HomeMy WebLinkAboutPW CNT 09-05 CNG# 1 FOUR-WAYCHANGE ORDER # 1 DATED: May 5, 2009 TO: Four -Way Construction of WI, Inc. P. O. Box 133 Berlin, WI 54923 Your present contract with the City of Oshkosh, Contract No. 09 -05 , is hereby amended and changed as follows: NET INCREASE TO: SECTION I - CONCRETE PAVING NET INCREASE TO: SECTION III - SANITARY SEWER NET INCREASE TO: SECTION IV - WATER MAIN $2,800.00 $14,208.00 $45,100.00 NET INCREASE TO CONTRACT: $62,108.00 CITY OF OSHKOSH BY: ., _ Recommended: - City Manager J G Director of Public Works City Clerk J Approved and accepted: Contract I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. iV omptroller �_" CONTRACT: 09 -05 CHANGE ORDER # 1 SECTION I - CONCRETE PAVING ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION I 121 Preparation of foundation for Asphalt Paving on Marine Dr., complete as specified lump sum 1.00 1.00 $2,800.00 $2,800.00 ADDITIONAL WORK: C.O. # 1 - (ITEM 121) - SUB -TOTAL $2,800.00 $0.00 NET INCREASE TO: SECTION 1 $2,800.00 SECTION III - SANITARY SEWER ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION III Additional price pre foot to ITEM use 10" C -900 Cert -a -lok CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT NUMBER complete as specified Foot QUANTITIES 400.00 400.00 DECREASE $13.35 PRICE PRICE 121 Preparation of foundation for Asphalt Paving on Marine Dr., complete as specified lump sum 1.00 1.00 $2,800.00 $2,800.00 ADDITIONAL WORK: C.O. # 1 - (ITEM 121) - SUB -TOTAL $2,800.00 $0.00 NET INCREASE TO: SECTION 1 $2,800.00 SECTION III - SANITARY SEWER ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION III 317 Additional price pre foot to ITEM use 10" C -900 Cert -a -lok CONTRACT INSTALLED NET NET COST PER INCREASE 1N DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT NUMBER complete as specified Foot QUANTITIES 400.00 400.00 DECREASE $13.35 PRICE PRICE 317 Additional price pre foot to ITEM use 10" C -900 Cert -a -lok CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN Pipe through Casing Pipe, Linear CONTRACT CONTRACT NUMBER complete as specified Foot QUANTITIES 400.00 400.00 DECREASE $13.35 $5,340.00 318 Additional price per foot to Each 250.00 250.00 $104.40 PRICE PRICE 422 use 12" C -900 Cert-a -lok Pipe through casing pipes, complete as specified Each 400.00 400.00 $17.42 $6,968.00 319 Furnish & install 10" solid sleeves with Megalugs, complete asspecified Each 2.00 2.00 $450.00 $900.00 320 Furnish & install 12" solid sleeves with Megalugs, complete as specified Each 2.00 1 2.00 1 1 $500.00 1 $1,000.00 ADDITIONAL WORK: C. O. # 1 - (ITEMS 317 - 320) - SUB -TOTAL $14,208.00 $0.00 NET INCREASE TO: SECTION 111 $14,208.00 SECTION IV - WATER MAIN ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION IV 421 Furnish and install 16" ITEM Ductile Iron Watermain CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION UNIT CONTRACT CONTRACT NUMBER as specified (fittings not QUANTITIES QUANTITIES INCREASE DECREASE UNIT included) Each 250.00 250.00 $104.40 PRICE PRICE 421 Furnish and install 16" Ductile Iron Watermain with Poly Warp, complete as specified (fittings not included) Each 250.00 250.00 $104.40 $26,100.00 422 Furnish and install 16" 45 degree bends, complete as specified Each 3.00 3.00 $860.00 $2,580.00 Page 1 CONTRACT: 09 -05 CHANGE ORDER # 1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 423 Furnish and install 16" 22.5 degree bends, . complete asspecified Each 1.00 1.00 $860.00 $860.00 424 Furnish and install 16" 11.25 degree bends, complete asspecified Each 1.00 1.00 1 $850.00 $850.00 425 Furnish & install 16" x 6" reducer, complete as sped ied Each 1.00 1.00 $650.00 $650.00 426 Furnish and install 16" valve, complete as s ecified Each 1.00 1.00 $6,460.00 $6,460.00 427 Furnish and install 6" 45 degree bends, complete asspecified Each 1 8.00 8.00 $175.00 $1,400.00 428 Relocate existing Hydrants, complete as specified Each 1.00 1.00 $1,500.00 $1,500.00 429 Abandon water valve manhole, complete as specified Each 1.00 1 1.00 $4,700.00 $4,700.00 ADDITIONAL WORK: C.O. # 1 (ITEMS 421-429) -SUB-TOTAL $45,100.00 $0.00 NET INCREASE TO: SECTION IV - $45,100.00 NET INCREASE TO SECTIONS I, II, III, IV $62,108.00 NET DECREASE TO SECTIONS I, II, III, IV $0.00 NET INCREASE TO CONTRACT: $62,108.00 Page 2