HomeMy WebLinkAboutfluor bros fire dep renovation #2F ...._ CHANGE ORDER
PROJECT: Fire Department Renovation CHANGE ORDER NUMBER: 2 - Revised
100 Court Street
Oshkosh, WI 54901 INITIATION DATE: 3 -19 -09
ARCHITECT'S PROJECT NUMBER: 08018
CONTRACT FOR: Construction Services
The Contract is changed as follows:
28. Install insulation over vestibules per change order dated 10 -31 -08 $341.24
29. Additional plumbing changes per the city inspection & change order dated 11 -10 -08 $2,047.50
30A. Change paint type for apparatus bay due to rusting of deck & change in vinyl wall covering per CO date - $247.00
11 -10 -08
49. Changes in ceramic tile per change order dated 11 -10 -08 $98.70
56. Add outlets and data lines per change order dated 10 -17 -08 $1,298.00
T original Contract Sum was ........................................................ . $ 607,450.00
N change by previously authorized Change Orders ................................. ............................... $60,170.44
The Contract Sum prior to this Change Order was ..................................... ............................... $ 667,620.44
The Contract Sum will be Increased by this Change Order .......................... ............................... $3,538.44
The new Contract Sum including this Change Order will be ........................ ............................... $671,158.88
The Contract Time will be (increased) (decreased) (unchanged) by # days. Unchanged
The Date of Substantial Completion as of the date of this Change order therefore is .................. Unchanged
This Change Order is not valid until signed by the Owner, Contractor and Architect.
Signature indicates agreement herewith, including any adjustment in the Contract Sum or Contract Time.
ARCHITECT:
AEC
Architects /Engineers /Construction
Managers, LLC
5 Po Leo
r1_ Anil /AAA
BY
PRINTED NAME:
William A. Aubrey
DATE.
OWNER:
City of Oshkosh
215 Church Ave.
"VY Oshkosh, WI 54901
CONTRACTOR:
Fluor Bros. Construction
203 Otter Avenue
Oshkosh WI 54903
BY
PRINTED NAME: / (, P51NIIED NAME: ,
md
DATE: &I D
DATE: Z?
October 31, 2008
Bill Aubrey
AEC
Oshkosh, WI, 54901
Re; quotes for extra work, Oshkosh Fire Department C. 0.28
Bill
This is the change order to furnish and install batt insulation above the both
vestibules. If you have any questions, please give me a call
Noffkees ------------------------ $180.22
Labor to install ----------------- $130.00
Sub total------ - - - - -- ---- - - - - -- $310.22
Mark up ---------------- — ---- --- $31.02
Total- -------------------- - --..- _$ 341.24
Sincerely
Richard Paulsen
President
November 10 2008
Bill Aubrey
AEC
Oshkosh, WI. 54901
Re; quotes for extra work Oshkosh Fire Department C.O.29
Bill
As the plumbing inspector went through the building last week he found
violations. One is the way the automatic clothes washer is hook up and the other
is to cut and cap 1 I /2 " copper line in basement.
Jeff and Tim both agreed to go ahead with these items.
Install new plumbing to washer --------- --- $1,766.00
Cut and cap 1 r /2" water line ------------------ $ 184.00
Sub total -------------------- ------ -------------- $1950.00
Markup ---------------------------- --------------- $97.50
Total ------------- ---- _ ------------------ ----- $ 2, 047.50
Sincerely
Richard Paulsen
President
November 10, 2008
Bill Aubrey
AEC
Oshkosh, WI. 54901
Re; quotes for extra work Oshkosh Fire Department
Bill
The dry fog that is called out for in the specs to will not work because of all the
rust we found under the drop ceiling. The painter recommends to go with an oil
base epoxy dryfall that would ahere to the rusty decking material.
We have a credit coming on the wall paper of- - - - - -- $1,914.00
Cost of original dryfog material is----------------- - - - - -- $612.00
Cost of oil based epoxy is ------------------------------- $2,279.00
Credit for this change order is ------------------------- w--- $247.00 9EOU"
Sincerely
Richard Paulsen
President
November 10, 2008
Bill Aubrey
AEC
Oshkosh, WI. 54901
Re; quotes for extra work Oshkosh Fire Department C.O.49
Bill
These are a couple of the extras that we have talked over with Tim and Jeff. One
is to change add bull nose to the masonry return at the top of the stairs by
bathroom, The second is to add some 2x2 tile at the slop sink in the upper bath
room,
Sink backsplash ---------------------- $94.00
Markup --------------------------------- $4.70
Total ------- — -------------- — --------- $98.70
Sincerely
Richard Paulsen
President
October 17, 2008
Bill Aubrey
AEC
Oshkosh, WI. 54901
Re; quotes for extra work Oshkosh Fire Department C,O.5b
Bill
This is the break down for adding outlets in sleepy room, data line, conduits and
wire. If you have any questions, please give me a call.
Solar --- ------------- -- --- — ------ $ 1,100.00
Fluor ------------------ __ ----------- $13 0.00
Sub total ----------- - .. ---- _.. -__ - -- $1230.00
Mark up ---------------- __ ----------- $68.00
Total- ------- __------ _- ___ --- _$1,298.00
Sincerely
Richard Paulsen
President