HomeMy WebLinkAboutrlam contract 08-14 #1F�az CHANGE ORDER # 1 DATED: January 13, 2009 TO: RLAM, Inc. 1110 Dartford Rd Ripon, WI 54971 Your present contract with the City of Oshkosh, Contract No. 08 -14 , is hereby amended and changed as follows: NET INCREASE TO: SECTION I - ASHPALT PAVING $10,226.17 NET INCREASE TO: SECTION II - STORM SEWER $75.00 NET INCREASE TO CONTRACT: $10,301.17 CITY OF OSHKOSH,,. BY: Recommended: City Manager C. Director of Public Works City Clerk Approved and accepted: Contractor i I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order: Comptroller Ap ved as to form City At 4 SECTION I - ASHPALT PAVING CONTRACT: 08 -14 _CHANGE ORDER # 1 100 Sidewalk and driveway INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER specified Feet QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 100 Sidewalk and driveway removal, complete as Square specified Feet 2,100 726.00 - 1,374.00 $0.50 ($687.00 101 Excavation, complete as Cubic specified Yards 2,530 2,636.00 106.00 $14.00 $1,484.00 102 Asphaltic concrete pavement, lower layer, Complete asspecified Tons 750 723.00 -27.00 $75.75 $2,045.25) 103 Asphaltic concrete pavement, upper layer, complete asspecified Tons 560 663.00 103.00 $78.00 $8,034.00 104 Tack or prime coat, complete asspecified Gallon 130 150.00 20.00 $3.501 $70.00 105 6" concrete sidewalk & driveway, complete as Square specified Feet 800 866.20 66.20 $5.80 $383.96 106 Furnish and install crushed stone base course, complete as specified Tons 3,030 3,432.00 402.00 $8.65 $3,477.30 Sawing, complete as Linear $2.25 107 specified Feet 640 675.00 35.00 $78.75 108 Adjust manholes and inlets, complete as specified Each 10 14.00 4.00 $350.00 $1,400.00 109 Remove trees and stumps, complete as specified inch Diameter 160 87.00 -73.00 $22.00 ($1,606.00) 110 Furnish and install trees, complete asspecified Each. 7 4.00 -3.00 $280.00 ($840.00) 111 Preparation of foundation for asphalt paving on alley north of Catherine Avenue (Punhoqua Street to Rainbow Drive, complete Lump asspecified Sum 1 1 1.00 $2,800.00 112 Preparation of foundation for asphalt paving on alley south of Catherine Avenue (N. Eagle Street to Fox Street), complete as Lump specified Sum I 1 1.00 $3,500.00 113 Preparation of foundation for asphalt north of Oshkosh Avenue (N. Eagle Street to Rainbow Drive), complete as specified Lump Sum 1 1.00 $5,450.00 114 Terrace work on alley north of Catherine Avenue (Punhoqua Street to Rainbow Drive), complete Lump as specified Sum 1 1.00 $1,650._00 Page 1 CONTRACT: 08 -14 CHANGE ORDER # 1 ITEM Furnish and install 12" UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 115 Terrace work on alley Linear QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE south of Catherine Avenue Feet 1,000 1,002.00 2.00 $40.00 $80.00 201 (N. Eagle Street to Fox Street), complete as Lump specified Sum 1 1.00 $3,000.00 116 Terrace work on alley north of Oshkosh Avenue (N. Each 7 7.00 $900.00 202 Eagle Street to Rainbow Drive), complete as Lump specified Sum 1 1.00 $3,000.00 117 Provide and install metal Vertical detectable warning plates, Feet 9.20 9.55 0.35 $400.00 $140.00 203 complete as specified Square complete as specified Feet 8 8.00 $50.00 SECTION 1- (BID ITEMS 100 -117) - SUB - TOTALS $14,928.01 ($5,178.25) ADDITIONAL WORK REQUIRED: C.O. # 1 SECTION 1 118 Provide and install high - early strength 6 "concrete Square sidewalk I Feet 866.20 1 866.20 $0.55 $476.41 ADDITIONAL WORK: C.O. # 1 - (ITEMS 206) - SUB -TOTAL $476.41 $0.00 NET INCREASE TO: SECTION I - $10,226.17 SECTION II STORM SEWER Furnish and install 12" INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER complete as specified Linear QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 118 Provide and install high - early strength 6 "concrete Square sidewalk I Feet 866.20 1 866.20 $0.55 $476.41 ADDITIONAL WORK: C.O. # 1 - (ITEMS 206) - SUB -TOTAL $476.41 $0.00 NET INCREASE TO: SECTION I - $10,226.17 SECTION II STORM SEWER 200 Furnish and install 12" INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER complete as specified Linear QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 200 Furnish and install 12" RCP Class III storm sewer, complete as specified Linear Feet 1,000 1,002.00 2.00 $40.00 $80.00 201 Furnish and install std. type 1 inlet (30" inside diameter with 18" sump) without casting, complete as , specified Each 7 7.00 $900.00 202 Furnish and install std. storm manhole (4' inside diameter) in 3 locations, without casting, complete Vertical ass specified Feet 9.20 9.55 0.35 $400.00 $140.00 203 Abandon 10" storm sewer, complete as specified Linear _..Feet _ _ .... 555;. 555.00 _ ... $10.00 _. Page 2 CONTRACT: 08 -14 CHANGE ORDER # 1 SECTION II - (BID ITEMS 200 - 205) - SUB- TOTALS $220.00 ($860.00) ADDITIONAL WORK.REQUIRED: C.O. # 1 - SECTION II ADDITIONAL WORK: C.O. # 1 - (ITEMS 206) - SUB -TOTAL $715.00 $0.00 NET INCREASE TO: SECTION II - $75.00 NET INCREASE TO SECTIONS I, II $16,339.42 NET DECREASE TO SECTIONS i, II ($6,038.25) INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT QUANTITIES INSTALLED QUANTITIES NET INCREASE NET DECREASE COSTPER UNIT CONTRACT CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNlT PRICE PRICE 204 Abandon inlets or manholes, complete as specified Each 4 3.00 -1.00 $360.00 ($360.00) 205 Furnish, install, and maintain Type "D" inlet protection, complete as specified Each 10 5.00 -5.00 $100.00 ($500.00 SECTION II - (BID ITEMS 200 - 205) - SUB- TOTALS $220.00 ($860.00) ADDITIONAL WORK.REQUIRED: C.O. # 1 - SECTION II ADDITIONAL WORK: C.O. # 1 - (ITEMS 206) - SUB -TOTAL $715.00 $0.00 NET INCREASE TO: SECTION II - $75.00 NET INCREASE TO SECTIONS I, II $16,339.42 NET DECREASE TO SECTIONS i, II ($6,038.25) INCREASE IN DECREASE IN ITEM CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNlT PRICE PRICE SECTION II - (BID ITEMS 200 - 205) - SUB- TOTALS $220.00 ($860.00) ADDITIONAL WORK.REQUIRED: C.O. # 1 - SECTION II ADDITIONAL WORK: C.O. # 1 - (ITEMS 206) - SUB -TOTAL $715.00 $0.00 NET INCREASE TO: SECTION II - $75.00 NET INCREASE TO SECTIONS I, II $16,339.42 NET DECREASE TO SECTIONS i, II ($6,038.25) NET INCREASE TO CONTRACT: $10,301.17