Loading...
HomeMy WebLinkAboutfluor bros fire dep renovation #2F ...._ CHANGE ORDER PROJECT: Fire Department Renovation CHANGE ORDER NUMBER: 2 - Revised 100 Court Street Oshkosh, WI 54901 INITIATION DATE: 3 -19 -09 ARCHITECT'S PROJECT NUMBER: 08018 CONTRACT FOR: Construction Services The Contract is changed as follows: 28. Install insulation over vestibules per change order dated 10 -31 -08 $341.24 29. Additional plumbing changes per the city inspection & change order dated 11 -10 -08 $2,047.50 30A. Change paint type for apparatus bay due to rusting of deck & change in vinyl wall covering per CO date - $247.00 11 -10 -08 49. Changes in ceramic tile per change order dated 11 -10 -08 $98.70 56. Add outlets and data lines per change order dated 10 -17 -08 $1,298.00 T original Contract Sum was ........................................................ . $ 607,450.00 N change by previously authorized Change Orders ................................. ............................... $60,170.44 The Contract Sum prior to this Change Order was ..................................... ............................... $ 667,620.44 The Contract Sum will be Increased by this Change Order .......................... ............................... $3,538.44 The new Contract Sum including this Change Order will be ........................ ............................... $671,158.88 The Contract Time will be (increased) (decreased) (unchanged) by # days. Unchanged The Date of Substantial Completion as of the date of this Change order therefore is .................. Unchanged This Change Order is not valid until signed by the Owner, Contractor and Architect. Signature indicates agreement herewith, including any adjustment in the Contract Sum or Contract Time. ARCHITECT: AEC Architects /Engineers /Construction Managers, LLC 5 Po Leo r1_ Anil /AAA BY PRINTED NAME: William A. Aubrey DATE. OWNER: City of Oshkosh 215 Church Ave. "VY Oshkosh, WI 54901 CONTRACTOR: Fluor Bros. Construction 203 Otter Avenue Oshkosh WI 54903 BY PRINTED NAME: / (, P51NIIED NAME: , md DATE: &I D DATE: Z? October 31, 2008 Bill Aubrey AEC Oshkosh, WI, 54901 Re; quotes for extra work, Oshkosh Fire Department C. 0.28 Bill This is the change order to furnish and install batt insulation above the both vestibules. If you have any questions, please give me a call Noffkees ------------------------ $180.22 Labor to install ----------------- $130.00 Sub total------ - - - - -- ---- - - - - -- $310.22 Mark up ---------------- — ---- --- $31.02 Total- -------------------- - --..- _$ 341.24 Sincerely Richard Paulsen President November 10 2008 Bill Aubrey AEC Oshkosh, WI. 54901 Re; quotes for extra work Oshkosh Fire Department C.O.29 Bill As the plumbing inspector went through the building last week he found violations. One is the way the automatic clothes washer is hook up and the other is to cut and cap 1 I /2 " copper line in basement. Jeff and Tim both agreed to go ahead with these items. Install new plumbing to washer --------- --- $1,766.00 Cut and cap 1 r /2" water line ------------------ $ 184.00 Sub total -------------------- ------ -------------- $1950.00 Markup ---------------------------- --------------- $97.50 Total ------------- ---- _ ------------------ ----- $ 2, 047.50 Sincerely Richard Paulsen President November 10, 2008 Bill Aubrey AEC Oshkosh, WI. 54901 Re; quotes for extra work Oshkosh Fire Department Bill The dry fog that is called out for in the specs to will not work because of all the rust we found under the drop ceiling. The painter recommends to go with an oil base epoxy dryfall that would ahere to the rusty decking material. We have a credit coming on the wall paper of- - - - - -- $1,914.00 Cost of original dryfog material is----------------- - - - - -- $612.00 Cost of oil based epoxy is ------------------------------- $2,279.00 Credit for this change order is ------------------------- w--- $247.00 9EOU" Sincerely Richard Paulsen President November 10, 2008 Bill Aubrey AEC Oshkosh, WI. 54901 Re; quotes for extra work Oshkosh Fire Department C.O.49 Bill These are a couple of the extras that we have talked over with Tim and Jeff. One is to change add bull nose to the masonry return at the top of the stairs by bathroom, The second is to add some 2x2 tile at the slop sink in the upper bath room, Sink backsplash ---------------------- $94.00 Markup --------------------------------- $4.70 Total ------- — -------------- — --------- $98.70 Sincerely Richard Paulsen President October 17, 2008 Bill Aubrey AEC Oshkosh, WI. 54901 Re; quotes for extra work Oshkosh Fire Department C,O.5b Bill This is the break down for adding outlets in sleepy room, data line, conduits and wire. If you have any questions, please give me a call. Solar --- ------------- -- --- — ------ $ 1,100.00 Fluor ------------------ __ ----------- $13 0.00 Sub total ----------- - .. ---- _.. -__ - -- $1230.00 Mark up ---------------- __ ----------- $68.00 Total- ------- __------ _- ___ --- _$1,298.00 Sincerely Richard Paulsen President