HomeMy WebLinkAboutpw cnt 08-04 cng # 3 vintonCHANGE ORDER # 3
DATED: April 20, 2009
TO: Vinton Construction Co.
P. O. Box 1987
Manitowoc, WI 54221 -1987
Your present contract with the City of Oshkosh, Contract No. 08 -04 , is hereby amended
and changed as follows:
NET INCREASE TO:
SECTION I - CONCRETE PAVING
NET INCREASE TO:
SECTION II - STORM SEWER
NET INCREASE TO:
SECTION III -SANITARY SEWER
NET INCREASE TO:
SECTION IV -WATER MAIN
NET INCREASE TO CONTRACT:
M
Recommended:
Director of Public Works
$13.07
$13,034.08
$7,066.19
$40,728.63
$60,841.97
CITY OF OSHKOSH
W NW
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
Comptroller
• ! �7y�i -fi
Approved and accepted:
CONTRACT: 08 -04 CHANGE ORDER # 3
SECTION I - CONCRETE PAVING
ITEM I DESCRIPTION I UNIT
NUMRER
CONTRACT INSTALLED I NET NET 'OSTPER ! CONTRACT D CONTRA EI
QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PR
100
Pavement removal,
complete ass specified
Square
Yards
10,200
10,164.50
-35.50
$2.00
($71.00
101
Sidewalk and driveway
removal, complete as
specified
Square
Feet
30,780
30,290.70
- 489.30
$0.38
($185.93)
102
Excavation, complete as
specified
Cubic
Yards
8,185
7,791.50
- 393.50
$7.50
$2,951.25
103
7" non - reinforced concrete
pavement, plain, 5" base
material and grading,
complete as specified
Square
Yards
8,500
8,224.70
- 275.30
$29.57
($8,140.62
104
7" non - reinforced concrete
pavement, including
integral curb, 5" base
material and grading,
complete as specified
Square
Yards
6,725
6,588.50
- 136.50
$29.57
($4,036.31
105
8" non - reinforced concrete
pavement, including
integral curb and grading,
base in place, complete as
specified
Square
Yards
1 ,745
1,737.40
-7.60
$30.86
($234.54)
106
8" non - reinforced concrete
pavement, special HES (9-
bag), including integral
curb, 6" base material and
grading, complete as
specified
Square
Yards
270
392.10
122.10
T
$40.10
$4,896.21
107
8" non - reinforced H.E.S.
concrete pavement,
including integral curb, 6"
base material and grading,
complete as specified
Square
Yards
900
1,266.60
366.60
$37.10
$13,600.86
108
12° wide radius curb head,
complete as specified
Linear
Feet
474
516.40
42.40
$5.00
$212.00
109
Standard 30" curb & gutter,
7" (mainline), complete as
s ecified
Linear
Feet
5,610
4,733.00
- 877.00
$6.50
$5,700.50)
110
Standard 30" curb & gutter,
7" (tie -in), complete as
s ecified
Linear
Feet
110
109.00
-1.00
$17.50
($17.50)
111
Standard 30" curb & gutter,
8" (mainline), complete as
specified
Linear
Feet
620
608.90
-11.10
$6.50
$72.15)
112
Sidewalk curb, complete as
Linear
12.80
-17.20
$25.00
$430.00
specified
Feet
30
113
4" concrete sidewalk,
complete asspecified
Square
Feet
10,180
12,811.90
2,631.90
$2.94
$7,737.79
114
6" concrete sidewalk &
driveway, complete as
specified
Square
Feet
23,721
28,866.10
5,145.10
$3.35
$17,236.09
Page 1
CONTRACT: 08 -04 CHANGE ORDER # 3
Page 2
INCREASE
IN
DECREASE IN
ITEM
CONTRACT
INSTALLED
NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
115
8" concrete sidewalk &
driveway, complete as
Square
1,580
1,606.70
26.70
$3.78
$100.93
specified
Feet
116
3 %Z' asphaltic concrete
driveway, complete as
Square
56
117.70
61.70
$38.10
$2,350.77
specified
Yards
117
3 %2" asphaltic concrete
transition, with base,
com lete specified
Square
Yards
480
393.50
-86.50
$35.90
($3,105.35
118
2 W asphaltic concrete
pavement, lower layer,
complete asspecified
Tons
245
217.54
-27.46
$51.10
$1,403.21
119
2 %4" asphaltic concrete
pavement, upper layer,
com lete specified
Tons
200
196.37
-3.63
$50.90
($184.77)
120
Preparation of foundation
for asphalt paving on Omni
Drive, complete as
Lump
$1,850.00
s ecified
Sum
1
1.00
121
Tack or prime coat,
$3.00
complete asspecified
Gallon
50
50.00
122
Furnish and install crushed
stone base course,
complete as specified
Tons
3,101
0.00
- 3,101.00
$8.50
($26,358.50
123
Sawing, complete as
Linear
1,760
2,498.00
738.00
$2.00
$1,476.00
specified
Feet
124
Furnish and install
pavement ties (epoxy
coated), complete as
specified
Each
324
418.0 0
94.00
$ 7.00
$658.00
125
Adjust manholes and inlets,
complete as specified
Each
110
111.00
1.00
$265.00
$265.00
126
Furnish and install No. 4
reinforcing bars (epoxy
coated), complete as
Linear
360
0.00
- 360.00
$0.85
(;$306.00)
s ecified
Feet
127
Furnish and install trees,
12
10.00
-2.00
$250.00
(:$500.00)
complete ass specified
Each
128
Remove stumps, complete
Inch
20
22.00
2.00
$5.00
$10.00
asspecified
Diameter
129
Remove trees and stumps,
complete as specified
Inch
96.00
$ 22.00
$2,112.00
Diameter
190
286.00
130
Provide and install metal
detectable warning plates,
complete as specified
Square
Feet
288
284.00
-4.00
$28.00
($112.00)
131
Terrace work on alley
south of Waugoo Avenue,
Lump
$1,000.00
complete ass specified
Sum
1
1.00
132
Terrace work on Central
Street, complete as
Lump
$11,500.00
specified
Sum
1
1.00
133
Terrace work on Frederick
Street, complete as
Lump
1
1.00
$11,500.00
specified
Sum
Page 2
CONTRACT: 08 -04 CHANGE ORDER # 3
ITEM
Furnish and install 12"
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
134
Terrace work on Hickory
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
Street, complete as
Lump
$7,500.00
specified
Sum
1
1.00
- 4.79
$45.00
($215.55)
135
Terrace work on Leeward
Court, complete as
Lump
1,715
1,699.97
-15.03
$1,000.00
($635.02)
specified
Sum
1
1.00
136
Terrace work on W. Lincoln
Avenue, complete as
Lump
890
885.94
- 4.06
$5,000.00
(;$180.67)
specified
Sum
1
1.00
137
Terrace work on Omni
"
Drive, complete as
Lump
1
1.00
$11,000.00
specified
Sum
138
Terrace work on Oregon
Linear
Feet
75
64.00
-11.00
$115.75
($11,273.25)
205
Street/Hughes Street,
Lump
complete ass ecified
Sum
1
1.00
$600.00
139
Excavation, Special,
complete asspecified
Ton
500
592.93
92.93
-4.12
$34.08
$3,167.05
($214.86)
140
Concrete speed hump with
flow through curb and
Linear
Feet
285
278.22
-6.78
$58.25
($394.93)
gutter, complete as
Lump
1
1.00
1
$3,500.00
specified
Sum
SECTION I - (BID ITEMS 100 -141) - SUB - TOTALS $53,822.70 ($53,809.63)
NET INCREASE TO: SECTION I - $13.07
SECTION II - STORM SEWER
200
Furnish and install 12"
INCREASE IN
DECRE ASE IN
ITEM
storm sewer, complete as
specified
Linear
Feet
CONTRACT
INSTALLED
NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
200
Furnish and install 12"
storm sewer, complete as
specified
Linear
Feet
1,675
1,789.15
114.15
$38.55
$4,400.48
201
Furnish and install 12" RCP
Class III storm sewer,
complete as specified
Linear
Feet
57
52.21
- 4.79
$45.00
($215.55)
202
Furnish and install 15"
storm sewer, complete as
Linear
1,715
1,699.97
-15.03
$42.25
($635.02)
specified
Feet
203
Furnish and install 18"
storm sewer, complete as
Linear
890
885.94
- 4.06
$44.50
(;$180.67)
specified
Feet
204
Furnish and install 18"
"
storm sewer with joint ties,
clay bedding, and backfill,
complete as specified
Linear
Feet
75
64.00
-11.00
$115.75
($11,273.25)
205
Furnish and install 18" RCP
Class V storm sewer,
complete as specified
Linear
Feet
315
310.88
-4.12
$52.15
($214.86)
206
Furnish and install 21"
storm sewer, complete as
Linear
Feet
285
278.22
-6.78
$58.25
($394.93)
specified
Page 3
CONTRACT: 08 -04 CHANGE ORDER # 3
ITEM
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
207
Furnish and install 24"
storm sewer, complete as
Linear
240
240.17
0.17
$69.15
$11.76
specified
Feet
208
Furnish and install 38" x
60" RCP Class III storm
sewer, complete as
Linear
80
80.04
0.04
$275.00
$11.00
specified
Feet
209
Furnish and install 18" RCP
Class III apron endwall with
joint ties, complete as
$675.00
specified
Each
1
1.00
210
Furnish and install std.
Inlets (Type 3 with 18"
sump) with castings,
complete asspecified
Each
42
43.00
1.00
$1,235.00
$1,235.00
211
Furnish and install std.
storm manhole (2' inside
diameter) in 1 (one)
location without casting,
Vertical
1.19
-0.23
$565.00
($129.95
complete ass ecified
Feet
1.42
212
Furnish and install std
storm manhole (4' inside
diameter) in 23 locations
without casting, complete
Vertical
86
84.83
-1.17
$340.00
($397.80)
asspecified
Feet
213
Furnish and install std.
storm manhole (5' inside
diameter) in 1 (one)
location without casting,
Vertical
9.20
5.69
$525.00
$2,987.25
com fete ass specified
Feet
3.51
214
Furnish and install std.
storm manhole (6' inside
diameter) in 1 (one)
location without casing,
Vertical
3.72
-0.26
$625.00
($162.50
complete ass specified
Feet
3.98
215
Furnish and install std.
storm box manhole (5' x 6)
in 2 (two) locations without
casting, complete as
Vertical
5.64
6.36
0.72
$821.00
$591.12
specified
Feet
216
Furnish and install 6" storm
lateral, complete as
specified
Linear
Feet
3,259
3,454.00
195.00
$28.50
$5,557.50
217
Furnish and install storm
lateral marker balls,
complete ass specified
Each
218
219.00
1.00
$15.50
$15.50
218
Abandon 8"- 12" storm
sewer, complete as
specified
Linear
Feet
1,253
1,394.00
141.00
$9.00
$1,269.00
219
Abandon 15" and larger
storm sewer, complete as
Linear
s ecified
Feet
321
321.00
$9.00
220
Abandon inlets or
manholes, complete as
specified
I Each
36
40.00
4.00
$250.00
$1,000.00
Page 4
CONTRACT: 08 -04 CHANGE ORDER # 3
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
QUANTITIES
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
COSTPER
UNIT
INCREASE IN
CONTRACT
PRICE
DECREASE IN
CONTRACT
PRICE
221
Furnish, install, and
CONTRACT
INSTALLED
NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
maintain Type "C" inlet
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PftICE
301
protection in 2 (two)
locations, complete as
Vertical
Feet
2
3.00
1.00
-1.10
$35.00
$35.00
$412.50)
302
specified
Each
222
Furnish, install, and
maintain Type "D" inlet
Linear
Feet
1225
1,727.54
2.54
$61.00
$154.94
303
protection in 70 locations,
Each
70
65.00
-5.00
$95.00
($475.00)
complete ass specified
SECTION II - (BID ITEMS 200 - 225) - SUB - TOTALS $17,113.61 ($4,079.63)
NET INCREASE TO: SECTION II - $13,034.08
SECTION III - SANITARY SEWER
300
Furnish and install 8"
INCREASEIN
DECREASEIN
ITEM
sanitary sewer (relay /new),
CONTRACT
INSTALLED
NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PftICE
300
Furnish and install 8"
sanitary sewer (relay /new),
complete as specified
Linear
Feet
1,700
1,703.50
3.50
$60.00
$210.00
301
Furnish and install 8"
sanitary sewer drop,
complete ass ecified
Vertical
Feet
1.10
0.00
-1.10
$375.00
$412.50)
302
Furnish and install 10"
sanitary sewer (relay /new),
complete as specified
Linear
Feet
1225
1,727.54
2.54
$61.00
$154.94
303
Furnish and install 12"
sanitary sewer (relay /new),
complete as specified
Linear
Feet
700
702.90
2.90
$81.65
$236.78
304
Furnish and install 12"
sanitary sewer drop,
complete asspecified
Vertical
Feet
2.50
2.42
-0.08
$950.00
($76.00)
305
Furnish and install 15"
sanitary sewer relay,
Linear
5
2.00
-3.00
$158.00
(;$474.00)
complete asspecified
Feet
306
Furnish and install std.
sanitary manhole (4' inside
diameter) in 13 locations,
complete as specified,
Vertical
180
186.89
6.89
$173.00
$1,191.97
without casing
Feet
307
Furnish and install 8" x 4"
factory wye, complete as
1
0.00
-1.00
$67.00
$67.00)
specified
Each
308
Furnish and install 8" x 6"
factory wyes, complete as
30
44.00
14.00
$80.00
$1,120.00
specified
Each
309
Furnish and install 10" x 6"
factory wyes, complete as
60
59.00
-1.00
$130.00
$130.00)
s ecified
Each
310
Furnish and install 12" x 6"
factory wyes, complete as
Each
12
0.00
-12.00
$185.00
($2,220.00
specified
Page 5
CONTRACT; 08 -04 CHANGE ORDER # 3
ITEM
Furnish and install 6"
CONTRACT
INSTALLED
NET
NET
COSTPER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
311
Furnish and install 4 " /6"
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
sanitary lateral new /relay,
complete ass ecified
Linear
Feet
2,605
2,751.50
146.50
-2.00
$48.00
$7,032.00
($111.30)
312
Furnish and install
Feet
401
connections of new
sanitary main to existing
main, (various locations
and sizes), complete as
Linear
9
11.00
2.00
$300.00
$600.00
specified
Each
-
313
Abandon sanitary
manholes, complete as
2
3.00
1.00
$475.00
$510.00
specified
Each
1
1.00
314
Abandon sanitary sewer on
Central Street, complete as
Lump
specified
Sum
1
1.00
$1,000.00
315
Furnish and install sanitary
Linear
Feet
2,065
2,110.50
45.50
$44.15
$2,008.83
404
lateral marker balls,
complete as specified
$15.50
specified, not including
corporation and stop box
Each
210
210.00
-4.00
$44.10
($176.40)
316
Remove existing sanitary
manhole, complete as
2
4.00
2.00
$500.00
$1,000.00
specified
Each
317
Furnish and install concrete
collars, complete as
Each
2
0.00
-2.00
$550.00
($1,100.00
specified
SECTION III - (BID ITEMS 300 - 317) - SUB - TOTALS $11,545.69 ($4,479.50)
NET INCREASE TO: SECTION III - $7,066.19
SECTION IV - WATER MAIN
400
Furnish and install 6"
INCREASE IN
DECREASE IN
ITEM
ductile iron water main
CONTRACT
INSTALLED
NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
400
Furnish and install 6"
ductile iron water main
w /poly wrap, complete as
specified (fittings not
Linear
220
218.00
-2.00
$55.65
($111.30)
included )
Feet
401
Furnish and install 8"
ductile iron water main
w /poly wrap, complete as
specified (fittings not
Linear
4,255
4,344.00
89.00
$62.50
$5,562.50
included )
Feet
-
402
Reconnect 1" - 1 ' /2 ' water
services, complete as
2
3.00
1.00
$510.00
$510.00
specified
Each
403
Furnish and install 1" water
service relay, complete as
specified, not including
corporation and stop box
Linear
Feet
2,065
2,110.50
45.50
$44.15
$2,008.83
404
Furnish and install new 1"
water service, complete as
specified, not including
corporation and stop box
Linear
Feet
25
21.00
-4.00
$44.10
($176.40)
Page 6
CONTRACT: 08 -04 CHANGE ORDER # 3
ITEM
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
405
Furnish and install 1"
corporation and stop box
with rod, complete as
Each
91
89.00
-2.00
$254.00
($508.00
specified
406
Furnish and install 8" x 6"
tees, complete as specified
Each
11
11.00
$315.00
407
Furnish and install 8" x 6"
reducers, complete as
$190.00
s ecified
Each
3
3.00
408
Furnish and install 8" - 45
degree bends, complete as
7
10.00
3.00
$295.00
$885.00
specified
Each
409
Furnish and install 6"
valves, complete as
10
12.00
2.00
$825.00
$1,650.0
s ecified
Each
410
Furnish and install 8"
valves, complete as
8
22.00
14.00
$1,075.00
$15,050.00
specified
Each
411
Furnish and install 8" x 8"
cross, complete as
2
3.00
1.00
$780.00
$780.00
specified
Each
412
Furnish and install 6"
sleeve, complete as
3
5.00
2.00
$245.00
$490.00
specified
Each
413
Furnish and install 6" x 6"
tapping valve and sleeve,
6.00
2.00
$1,940.00
$3,880.00
Icompjete
asspecified
Each
4
414
Furnish and install
hydrants, complete as
10
11.00
1.00
$2,200.00
$2,200.00
specified
Each
415
Furnish and install
gradeloks for hydrant
branches, complete as
10
0.00
-10.00
$345.00
($3,450.00)
specified
Each
416
Furnish and install
connections of new water
main to existing water main
(various sizes and
locations), complete as
5
7.00
2.00
$1,600.00
$3,200.00
specified
Each
417
Abandon water main on
Central Street (W. Irving
Ave. to Scott Ave.),
including crossing streets,
Lump
complete as specified
Sum
1
1.00
$2,210.00
418
Abandon water main on
Frederick Street (W. Irving
Ave. to Scott Ave.),
Lump
$2,800.00
complete asspecified
Sum
1
1.00
419
Abandon water main on W.
Lincoln Avenue (Franklin
St. to N. Main St.),
complete as specified
Lump
$2,800.00
1
Sum
1
1.00
420
Furnish and install 6" - 45
bends, complete as
Each
2
12.00
10.00
$385.00
$3,850.00
specified
Page 7
CONTRACT: 08 -04 CHANGE ORDER # 3
ITEM
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
421
Furnish and install 6" x 8"
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
enlarger, complete as
$168.00
specified
Each
1
1.00
422
Abandon water main on
Woodland Avenue (Algoma
Blvd. to Elmwood Ave.),
complete as specified
Lump
Sum
1
1.00
$2,000.00
423
Furnish and install 4"
ductile iron water main
w /ploy wrap, complete as
specified, (fittings not
Linear
5
7.00
2.00
$134.00
$268.00
includedl
Feet
1
424
Furnish and install 8" x 4"
tee, complete as specified
Each
1
1.00
$265.00
425
Furnish and install 4" valve,
complete as specified
$715.00
Each
1
1.00
426
Furnish and install 12" x 8"
tapping valve and sleeve,
complete as specified
Each
1
1.00
$2,850.00
427
Furnish and install 6" x 6" x
6" anchoring tee and valve,
complete as specified
Each
1
2.00
1.00
$2
$2,240.00
SECTION IV - (BID ITEMS 400 - 427) - SUB - TOTALS $42,574.33 ($4,245.70)
ADDITIONAL WORK REQUIRED: C.O. # 3 - SECTION IV
439 Additional labor, equipment
and materials to install 8" x
8' Cross instead of 8" x 6"
Cross including removals,
per Invoice # 8558 Lump
Sum 1.00 1.00 $2,400.00 $2,400.00
ADDITIONAL WORK: C.O. # 3 (ITEM 439) - SUB -TOTAL $2,400.00 $0.00
NET INCREASE TO: SECTION IV - $40,728.63
NET INCREASE TO SECTIONS I, II, III, IV $127,456.33
NET DECREASE TO SECTIONS 1, II, III, IV ($66,614.36)
NET INCREASE TO CONTRACT: $60,841.97
Page 8
INCREASE IN
DECREASE IN
ITEM
CONTRACT
INSTALLED
NET
NET
I
COST PER
CONTRACT
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
439 Additional labor, equipment
and materials to install 8" x
8' Cross instead of 8" x 6"
Cross including removals,
per Invoice # 8558 Lump
Sum 1.00 1.00 $2,400.00 $2,400.00
ADDITIONAL WORK: C.O. # 3 (ITEM 439) - SUB -TOTAL $2,400.00 $0.00
NET INCREASE TO: SECTION IV - $40,728.63
NET INCREASE TO SECTIONS I, II, III, IV $127,456.33
NET DECREASE TO SECTIONS 1, II, III, IV ($66,614.36)
NET INCREASE TO CONTRACT: $60,841.97
Page 8