 2
CONTRACT: 09 -01 CHANGE ORDER # 1
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
QUANTITIES
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
COST PER
UNIT
INCREASE IN
CONTRACT
PRICE
DECREASE IN
CONTRACT
PRICE
304.
Furnish and install 15"
sanitary sewer new,
Linear
complete as specified
Feet
1 425
426.39
1.39
$107.00
$148.73
305.
Furnish and install 15"
sanitary sewer relay,
Linear
complete as specified
Feet
1,220
1,210.94
-9.06
$77.85
($705.32)
306.
Furnish and install 15"
sanitary sewer drop,
Vertical
complete as specified
Feet
3
2.61
-0.39
$670.00
$261.30)
307.
Furnish and install std.
sanitary manholes (4'
inside diameter) in 21
locations, complete as
Vertical
specified, without castings
Feet
285
283.06
-1.94
$145.00
($281.30)
308.
Furnish and install 10" x 6"
factory wyes, complete as
309.
specified
Furnish and install 15" x 4"
Each
32
27.00
-5.00
$125.00
($625.00)
factory wyes, complete as
specified
Each
2
2.00
$225.00
310.
Furnish and install 15" x 6"
factory wyes, complete as
specified
Each
27
32.00
5.00
$245.00
$1,225.00
311.
Furnish and install 4"
sanitary sewer lateral new,
Linear
complete as specified
Feet
55
54.50
-0.50
$45.00
($22.50
312.
Furnish and install 4 " 16"
sanitary sewer lateral relay,
Linear
complete as specified
Feet
1,150
1,037.25
- 112.75
$60.00
($6,765.00)
313.
-
Furnish and install sanitary
sewer marker balls,
complete as specified
Each
122
98.00
-24.00
$20.00
314.
Furnish and install
connections of new
sanitary main to existing
main, (various sizes and
locations), complete as
specified
Each
12
12.00
$250.00
315.
Core into existing sanitary
manhole, complete as
specified
Each
1
2.00
1.00
$250.00
$250.00
316.
Furnish and install concrete
collar, complete as
specified
Each
1
4.00
3.00
$250.00
$750.00
317.
Furnish and install 15"
sanitary sewer plug,
complete as specified
Each
1
1.00
$130.00
318.
Abandon sanitary sewer on
E. Irving Avenue, complete
as specified I Lump
Sum
1
1.00
$300.00
319.
Abandon sanitary sewer on
Ontario Street, complete as
specified
Lump
Sum
1 1
1.00
$300.00
Page 3
CONTRACT: 09 -01 CHANGE ORDER # 1
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
INCREASE IN
400.
Furnish and install 6"
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
ductile iron water main
PRICE
320.
Abandon sanitary sewer on
321
Furnish and install
w /poly wrap, complete as
W. Murdock Avenue,
10" X 8" WYE
Each
1.00
1.00
$89.95
$89.95
complete as specified
Lump Suml
1
1.00
401.
included )
Furnish and install 12"
Feet
25
15.00
-10.00
$40.00
10" Sanitary Sewer Lateral
Linear
$300.00
DECREASEIN
CONTRACT
PRICE
SECTION III - (BID ITEMS 300 - 320 ) - SUB - TOTALS $9,857.96 ($11,734.83)
ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION 111
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
400.
Furnish and install 6"
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
ductile iron water main
PRICE
PRICE
321
Furnish and install
w /poly wrap, complete as
10" X 8" WYE
Each
1.00
1.00
$89.95
$89.95
322
Furnish and install
401.
included )
Furnish and install 12"
Feet
25
15.00
-10.00
$40.00
10" Sanitary Sewer Lateral
Linear
ductile iron water main
Relay
Feet
12.00
12.00
$103.80
$1,245.60
ADDITIONAL WORK: C. O. # 1 - (ITEMS 321 - 322) -
SUB -TOTAL
$1,335.55
$0.00
NET DECREASE TO:
SECTION 111
($541.32)
included )
Furnish and install 1" water
SECTION IV - WATER MAIN
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
QUANTITIES
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
COST PER
UNIT
INCREASE IN
CONTRACT
PRICE
DECREASE IN
CONTRACT
PRICE
400.
Furnish and install 6"
ductile iron water main
w /poly wrap, complete as
specified (fittings not
Linear
401.
included )
Furnish and install 12"
Feet
25
15.00
-10.00
$40.00
($400.00)
ductile iron water main
w /poly wrap, complete as
specified (fittings not
Linear
402.
included )
Furnish and install 1" water
Feet
415
407.00
-8.00
$54.20
$433.60)
service new, complete as
specified, not including
corporation and stop box
Linear
403.
Furnish and install 1"
Feet
60
53.00
-7.00
$28.00
($196.00)
corporation and stop box
with rod, complete as
specified
Each
1
1.00
$190.00
404.
Furnish and install
connections of new water
main to existing water
main, complete as
s ecified
Each
1
1.00
$250.00
405.
Furnish and install 6"
valves, complete as
specified
Each
2
2.00
$855.00
Page 4
CONTRACT: 09 -01 CHANGE ORDER # 1
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
406.
Furnish and install 12"
valve, complete as
specified
Each
1
1.00
$1,860.00
407.
Furnish and install 12" x 6"
tapping valve and sleeve,
complete as specified
Each
1
1.00
$2,800.00
408.
Furnish and install 12" x
12" x 6" tee, complete as
specified
Each
1
1.00
$390.00
409.
Furnish and install 12" cap,
complete as specified
Each
1
1.00
$210.00
410.
Furnish and install
hydrants, complete as
specified
Each
2
2.00
$2,265.00
411.
Furnish and install
gradeloks, complete as
s ecified
Each
2
0.00
-2.00
$425.00
($850.00)
412.
Remove existing hydrant,
. Complete asspecified
Each
1
1.00
$500.00
413.
Remove existing 8" x 6"
reducer, complete as
specified
Each
1
1.00
$500.00
414.
Furnish and install 12" x
12" x 6" tee, complete as
s ecified
Each
1
1.00
$500.00
SECTION IV - (BID ITEMS 400 - 414) - SUB - TOTALS
NET DECREASE TO: SECTION IV
$0.00 ($1,879.60)
($1,879.60)
NET INCREASE TO SECTIONS I, II, 111, IV $74,010.05
NET DECREASE TO SECTIONS 1, 11, 111, IV ($30,631.04)
NET INCREASE TO CONTRACT: $43,379.01
Page 5