HomeMy WebLinkAboutradtke contractors contract 07-01 #1CHANGE ORDER # 1
DATED: July 11, 2008
TO: Radtke Contractors Inc.
6408 Cross Road
Winneconne, WI 54986
Your present contract with the City of Oshkosh, Contract No. 07 - , is hereby amended
and changed as follows:
NET DECREASE TO: CONTRACT 07 -01 - BALDWIN DETENTION BASIN ($308.47)
NET DECREASE TO CONTRACT 07 -01
Recommended:
d, c C 4
Director of Pubic Works
($308.47)
131
Approved and accepted:
Contractor
Cr -IrrF OpfkA- r...,v o•= r-sc4/L
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
Comptroller
Approd as to form
3 Y
ity Att� j
CITY OF OSHKOSH
CONTRACT: 07 -01 BALDWIN DETENTION BASIN - CHANGE ORDER # 1
CONTRACT 07 -01 - BALDWIN DETENTION BASIN
100.
Approx. 30 square yards of
INCREASE IN
DECREASE IN
ITEM
DESCRIPTION
CONTRACT
INSTALLED
NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
pavement, with base,
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
100.
Approx. 30 square yards of
3 %" asphaltic concrete
pavement, with base,
complete as specified, per
square yard
30.00
33.60
3.60
$20.00
$72.00
101.
Furnish and install approx.
48 linear feet of 24" RCP
Class III Storm Sewer,
complete as specified, per
-
linear foot
48.00
48.00
$90.00
102.
Furnish and install approx.
30 linear feet of 48" x 76"
HERCP Class III Storm
Sewer, complete as
specified, per linear foot
30.00
30.00
$400.00
103.
Furnish and install 24"
Class III Apron Endwall
with Trash Rack at one (1)
location, complete as
s ecified, each
1.00
1.00
1
$1,500.00
104.
Furnish and install 48" x
76" HERCP Class III Apron
Endwall with Trash Rack at
one (1) location, complete
as specified, each
1.00
1.00
$7,500.00
105.
Furnish and install
materials to construct
Baldwin Pond Discharge
Chamber (including
Tideflex), complete as
s ecified, lump sum
1.00
1.00
1 $30,000.00
106.
Abandon approx. 110 lineal
feet of 30" storm sewer,
completed as specified, per
linear foot
110.00
110.00
$45.00
107.
Clear approx. 302 inch -
diameter of existing trees
for excavation of Baldwin
Pond, per inch - diameter
302.00
228.20
-73.80
$4.97
$366.56
108.
Grub approx. 302 inch -
diameter of existing stumps
for excavation of Baldwin
Pond, per inch - diameter
302.001
299.29___L_
-2.80
$4.97
$13.91
109.
Excavate and grade
Baldwin Pond, lump sum
1.00
1.00
$44,100.00
Page 2
CONTRACT: 07 -01 BALDWIN DETENTION BASIN - CHANGE ORDER # 1
ITEM
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
PRICE
CONTRACT
PRICE
110.
Furnish and install approx.
787 linear feet of cast -in-
place Retaining Wall, per
linear foot
787.00
787.00
$114.36
111.
Plant and seed Baldwin
Pond, lump sum
1.00
1.00
$20,000.00
112.
Provide $700.00 to the City
of Oshkosh for project
management
communications, complete
as specified, lump sum
1.001
1.00
1
1
1 $700.00
BID ITEMS 100 -112 - SUB - TOTALS $72.00 ($380.47)
NET DECREASE TO: CONTRACT 07 -01 ($308.47)
Page 3