HomeMy WebLinkAboutmsa n main st amend # 3Amendment:
No. 3
To: City of Oshkosh
David Patek, P.E.
216 Church Avenue
Oshkosh, WI 54903 -1130
Date of Issuance: 215109
MSA Project No.: 0930567
This is an amendment to the Agreement dated August 8, 2006 and does acknowledge
that MSA Professional Services, Inc. (MSA) is.,authorized to begin work on the following
project amendment:
Project Name: North Main Street (Algoma Blvd. to Irving Ave)
The project scope has changed due to:
-Phase 2 Hazardous Material investigations are necessary to determine if contaminated
soils exist within the right -of -way
-A transportation project plat is needed for various easements
-The proposed storm sewer has been upsized and will now include reconstruction to the
outlet at the Fox River.
-Extra progress meetings are necessary to meet the project schedule
The scope of the work authorized is:
Section II.A.2 is deleted and replaced as follows to Section A.2.0 of Exhibit A -Basic
Services and Related Matters
2. Perform a Phase 2 Environmental Sampling investigation in accordance with the
Wisconsin Department of Transportation's Facilities Development Manual (FDM) for the
following sites:
-502 N. Main Street
-547 N. Main Street
-563 N. Main Street
-609 N. Main Street
-629 N. Main Street
-694 N. Main Street
Page 1 of 5
Section VIII.A.4.b is added as follows to Section A.2.0 of Exhibit A -Basic Services and
Related Matters
b. The storm sewer trunk line will be upsized to handle additional storm
water flows. The OWNER will provide the ENGINEER with the storm
sewer pipe size for the main trunk line to the outfall. Include replacement
of the existing outfall at the Fox River. Coordination with the Wisconsin
DNR is included.
Section X.A.5 in Section A.2.0 of Exhibit A -Basic Services and Related Matters is
modified as follows
5. Progress Meetings,(8 Meetings) (2 additional meetings)
Section XI. is added as follows to Section A.2.0 of Exhibit A -Basic Services and
Related Matters
XI. TRANSPORTATION PROJECT PLATS
A. Prepare a Transportation Project Plat for the PROJECT in accordance
with Wisconsin Statute 84.095, Facilities Development Manual (FDM)
Chapter 9 - Surveying, FDM Chapter 12 — Right -of -Way Plats, FDM
Chapter 15 — Plan Preparation, and the WisDOT guide to Utility
Coordination, as provided by the OWNER.
1. Each Transportation Project Plat sheet shall show coordinates on
all section corners and on all main line and side road survey
line /reference line PI's.
2. All coordinate information shall be referenced to the Winnebago
County Coordinate System (English) NAD 1983, (2007) adjustment.
3. All recovered monuments shall be shown with size and kind noted
as per FDM Chapter 12 guidelines.
4. Existing access control or access covenants from previous WisDOT
projects, CSM's, or Subdivisions, as provided by the OWNER or
that appear in a title report, shall be shown or noted on the plat.
5. Existing property lines along with CSM's, Subdivisions, Assessor
Plats, County Plats, and Condominium Plats shall be noted on the
plat.
6. A note or table shall be assigned to every Transportation Project
Plat to include the historical basis for dimensioning the existing
highway right -of -way, to also include intersecting roads.
Page 2 of 5
7. Whenever the mainline reference line crosses a section line, the
bearing and distance along the section line shall be shown to the
adjacent quarter corner or section corner. The type and
coordinates of the section corner shall be noted on the plat.
8. Provide a Cogo Printout of the exterior boundaries of the right -of-
way, which specifies closure of the traverse. The ENGINEER shall
bear sole responsibility for closure of the traverse shown on each
recorded plat.
9. Upon final approval by the Region, the ENGINEER shall submit a
final full size, 22" x 30 ", reproducible copy of the plat on bond
paper, along with an electronic file in a Awg AutoCAD format,
version 2005 on a read only CD to the OWNER.
B. Title Searches /Updates
The ENGINEER shall obtain Title Searches, Title Updates, or
Commitments necessary to determine property lines and current
ownerships for the PROJECT. It is estimated that thirty , (30) Title
Searches are required. The ENGINEER shall contract with a title
company to prepare the Title Searches, Title Updates, or
Commitments. The ENGINEER shall provide a copy of the Title
Searches, Title Updates, or Commitments to the OWNER, upon
request.
2. Right -of -Way Descriptions shall be provided for all individual
parcels of land and interests to be acquired as Right -of -Way for the
PROJECT. Descriptions shall be in accordance with the provisions
set forth in Wisconsin Statute 84.095 (7) and Chapter 12 of the
Facilities Development Manual.
3. The ENGINEER shall prepare the descriptions using Microsoft
Word, 7.0 software or software compatible with the OWNER, and
provide a copy of the Descriptions, excluding the recording
information, in hard copy and also in an electronic format to the
OWNER.
4. The ENGINEER shall provide, upon request, ONE (1) survey
efforts to field locate and temporarily mark the new right -of -way
boundaries including all temporary and permanent easements in a
manner which will facilitate the appraisal of all affected parcels and
relocation of affected utilities. Staking activities shall be
Page 3 of 5
coordinated with the OWNER to provide at least two weeks lead
time for the OWNER to send letters to property owners.
5. The ENGINEER shall be responsible for all revisions to the
Transportation Project Plat and Right -of -Way Descriptions, until the
Transportation Project Plat is recorded with the County Register of
Deeds Office, unless specifically excluded by the contract. All
amendments or revisions to the recorded Transportation Project
Plat shall be made in accordance with Wisconsin Statute 84.095,
and the Transportation Project Plat Guidelines, as provided by the
OWNER.
6. The ENGINEER shall. forward_ the Transportation Project Plat to the
OWNER for review and approval. The OWNER will be responsible
for the recording of all Transportation Project Plats.
The schedule to perform the work is: Approximate Start: 1/15/09
Approximate Completion: 8/1/09
The lump sum fee for the work is:
Total MSA lump sum fee
$10,615.29 (Phase 2 Environmental Analysis
and Report)
$28,913.72(Transportation Project Plat)
$ 1,472.33(Storm sewer outfall design)
$ 4.158.02(2 additional Droaress meetinas)
$ 45,159.36
The actual cost not to exceed sub contract fee for the work is:
Total sub contract fees
(actual cost not to exceed)
TOTAL CONTRACT AMENDMENT
$ 2,740.00 (Geoprobe borings, sublet to Soil
Essentials, Ltd.)
$ 4,490.00 (Soil lab work, sublet to CT
Laboratories)
$8,500.00 (Title searches, sublet to Evans Title
Companies)
$15,730.00
$60,889.36
Authorization for the work described above shall amend the Agreement between MSA,
and OWNER. Any attachments or exhibits referenced in this Amendment are made
part of the Agreement. Payment for these services will be on a lump sum basis.
Page 4 of 5
Approval: MSA shall commence work on this project in accordance with your written
authorization. This authorization is acknowledged by signature of the authorized
representatives of the parties to this Amendment. A copy of this Amendment signed by
the authorized representatives shall be returned for our files. If a signed copy of this
Authorization is not received by MSA within seven days from the date of issuance, MSA
may stop work on the project.
SIGNED FOR AND IN BEHALF OF THE MSA PROFESSIONAL SERVICES, INC.
CITY OF OSHKOSH
Jl tl�m
Mark Rohloff, City Manager Michael J. Statz, P.E.
Project Manager
Peggy o, City Comptroller
hereby certify that the necessary provisions
have been made to pay the liability which will
accrue under this contract.
Address for giving notices:
215 Church Avenue
Oshkosh, WI 54903 -1130
Phone: (920) 236 -5065
Fax: (920) 236 -5068
Addresses for giving notices:
2901 International Lane, Suite 300
Madison, WI 53704 -3133
Phone: (608) 242 -7779
Fax: (608) 242 -5664
Page 5 of 5
Pamela R. Ubrig, City Clerk l
Consultant Contract Total Fee Computation
Project ID Original Contract CA #1
CA #2
CA #3
Total for Contract) `
Work Order
WORK ELEMENT
NAME OF SUBCONSULTANT
Pa ment
_ --
NumHourtsStaff
Streetsca a Architecture
! 2502 12
59
518
3091
Total Direct Labo' $68,884.09 $379:$0
$1,80156
_ $15,407:54
$86,475:09
Total Overhead;`
Geo robe Borin s
$108,409.78 $642.72
Costs
$2,920.15
$24,759.91
$136,732.56
Fixed Fee /Profit, $16,842.91 $97.15
$448.75
$3,815.91
$21,204.72
Eua'rs, Cane riles t
`NTF
$8,500.00
Direct Expensed $4,030.00 $25.00
$476.00
$1,176.00
$5,707.Q0'
Spg $5 95 Q0
$5,945.00
Hrstorteal
Coorctitratron $5 282 00' $5,406.00
$10,688.00
. _
�Subsrarface� " { '
$ 935 00;
lnvesUgatron
$1,935.00
g _.
Geoprol�e ; , i,
Qorrinc�s z :,',
$2,740.00
$2,740.00
>Sorl Lab Wo�[r',
$4,490.00
$4,490:00
7itle�'eechs
$8,500.00
$8,500.00`
TOTAL COST $211,328'.78 $6,550.77
1 $5,648.46;
$60,889.36
— $284,417:37
Negotiated Overhead Rate: 160.70% Percent Profit: 9.5%
157.38% for original contract
Schedule of Subcontracts
Method of
WORK ELEMENT
NAME OF SUBCONSULTANT
Pa ment
Subcontract Amount
Streetsca a Architecture
Historical Coordination
ti�xifa a Red ar�li Ltd _.,_
Ill- ,
Subsurface Investi
ation
Ir „rne7.r fosttn` nSerxrcos;,�nc `,, `
NTE. ,,
Geo robe Borin s
.ScY► ESe!�tls,..tck.., .,,._ -.
-�11 ,,...'
$2,740.00
Soil Lab Work
;.�s . < l .botatoFis..4 ;, .. tip_...
_ .... :NT ..
$4,490.00
Title Searches
Eua'rs, Cane riles t
`NTF
$8,500.00
$15,730.00
Contract Amendment #3.xls 1/30/2009
SOI ESSENTIALS
LTD
8 x 959, 'W6306 State Hwy 39
New Glarus, WV153574
Phone (608) 7 -2355 • Fax (608)527 -2794
Bid Proposal 05496A
November 10, 2008
MSA Professional Services, inc,
1230 South Boulevard
Baraboo, W1 53913
Dear Richard Lyster,
I understand M,SA Pro&ssional Services, Ina. (client) requests a bid proposal for Geopr services. T'i&een
probe holes to 12 feet debp with 45 soil samples and 15 water samples will be required ' City Segment,
Oshkosh, Wisconsin. The bid is as follows:
Mobilization
$ 300.00
Footage Charge
180 feet at $ 8.00 per foot
$ 1444.00
Sample Equipment & Misc.
Water saRVIes, 15 at $ 30,00 each
$ 450.00
WDM abandoment fames, 0 at $15.00 each
so
Concrete peneft46cns, 13 at $15.00 eaelt
S22$.00
Drains, 0 at $ 45.00 each
$ 0
Ind space.lan , 0 at $ 20.00 each
$ o
IwPVC, 0 feeet at $ 4.00 W :Foot
so
Per ddin, 1 night at $125.00 per night
$125.00
Road >s ( 6@48 ") aW Cones ( 24 ° )
$ 200.00
Total
S 2140.00
This bid is based on estimates needed for soil probing sexviccv, with one operator. The cli
actual amounts used. The MiniMM charge is $300. UWen otherwise
noted the Cunt wit
an and utility the 1a, contact and receive permission from all landowners; complete
forms; obtain any mW all .pa mits required for Geoprobe services and
provide all sample c
pre smative s, and labels for chemied analysis. Then owner of the property is re"nst le: f
wtd,ft round utilities.
Notts:
Thanit'Ym4
.David Paulson
Owner/ Operator/ Geologist
ut will be dkuVd
provide all
and file all IbNR
all owner ,waned
T L B f T 0 R I
delivering more than data from your environmental analyses
November 11, 2008
Submitted to:
Dick Lyster
MSA Professional Services
Baraboo, Wl
richardl @msa- ps.com
Submitted by:
Eric Korthals
CTLaboratories
1230 Lange Court
Baraboo, WI 53913
Re: Laboratory Services Price Quote: DOT North Main St Reconstruction, Fox River
Bridge to Irving St.
City Segment
Parameter
VOC (8260)
DRO (WI)
GRO (WI)
PVOC + Naphthalene or
GRO /PVOC + Naphthalene
Lead (60106)
Solids, %
Matrix Quantity Unit
Water or Soil 16 $ 75.00
Soil 30 $ 45.00
Soil 4 $ 30.00
Soil 26 $ 40.00
Water or Soil 42 $ 15.00
Soil 30 $ 5.00
Extended Price
$ 1,200.00
$1,350.00
$ 120.00
$1,040.00
$ 630.00
$ 150.00
TOTAL PROJECTED COSTS:
Quote is valid for 180 days from date prepared.
Etk/pdf 1msa /111008b.doc
$ 4,490.00
1230 Lange Court • Baraboo, WI 53913 . 608 -356 -2760
www.ctiaboratories.com
a
Y
ST AMERI
1. c -Y
4 ri �
0
330 W. COLLEGE AVENUE
P.O. BOX 1234
APPLETON, WI 54912 -1234
PH (920)735 -6000
FAX (920)735 -6006
December 23, 2008
Jason DiPiPiazza
MSA Professional Services Inc
2901 International Lane, Ste 300
Madison, WI 53704 -3133
Re: Quote for 60 year searches: North Main Street, Oshkosh / Project
4110 -16 -00
Dear Jason,
The quote for 60 year searches for approximately 34 -40 title searches is $250.00 each. Updates
will be $50.00. This is for properly along North Main Street, Oshkosh/Project 4110 -16 -00 (Fox River
Bridge - Irving Ave. - USH 45)
I estimate the work to be completed approximately 6 -8 weeks from the time of notification.
Thank you,
Mike Strick