Loading...
HomeMy WebLinkAboutfluor bros fire dep renovation #1RiTI PT- PROJECT: Fire Department Renovation 100 Court Street Oshkosh, WI 54901 The Contract is changed as follows: CHANGE ORDER NUMBER: INITIATION DATE: ARCHITECT CONTRACT 1. New exterior soffit lighting per change order dated 7 -29 -08 2. Replace wall paper in existing first floor corridors per change order dated 8 -13 -08 3. Fill in door in office 123 per change order dated 8 -26 -08 4. New suspended ceilings per change order dated 8 -13 -08 5. Repaint existing rooms per change order dated 8 -20 -08 6. Replace existing kitchen cabinets per change order dated 8 -13 -08 7. Replace existing ceiling fans in apparatus bay per change order dated 8 -13 -08 The original Contract Sum was ................................................................ ............................... Net change by previously authorized Change Orders ................................. ............................... The Contract Sum prior to this Change Order was ..................................... ............................... The Contract Sum will be Increased by this Change Order .......................... ............................... The new Contract Sum including this Change Order will be ........................ ............................... The Contract Time will be (increased) (decreased) (unchanged) by # days. The Date of Substantial Completion as of the date of this Change order therefore is .................. 1 - Revised 3 -19 -09 08018 )n Services $11,854.00 $9,043.65 $332.75 $14,712.90 $4,107.50 $15,573.14 $4,546.50 $ 607,450.00 $ 0.00 $ 607,450.00 $ 60,170.44 $ 667,620.44 Unchanged Unchanged This Change Order is not valid until signed by the Owner, Contractor and Architect. Signature indicates agreement herewith, including any adjustment in the Contract Sum or Contract Time. ARCHITECT: AEC Architects /Engineers /Construction Managers, LLC 5703 County Road A Oshkosh, WI 54,901_ PRINTED NAM William A. Aubre DATE: 1"'m -C6 OWNER: CONTRACTOR: City of Oshkosh Fluor Bros. Construction 215 Church Ave. 203 Otter Avenue Oshkosh, WI 54901 Oshkosh WI 54903 BY: BY: �� �.� �,!��.- i PRINTED NAME PRLt4TED NAME: O R l DATE: q Ix 10 1 DATE: 3 .- - 2- 3 — 0 - July 29, 2008 Bill Aubrey AEC Oshkosh, WI. 54901 Re; quotes for extra work Oshkosh Fire Department C.O. #1 Bill This is the proposal for new 16 recessed incandescent down lights and two fluorescents light under canopies. Fluor will have to cut in new squares in overhangs for new lights. If you have any questions, please give me a call Materials------- - - - - -- $6300.00 Solar labor ----------- $3900.00 , Fluor labor ----------- $1040.00 Sub total --------- - -- $11,240.00 Mark up ---------------- $614.00 Total ------------ --- -- $11,854.00 Sincerely U Richard Paulsen President 5 . August 13, 2008 Bill Aubrey AEC Oshkosh, WI, 54901 Re; quotes for extra work Oshkosh Fire Department C. 0. #2 Bill He is the break down for changing out the existing wallpaper in the main corridor. We have a $35.00 per yard included in this bid. If you have any questions, please give me a call. Best Ever Painting ----------- -- ---- -- $8,613.00 Mark up -------------------------- M ----- $430.65 Total ------- -- -------------------------- $9,043.65 Sincerely Richard Paulsen President August 26, 2008 Bill Aubrey AEC Oshkosh, WI. 54901 Re; quotes for extra work Oshkosh Fire Department C.O. 3 Bill This is the proposal to fill in one door in room 123 Office. This is the cost to stud up and drywall. We will assume that the office and corridor is getting changed to with paint and wallpaper. If not, we will have to add to this price for the difference. Komoroski-- .. ----- — ------- $275.00 Demo out door -------------- $40.00 Mark up ----------- - ., --------- $ 17.75 Total-------------- ---- - - - - -- $332.75 Sincerely Richard Paulsen President July 29, 2008 Bill Aubrey AEC Oshkosh, WI, 54901 Re; quotes for extra work Oshkosh Fire Department C.O. 4 Bill This is the proposal for adding new ceilings in the lower offices, stairwells and lounge on second floor. If you have any questions, please give me a call Great Lakes Ceilings --------------- - $10,718.00 Fluor demo ----------------------------- $1,980.00 Solar ---------------- _ ------------------- $1,220.00 Sub total ------------------------------- $13,918.00 Mark up----------------------------------- $794.90 Total ----------------------------------- $14,712.90 Sincerely Richard Paulsen President October 2, 2008 Bill Aubrey AEC Oshkosh, WI. 54901 Re; quotes for extra. work Oshkosh Fire Department C.O. 5 Bill This is the break down for room 206. We will remove and replace carpet, remove paneling, add drywall to north and east wall, tape walls, paint all walls and add oak trim around doorway. Fluor— ------------------ ---- ------- -- ---- $650.00 Komorowski------ _--------------------- $725.00 Best Ever Painting ----------------- -- $1,019.00 Solar Electric ----------------- ---------- $100.00 Maccos Flooring ---------------- - - - - -- $1;356.00 Sub total- --------------- w - - - -- __ - - -- $ 3,850.00 Mark up ----------- -- --------------------- $257.50 Total- ---------- ------- -- ,.--- - - - - -_ - $ 4,107.50 Sincerely Richard Paulsen President August 13, 2008 Bill Aubrey AEC Oshkosh, WI. 54901 Re; quotes for extra work Oshkosh Fire Department C,O. 6 Bill This is the cost break down for changing out the existing kitchen cabinets with laminate finishes and heavy-duty hardware. If you have any questions, please give me a call CLS Cabinetry ---- — --- — ---- — ---- — -- $ 12,647,34 Fluor to install- -- — ------ --------------- $2085-00 Subtotal--------------------------- ---- - -$14, 732.34 Mark up ------- -- - - — --------- ----- - - - - -- -$840 Total---- ------------------------------- - -$15, 573.14 Sincerely Richard Paulsen President August 13, 2008 Bill Aubrey AEC Oshkosh, WI. 54901 Re, quotes for extra work Oshkosh Fire Department C. 0. #7 Bill This is the proposal as requested to furnish and install 10 new ceiling fans and to add new conduits with 3- speed controls. These fans will have a five- year warranty Solar Elecrtric ------------------------ $4,330.00 Mark up ------------ --- ---------------- $216.50 Total-------------------------------- - - -$4 Sincerely Richard Paulsen President