HomeMy WebLinkAboutfluor bros fire dep renovation # 4CHANGE ORDER
PROJECT. Fire Department Renovation CHANGE ORDER NUMBER: 4
100 Court Street
Oshkosh, W1 54901 INITIATION DATE. 3 -20 -09
ARCHITECT'S PROJECT NUMBER: 08018
CONTRACT FOR: Construction Services
The Contract is changed as follows:
Oshkosh WI 54903
21. Change ceramic base to vinyl per change order dated 10 -2 -08
- $4,063.00
23. Change door frame for door 127E from left hand to right hand per change order dated 9 -25 -08
$312.90
25. Change wood doors from T -0" to 6' -8" per change order dated 9 -15 -08
$689.00
30B. Change existing kitchen sink faucet per change order dated 12 -1 -08
$1,015.38
32. Install 1 /2" oak strips on existing wood base per change order dated 11 -25 -08
$325.00
33. Install Simplex locks at east aluminum entrance and new garage door per change order dated 11 -25 -08
$1,291.40
35. Tuck pointing in stairway per change order dated 12 -11 -08
$1,770.78
36. Strip 14 interior doors and refinish, paint 19 metal door frames per change order dated 12 -15 -08
$1,633.80
37. Add unit heater in boiler room per change order dated 12 -17 -08
$3,293.00
39. Install Simplex lock west exit door and new closure on the hallway door per change order dated 1 -7 -09
$1,282.00
40. Provide structural engineering inspection services per change order dated 1 -7 -09
$1,138.01
41. Cap off drain line in medical room & add site drain on 2 flr. Per change order dated 1 -5 -09
$496.65
43. Paint behind existing locker per change order dated 11 -25 -08
$756.30
45. Replace door & frame to unisex bathroom on first floor per change order dated 11 -25 -08
$2,305.75
46. Install drain valves at existing booster coils per change order dated 11 -18 -08
$1,243.10
50. Replace the remaining ceiling grilles and diffusers per change order dated 10 -28 -08
$2,504.25
51. Install new stainless steel stack for existing water heater per change order dated 10 -24 -08
$1,748.25
54. Fill in door at room 106 per change order dated 9 -15 -08
$368.50
The original Contract Sum was ................................................................ ............................... $ 607,450.00
Net change by previously authorized Change Orders ......................... $100
The Contract Sum prior to this Change Order was ..................................... ............................... $707,910.73
The Contract Sum will be Increased by this Change Order .......................... ............................... $18,111.07
The new Contract Sum including this Change Order will be ........................ ............................... $726,021.80
The Contract Time will be (increased) (decreased) (unchanged) by # days. Unchanged
The Date of Substantial Completion as of the date of this Change order therefore is .................. Unchanged
This Change Order is not valid until signed by the Owner, Contractor and Architect.
Signature indicates agreement herewith, including any adjustment in the Contract Sum or Contract Time.
ARCHITECT.
AEC Architects /Engineers /Const.
Mgrs, LLC
P.O. Box 40
OWNER:
City of Oshkosh
215 Church Ave.
Oshkosh, WI 54901
CONTRACTOR:
Fluor Bros. Construction
Winnebacio, WI
PRINTED NAME
William A. Aubrey
203 Otter Avenue
BY: � � BY G e
PRINT D E' �PR�N ME:
DATE: 3r 2 DATE: /1 "1 DATE: i�`� �/� 7
October 2, 2008
Bill Aubrey
AEC
Oshkosh, WI. 54901
Re; Credits Oshkosh Fire Department (2co -�t %
Bill
These are the credits on changing the floor base that was quoted form ceramic to
vinyl base as requested. We also have a credit on the lights fixtures for sleepy
area. If you have nay questions, please give me a call.
Macco's Flooring -------------- _ ----- $2,805.00
Solar Electric-------- - - - - -- $1,25
Total about for credit-------- --C-'- '$4,063.00
Sincerely
Richard Paulsen
President
September 25, 2008
Bill Aubrey
AEC
Oshkosh, WI. 54901
Re; quotes for extra work Oshkosh Fire Department C.O. 23
Bill
This quote is for changing the door frame for door 127E from left hand to right
hand. There will be no cost for door.
LA force hardware --------------------- $298.00
Mark up ---------------------------- - - ----- $14.90
Total- ---- ----------- ....._- ..--------- - - - - -- $31290
Sincerely
Richard Paulsen
President
September 15, 2008
Bill Aubrey
AEC
Oshkosh, WI. 54901
Re; quotes for extra work Oshkosh Fire Department C.O 25 .
Bill
I called La Force about the door frames. They said there is no problem changing
out the wood doors. The frames will be an extra. There will be no mark up on this.
.Let me know if you want me to proceed with the change.
La force Hardware--- --- - -- $689.00
Sincerely
Richard Paulsen
President
December 1, 2008
Bill Aubrey
AEC
Oshkosh, WI. 54901
Re; quotes for extra work Oshkosh Fire Department C. 0. 3 O l e?
Bill
This is the cost breakdown for changing the existing faucet in the four
compartment sink in the kitchen. We are going to install new Chicago faucet with
a 12" spout with an overhead spray attachment.
Jims Plumbing------------------------------- - - - - -- $837.
Fluor- ----- - ------ — ---- — ------------------ ---- — - $65.00
Sub total- ----------------- - - - - -- -------- — -------- $967.00
Markup ------- -------------- — ------ — ------- — ----- $48,38
Total---------------------------------------- - - - - -- $1, 8
Sincerely
Richard Paulsen
President
November 25, 2008
Bill Aubrey
AEC
Oshkosh, WI. 54902
Re; quotes for extra work Oshkosh Fire Department C.O.32
Bill
This is the price to install 1 /2 oak strips on the existing base board in the sleepy
area to even out vinyl base. The price for this work is $325.00.
Sincerely
Richard Paulsen
President
November 25, 2008
Bill Aubrey
AEC
Oshkosh, WI. 54901
Re; quotes for extra work Oshkosh Fire Department C.O. 33
Bill
This is the cost to install new Simplex locks in the east Aluminum Entrance door
and also one new simplex lock in the new garage door. If you have any questions,
please give me call.
La force- ---------------- .. -------- $849.00
Fl ------- w ------ - - -------------- $ 325.00
Sub total- ------------- - - - - -_ - $1174.00
Mark up -------- - .. --- -- ---------- -- $117.40
Total ------------------------------ $1,291.40
Sincerely
Richard Paulsen
President
December 11, 2008
Tim Franz
Oshkosh Fire Department
Oshkosh, WI. 54901
Re; quotes for extra work Oshkosh Fire Department C.O.35
Tim
This is the cost for tuck pointing the stairway and the west wall in the Garage
area.
L -- --------------- - - -$ 527.50
Material caulking material and mortar- - - - - -- $82.30
Sub total- ------------- _--------------- _-.. -- $1,609.8
Mark up ------------------------------ ---------- $160.98
Total- ---- - - - - -- ----- _------------ .- .-- - - - - -- $ 1,770.78
Sincerely
Richard Paulsen
President
December 15, 2008
Tim Franz
Oshkosh Fire Department
Oshkosh, WI. 54901
Re, quotes for extra work Oshkosh Fire Department C.O.36
Tim
This is the price to strip 14 interior doors and stain and varnish and also to paint
18 metal door frames. If you have any questions, please give me a call.
Best Ever ---- ------------- $1,426.00
Fluor------------------- - - - - -- $130.00
Markup --------- — ------------ $77.80
Total ----------------------- $1,633.80
Sincerely
Richard Paulsen
President
December 17, 2008
Tim Franz
Oshkosh Fire Department
Oshkosh, WI. 54901
Re; quotes for extra work Oshkosh Fire Department C.O 37
Tim
This is the proposal to add a unit heater, controls, piping insulation and
electrical for the boiler room, If you have any questions, please give me a calla
Tower Mechanical----- -- -- ---- $2,
Solar ------------- _ --- _ ------------- $250.00
Fluor ---- - .. --------------- — ---------- $130.00
Sub total --------- a ---------------- $3,130.00
Markup - -_ ----------- ----- - - - - -- $163.00
Total ---- _.--- �___ - -_ -- __ ----- $3,293.00
Sincerely
Richard Paulsen
President
January 7, 200X I
Tim Franz
Oshkosh Fire Department
Oshkosh, WI. 54901
Re; quotes for extra work Oshkosh Fire Department C.O 39
Tim
This is the cost to furnish and install one new simplex lock on the west exit door
and a new closure on the hallway door. If you have any questions, please give me
a call.
Lockset and closure ----------- $841.00
Labor to install --------------- -- $325.00
Sub total ---------------------- $1,166.00
Mark up ---------------------- -- $116.60
Total— --- --------------------- $1,282.00
Sincerely
Richard Paulsen
President
January 7, 20(A
Tim Franz
Oshkosh Fire Department
Oshkosh, WI, 54901
Re; quotes for extra work Oshkosh Fire Department C.O. ##40
Tim
This is the cost to have a structural engineer come to the site to investigate the
structural movement. We also were given crack monitors to install and install new
backer rod and caulking. If you have any questions, please give me a call
Larson Engineering-- - - - - -- material and labor ------------- $597.61
Fluor material and installation -------------- _-- ----------- $455.00
Subtotal ------------------------------------------------------ $1034.61
Markup ----------- — ------------ _------------------ ----------- $103.40
Total--------------------------------------------------- - - - - -- -$1,13 8.01
Sincerely
Richard Paulsen
President
January 5, 200)' 0 1
Tim Franz
Oshkosh Fire Department
Oshkosh, WI. 54901
Re; quotes for extra work Oshkosh Fire Department C.O.41
Tim
These are the extras to cap of the drain and water line in Medical Room and
HVAC additional site drain for the unit up stairs.
Medical room work ------ - - ----- $192.00
Site drain for HVAC unit - - - - -- $ 206.00
Fluor ------------ - .. ---- _ ----------- $75.00
Sub total ------ -- ---- -- ----------- $473.00
Markup ------------------------- .....$23.65
Total ---------- _ ----------------- $ 496.65
Sincerely
Richard Paulsen
President
November 25, 2008
Bill Aubrey
AEC
Oshkosh, WI. 54901
Re; quotes for extra work Oshkosh Fire Department C.O.43
Bill
This is the quote to paint behind all the Iockers in the garage bay. The city is
taking the lockers out. The painters will block fill and plug the holes in the wall.
Fluor will patch the nail holes in the floor. The city has not decided what they
want to coat the floor with at this time.
Best Ever painting -------- -- ---- -- ---- - - ----- $538.00
Fluor------------------------------------------- $174.00
Sub total-------------------------------------- $712.00
Mark up ----------------------------------------- $44.30
T o t a l ---------------- -------------------------- $756.30
Sincerely
Richard Paulsen
President
November 25, 2008
Bill Aubrey
AEC
Oshkosh, Wl. 54901
Re; quotes for extra work Oshkosh Fire Department C.O.45
Bill
This is the break down to furnish and install a new door and frame to the lower
bathroom to make it ADA accessible.
La Force --- -door, frame, new grill and hardware ------ - - ----- $965.00
Fluor — demo out old door and install new and hardware - - -- $780.00
Komorowski patch in drywall- ----------- ..--------------- - - - - -- $150.00
Best Ever Painting- stain and varnish ---------------------------- $75.00
Solar to move switch --------------- --------------- _- _- _ ------- -- $150.00
Subtotal ---------------------------------------------------------- $2,120.00
Markup ---------------------------- - .. --------- — ------------------ -- $185.50
Total_ --- ..------------- - - - --- ------- -- ---- --_--- __- ____- __- - - - - -- $2,305.75
Sincerely
Richard Paulsen
President
November 18, 2008
Bill Aubrey
AEC
Oshkosh, WI. 54901
Re; quotes for extra work Oshkosh Fire Department C.O.46
Bill
This is the proposal to install drain valves at the existing booster coils. Currently
there is no drains at these coils so they can not be flushed properly to remove
contaminates from the existing piping system. This is a good way to keep your
system clean.
Tower ----------------- $1006.00
Fluor ------- -- --------- _- $65.00
Sub total ------------ -- $1136.00
Mark up ---------------- $107.10
Total ------------- r--- -- $1,243.10
Sincerely
Richard Paulsen
President
October 28, 2008
Bill Aubrey
AEC
Oshkosh, WI. 54901
Re; quotes for extra work Oshkosh Fire Department C.O. 50
Bill
This is the quote to furnish the remaining grilles and diffusers in the ceilings as
requested. If you have any questions, please give me a call
Tower Mechanical- - - - - -- $2,320.00
Fluor ------------ _ ------------ $65.00 ,
Sub total ------- ---- -------- $2,385.0
Mark up ------------------ —_ $119.25
Total ---- -. — ---------- -- -,.$2, 504.25
Sincerely
Richard Paulsen
President
October 24, 2008
Bill Aubrey
AEC
Oshkosh, WI. 54901
Re; quotes for extra work Oshkosh Fire Department C.O. 51
This is the change order to install a new Stainless steel stack for the existing hot
water heater in the basement.
Tower Mechanical------------------ - - - - -- $ 1600 . 00
Fluor - - - -- ------------------------------- - - - - -- $65.00
Sub total------------------------------ - - - - -- $ 1665 . 00
Mark up--------- ---------- .--------- - - - - -- $ 83 . 25
T - - - - -- $1,748.25
Sincerely
Richard Paulsen
President
a �
September 15, 2008
Bill Aubrey
AEC
Oshkosh, WI. 54901
Re; quotes for extra work Oshkosh Fire Department C.O.54
Bill
This is the proposal to fill in one door in room 106 Office. This is the cost to stud
up and drywall. We will assume that the office and corridor is getting changed to
with paint and wallpaper. If not, we will have to add to this price for the
difference.
Demo out door ------------- - - --- $60.00
Reinstall old door and trim - - -- $275.00
Sub Total -------------------------- $335.00
Mark up ---------------------------- $33.50
Total ------- -- __-- ------------ - - -$3 68.50
Sincerely
Richard Paulsen
President