Loading...
HomeMy WebLinkAboutpw cnt 08-04 cng # 3 vintonCHANGE ORDER # 3 DATED: April 20, 2009 TO: Vinton Construction Co. P. O. Box 1987 Manitowoc, WI 54221 -1987 Your present contract with the City of Oshkosh, Contract No. 08 -04 , is hereby amended and changed as follows: NET INCREASE TO: SECTION I - CONCRETE PAVING NET INCREASE TO: SECTION II - STORM SEWER NET INCREASE TO: SECTION III -SANITARY SEWER NET INCREASE TO: SECTION IV -WATER MAIN NET INCREASE TO CONTRACT: M Recommended: Director of Public Works $13.07 $13,034.08 $7,066.19 $40,728.63 $60,841.97 CITY OF OSHKOSH W NW I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller • ! �7y�i -fi Approved and accepted: CONTRACT: 08 -04 CHANGE ORDER # 3 SECTION I - CONCRETE PAVING ITEM I DESCRIPTION I UNIT NUMRER CONTRACT INSTALLED I NET NET 'OSTPER ! CONTRACT D CONTRA EI QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PR 100 Pavement removal, complete ass specified Square Yards 10,200 10,164.50 -35.50 $2.00 ($71.00 101 Sidewalk and driveway removal, complete as specified Square Feet 30,780 30,290.70 - 489.30 $0.38 ($185.93) 102 Excavation, complete as specified Cubic Yards 8,185 7,791.50 - 393.50 $7.50 $2,951.25 103 7" non - reinforced concrete pavement, plain, 5" base material and grading, complete as specified Square Yards 8,500 8,224.70 - 275.30 $29.57 ($8,140.62 104 7" non - reinforced concrete pavement, including integral curb, 5" base material and grading, complete as specified Square Yards 6,725 6,588.50 - 136.50 $29.57 ($4,036.31 105 8" non - reinforced concrete pavement, including integral curb and grading, base in place, complete as specified Square Yards 1 ,745 1,737.40 -7.60 $30.86 ($234.54) 106 8" non - reinforced concrete pavement, special HES (9- bag), including integral curb, 6" base material and grading, complete as specified Square Yards 270 392.10 122.10 T $40.10 $4,896.21 107 8" non - reinforced H.E.S. concrete pavement, including integral curb, 6" base material and grading, complete as specified Square Yards 900 1,266.60 366.60 $37.10 $13,600.86 108 12° wide radius curb head, complete as specified Linear Feet 474 516.40 42.40 $5.00 $212.00 109 Standard 30" curb & gutter, 7" (mainline), complete as s ecified Linear Feet 5,610 4,733.00 - 877.00 $6.50 $5,700.50) 110 Standard 30" curb & gutter, 7" (tie -in), complete as s ecified Linear Feet 110 109.00 -1.00 $17.50 ($17.50) 111 Standard 30" curb & gutter, 8" (mainline), complete as specified Linear Feet 620 608.90 -11.10 $6.50 $72.15) 112 Sidewalk curb, complete as Linear 12.80 -17.20 $25.00 $430.00 specified Feet 30 113 4" concrete sidewalk, complete asspecified Square Feet 10,180 12,811.90 2,631.90 $2.94 $7,737.79 114 6" concrete sidewalk & driveway, complete as specified Square Feet 23,721 28,866.10 5,145.10 $3.35 $17,236.09 Page 1 CONTRACT: 08 -04 CHANGE ORDER # 3 Page 2 INCREASE IN DECREASE IN ITEM CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 115 8" concrete sidewalk & driveway, complete as Square 1,580 1,606.70 26.70 $3.78 $100.93 specified Feet 116 3 %Z' asphaltic concrete driveway, complete as Square 56 117.70 61.70 $38.10 $2,350.77 specified Yards 117 3 %2" asphaltic concrete transition, with base, com lete specified Square Yards 480 393.50 -86.50 $35.90 ($3,105.35 118 2 W asphaltic concrete pavement, lower layer, complete asspecified Tons 245 217.54 -27.46 $51.10 $1,403.21 119 2 %4" asphaltic concrete pavement, upper layer, com lete specified Tons 200 196.37 -3.63 $50.90 ($184.77) 120 Preparation of foundation for asphalt paving on Omni Drive, complete as Lump $1,850.00 s ecified Sum 1 1.00 121 Tack or prime coat, $3.00 complete asspecified Gallon 50 50.00 122 Furnish and install crushed stone base course, complete as specified Tons 3,101 0.00 - 3,101.00 $8.50 ($26,358.50 123 Sawing, complete as Linear 1,760 2,498.00 738.00 $2.00 $1,476.00 specified Feet 124 Furnish and install pavement ties (epoxy coated), complete as specified Each 324 418.0 0 94.00 $ 7.00 $658.00 125 Adjust manholes and inlets, complete as specified Each 110 111.00 1.00 $265.00 $265.00 126 Furnish and install No. 4 reinforcing bars (epoxy coated), complete as Linear 360 0.00 - 360.00 $0.85 (;$306.00) s ecified Feet 127 Furnish and install trees, 12 10.00 -2.00 $250.00 (:$500.00) complete ass specified Each 128 Remove stumps, complete Inch 20 22.00 2.00 $5.00 $10.00 asspecified Diameter 129 Remove trees and stumps, complete as specified Inch 96.00 $ 22.00 $2,112.00 Diameter 190 286.00 130 Provide and install metal detectable warning plates, complete as specified Square Feet 288 284.00 -4.00 $28.00 ($112.00) 131 Terrace work on alley south of Waugoo Avenue, Lump $1,000.00 complete ass specified Sum 1 1.00 132 Terrace work on Central Street, complete as Lump $11,500.00 specified Sum 1 1.00 133 Terrace work on Frederick Street, complete as Lump 1 1.00 $11,500.00 specified Sum Page 2 CONTRACT: 08 -04 CHANGE ORDER # 3 ITEM Furnish and install 12" CONTRACT INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 134 Terrace work on Hickory UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE Street, complete as Lump $7,500.00 specified Sum 1 1.00 - 4.79 $45.00 ($215.55) 135 Terrace work on Leeward Court, complete as Lump 1,715 1,699.97 -15.03 $1,000.00 ($635.02) specified Sum 1 1.00 136 Terrace work on W. Lincoln Avenue, complete as Lump 890 885.94 - 4.06 $5,000.00 (;$180.67) specified Sum 1 1.00 137 Terrace work on Omni " Drive, complete as Lump 1 1.00 $11,000.00 specified Sum 138 Terrace work on Oregon Linear Feet 75 64.00 -11.00 $115.75 ($11,273.25) 205 Street/Hughes Street, Lump complete ass ecified Sum 1 1.00 $600.00 139 Excavation, Special, complete asspecified Ton 500 592.93 92.93 -4.12 $34.08 $3,167.05 ($214.86) 140 Concrete speed hump with flow through curb and Linear Feet 285 278.22 -6.78 $58.25 ($394.93) gutter, complete as Lump 1 1.00 1 $3,500.00 specified Sum SECTION I - (BID ITEMS 100 -141) - SUB - TOTALS $53,822.70 ($53,809.63) NET INCREASE TO: SECTION I - $13.07 SECTION II - STORM SEWER 200 Furnish and install 12" INCREASE IN DECRE ASE IN ITEM storm sewer, complete as specified Linear Feet CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 200 Furnish and install 12" storm sewer, complete as specified Linear Feet 1,675 1,789.15 114.15 $38.55 $4,400.48 201 Furnish and install 12" RCP Class III storm sewer, complete as specified Linear Feet 57 52.21 - 4.79 $45.00 ($215.55) 202 Furnish and install 15" storm sewer, complete as Linear 1,715 1,699.97 -15.03 $42.25 ($635.02) specified Feet 203 Furnish and install 18" storm sewer, complete as Linear 890 885.94 - 4.06 $44.50 (;$180.67) specified Feet 204 Furnish and install 18" " storm sewer with joint ties, clay bedding, and backfill, complete as specified Linear Feet 75 64.00 -11.00 $115.75 ($11,273.25) 205 Furnish and install 18" RCP Class V storm sewer, complete as specified Linear Feet 315 310.88 -4.12 $52.15 ($214.86) 206 Furnish and install 21" storm sewer, complete as Linear Feet 285 278.22 -6.78 $58.25 ($394.93) specified Page 3 CONTRACT: 08 -04 CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 207 Furnish and install 24" storm sewer, complete as Linear 240 240.17 0.17 $69.15 $11.76 specified Feet 208 Furnish and install 38" x 60" RCP Class III storm sewer, complete as Linear 80 80.04 0.04 $275.00 $11.00 specified Feet 209 Furnish and install 18" RCP Class III apron endwall with joint ties, complete as $675.00 specified Each 1 1.00 210 Furnish and install std. Inlets (Type 3 with 18" sump) with castings, complete asspecified Each 42 43.00 1.00 $1,235.00 $1,235.00 211 Furnish and install std. storm manhole (2' inside diameter) in 1 (one) location without casting, Vertical 1.19 -0.23 $565.00 ($129.95 complete ass ecified Feet 1.42 212 Furnish and install std storm manhole (4' inside diameter) in 23 locations without casting, complete Vertical 86 84.83 -1.17 $340.00 ($397.80) asspecified Feet 213 Furnish and install std. storm manhole (5' inside diameter) in 1 (one) location without casting, Vertical 9.20 5.69 $525.00 $2,987.25 com fete ass specified Feet 3.51 214 Furnish and install std. storm manhole (6' inside diameter) in 1 (one) location without casing, Vertical 3.72 -0.26 $625.00 ($162.50 complete ass specified Feet 3.98 215 Furnish and install std. storm box manhole (5' x 6) in 2 (two) locations without casting, complete as Vertical 5.64 6.36 0.72 $821.00 $591.12 specified Feet 216 Furnish and install 6" storm lateral, complete as specified Linear Feet 3,259 3,454.00 195.00 $28.50 $5,557.50 217 Furnish and install storm lateral marker balls, complete ass specified Each 218 219.00 1.00 $15.50 $15.50 218 Abandon 8"- 12" storm sewer, complete as specified Linear Feet 1,253 1,394.00 141.00 $9.00 $1,269.00 219 Abandon 15" and larger storm sewer, complete as Linear s ecified Feet 321 321.00 $9.00 220 Abandon inlets or manholes, complete as specified I Each 36 40.00 4.00 $250.00 $1,000.00 Page 4 CONTRACT: 08 -04 CHANGE ORDER # 3 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITIES INSTALLED QUANTITIES NET INCREASE NET DECREASE COSTPER UNIT INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 221 Furnish, install, and CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER maintain Type "C" inlet UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PftICE 301 protection in 2 (two) locations, complete as Vertical Feet 2 3.00 1.00 -1.10 $35.00 $35.00 $412.50) 302 specified Each 222 Furnish, install, and maintain Type "D" inlet Linear Feet 1225 1,727.54 2.54 $61.00 $154.94 303 protection in 70 locations, Each 70 65.00 -5.00 $95.00 ($475.00) complete ass specified SECTION II - (BID ITEMS 200 - 225) - SUB - TOTALS $17,113.61 ($4,079.63) NET INCREASE TO: SECTION II - $13,034.08 SECTION III - SANITARY SEWER 300 Furnish and install 8" INCREASEIN DECREASEIN ITEM sanitary sewer (relay /new), CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PftICE 300 Furnish and install 8" sanitary sewer (relay /new), complete as specified Linear Feet 1,700 1,703.50 3.50 $60.00 $210.00 301 Furnish and install 8" sanitary sewer drop, complete ass ecified Vertical Feet 1.10 0.00 -1.10 $375.00 $412.50) 302 Furnish and install 10" sanitary sewer (relay /new), complete as specified Linear Feet 1225 1,727.54 2.54 $61.00 $154.94 303 Furnish and install 12" sanitary sewer (relay /new), complete as specified Linear Feet 700 702.90 2.90 $81.65 $236.78 304 Furnish and install 12" sanitary sewer drop, complete asspecified Vertical Feet 2.50 2.42 -0.08 $950.00 ($76.00) 305 Furnish and install 15" sanitary sewer relay, Linear 5 2.00 -3.00 $158.00 (;$474.00) complete asspecified Feet 306 Furnish and install std. sanitary manhole (4' inside diameter) in 13 locations, complete as specified, Vertical 180 186.89 6.89 $173.00 $1,191.97 without casing Feet 307 Furnish and install 8" x 4" factory wye, complete as 1 0.00 -1.00 $67.00 $67.00) specified Each 308 Furnish and install 8" x 6" factory wyes, complete as 30 44.00 14.00 $80.00 $1,120.00 specified Each 309 Furnish and install 10" x 6" factory wyes, complete as 60 59.00 -1.00 $130.00 $130.00) s ecified Each 310 Furnish and install 12" x 6" factory wyes, complete as Each 12 0.00 -12.00 $185.00 ($2,220.00 specified Page 5 CONTRACT; 08 -04 CHANGE ORDER # 3 ITEM Furnish and install 6" CONTRACT INSTALLED NET NET COSTPER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 311 Furnish and install 4 " /6" UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE sanitary lateral new /relay, complete ass ecified Linear Feet 2,605 2,751.50 146.50 -2.00 $48.00 $7,032.00 ($111.30) 312 Furnish and install Feet 401 connections of new sanitary main to existing main, (various locations and sizes), complete as Linear 9 11.00 2.00 $300.00 $600.00 specified Each - 313 Abandon sanitary manholes, complete as 2 3.00 1.00 $475.00 $510.00 specified Each 1 1.00 314 Abandon sanitary sewer on Central Street, complete as Lump specified Sum 1 1.00 $1,000.00 315 Furnish and install sanitary Linear Feet 2,065 2,110.50 45.50 $44.15 $2,008.83 404 lateral marker balls, complete as specified $15.50 specified, not including corporation and stop box Each 210 210.00 -4.00 $44.10 ($176.40) 316 Remove existing sanitary manhole, complete as 2 4.00 2.00 $500.00 $1,000.00 specified Each 317 Furnish and install concrete collars, complete as Each 2 0.00 -2.00 $550.00 ($1,100.00 specified SECTION III - (BID ITEMS 300 - 317) - SUB - TOTALS $11,545.69 ($4,479.50) NET INCREASE TO: SECTION III - $7,066.19 SECTION IV - WATER MAIN 400 Furnish and install 6" INCREASE IN DECREASE IN ITEM ductile iron water main CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 400 Furnish and install 6" ductile iron water main w /poly wrap, complete as specified (fittings not Linear 220 218.00 -2.00 $55.65 ($111.30) included ) Feet 401 Furnish and install 8" ductile iron water main w /poly wrap, complete as specified (fittings not Linear 4,255 4,344.00 89.00 $62.50 $5,562.50 included ) Feet - 402 Reconnect 1" - 1 ' /2 ' water services, complete as 2 3.00 1.00 $510.00 $510.00 specified Each 403 Furnish and install 1" water service relay, complete as specified, not including corporation and stop box Linear Feet 2,065 2,110.50 45.50 $44.15 $2,008.83 404 Furnish and install new 1" water service, complete as specified, not including corporation and stop box Linear Feet 25 21.00 -4.00 $44.10 ($176.40) Page 6 CONTRACT: 08 -04 CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 405 Furnish and install 1" corporation and stop box with rod, complete as Each 91 89.00 -2.00 $254.00 ($508.00 specified 406 Furnish and install 8" x 6" tees, complete as specified Each 11 11.00 $315.00 407 Furnish and install 8" x 6" reducers, complete as $190.00 s ecified Each 3 3.00 408 Furnish and install 8" - 45 degree bends, complete as 7 10.00 3.00 $295.00 $885.00 specified Each 409 Furnish and install 6" valves, complete as 10 12.00 2.00 $825.00 $1,650.0 s ecified Each 410 Furnish and install 8" valves, complete as 8 22.00 14.00 $1,075.00 $15,050.00 specified Each 411 Furnish and install 8" x 8" cross, complete as 2 3.00 1.00 $780.00 $780.00 specified Each 412 Furnish and install 6" sleeve, complete as 3 5.00 2.00 $245.00 $490.00 specified Each 413 Furnish and install 6" x 6" tapping valve and sleeve, 6.00 2.00 $1,940.00 $3,880.00 Icompjete asspecified Each 4 414 Furnish and install hydrants, complete as 10 11.00 1.00 $2,200.00 $2,200.00 specified Each 415 Furnish and install gradeloks for hydrant branches, complete as 10 0.00 -10.00 $345.00 ($3,450.00) specified Each 416 Furnish and install connections of new water main to existing water main (various sizes and locations), complete as 5 7.00 2.00 $1,600.00 $3,200.00 specified Each 417 Abandon water main on Central Street (W. Irving Ave. to Scott Ave.), including crossing streets, Lump complete as specified Sum 1 1.00 $2,210.00 418 Abandon water main on Frederick Street (W. Irving Ave. to Scott Ave.), Lump $2,800.00 complete asspecified Sum 1 1.00 419 Abandon water main on W. Lincoln Avenue (Franklin St. to N. Main St.), complete as specified Lump $2,800.00 1 Sum 1 1.00 420 Furnish and install 6" - 45 bends, complete as Each 2 12.00 10.00 $385.00 $3,850.00 specified Page 7 CONTRACT: 08 -04 CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 421 Furnish and install 6" x 8" UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE enlarger, complete as $168.00 specified Each 1 1.00 422 Abandon water main on Woodland Avenue (Algoma Blvd. to Elmwood Ave.), complete as specified Lump Sum 1 1.00 $2,000.00 423 Furnish and install 4" ductile iron water main w /ploy wrap, complete as specified, (fittings not Linear 5 7.00 2.00 $134.00 $268.00 includedl Feet 1 424 Furnish and install 8" x 4" tee, complete as specified Each 1 1.00 $265.00 425 Furnish and install 4" valve, complete as specified $715.00 Each 1 1.00 426 Furnish and install 12" x 8" tapping valve and sleeve, complete as specified Each 1 1.00 $2,850.00 427 Furnish and install 6" x 6" x 6" anchoring tee and valve, complete as specified Each 1 2.00 1.00 $2 $2,240.00 SECTION IV - (BID ITEMS 400 - 427) - SUB - TOTALS $42,574.33 ($4,245.70) ADDITIONAL WORK REQUIRED: C.O. # 3 - SECTION IV 439 Additional labor, equipment and materials to install 8" x 8' Cross instead of 8" x 6" Cross including removals, per Invoice # 8558 Lump Sum 1.00 1.00 $2,400.00 $2,400.00 ADDITIONAL WORK: C.O. # 3 (ITEM 439) - SUB -TOTAL $2,400.00 $0.00 NET INCREASE TO: SECTION IV - $40,728.63 NET INCREASE TO SECTIONS I, II, III, IV $127,456.33 NET DECREASE TO SECTIONS 1, II, III, IV ($66,614.36) NET INCREASE TO CONTRACT: $60,841.97 Page 8 INCREASE IN DECREASE IN ITEM CONTRACT INSTALLED NET NET I COST PER CONTRACT CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 439 Additional labor, equipment and materials to install 8" x 8' Cross instead of 8" x 6" Cross including removals, per Invoice # 8558 Lump Sum 1.00 1.00 $2,400.00 $2,400.00 ADDITIONAL WORK: C.O. # 3 (ITEM 439) - SUB -TOTAL $2,400.00 $0.00 NET INCREASE TO: SECTION IV - $40,728.63 NET INCREASE TO SECTIONS I, II, III, IV $127,456.33 NET DECREASE TO SECTIONS 1, II, III, IV ($66,614.36) NET INCREASE TO CONTRACT: $60,841.97 Page 8