Loading...
HomeMy WebLinkAboutFishcer-Ulman 08-06 # 2CHANGE ORDER # 2 DATED: November 24, 2008 TO: Fischer- Ulm an. Construction 1115 S. Theodore St. Appleton, W1 54915 Your present contract with the City of Oshkosh, Contract No. and changed as follows: CONCRETE SIDEWALK (New and Reconstruction) NET DECREASE TO CONTRACT: 11 Recommended: Director of Public Works 08 -06 , is hereby amended ($26,618.31) ($26,618.31) CITY OF OSHKOSH I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller .1. A roved and acce d: ontr ctor CONTRACT: 08 -06 CHANGE ORDER # 2 CONCRETE SIDEWALK (New and Reconstruction) 1 Sidewalk removal & INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER complete asspecified Feet QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 1 Sidewalk removal & driveway removal, Square complete asspecified Feet 95,725 104,187.74 8,462.74 $0.39 $3,300.47 2 Concrete /asphalt sawing, Linear complete asspecified Feet 5,500 4,327.60 - 1,172.40 $1.75 ($2,051.70) 3 Construct 4" thick concrete sidewalk in various locations in the City of Oshkosh, complete as Square , specified Feet 93,600 97,194.90 3,594.90 $2.67 $9,598.38 4 Construct 6" thick concrete sidewalk in various locations in the City of Oshkosh, complete as Square specified Feet 19,100 20,695.96 1,595.96 $3.01 $4,803.84 5 Construct 7" thick crosswalk areas, complete Square asspecified Feet 4,125 4,721.63 596.63 $3.18 $1,897.28 6 Provide and install metal detectable warning plates, complete as specified Square Feet 264 288.00 24.00 $28.00 $672.00 7 Three (3") inch asphalt replacement, complete as Square specified Feet 2,000 1,748.85 - 251.15 $3.50 ($879.03) 8 Curb and gutter removal, Linear complete asspecified Feet 500 320.50 - 179.50 $3.00 ($538.50) 9 Construct 30° curb and gutter, complete as Linear specified Feet 500 369.70 - 130.30 $16.80 ($2,189.04) 10 Terrace restoration, including seed, fertilizer, and mulch, complete as Square specified Yards 360 1,061.63 701.63 $3.50 $2,455.71 11 Furnish and install pavement ties, complete as specified Each 125 55.00 -70.00 $7.00 ($490.00) 12 Construct 4" thick concrete sidewalk in Water Dept. repair locations at approx. 60 sites, complete as specified Square Feet 3,500 2,142.99 - 1,357.01 $3.95 ($5,360.19) 13 Construct 6" thick concrete sidewalk in Water Dept. repair locations at approx. 20 sites, complete as specified Square Feet 1,000 1,947.44 947.44 $4.10 $3,884.50 Page 1 CONTRACT: 08 -06 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE 1N CONTRACT DECREASE IN CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 14 7" non- reinforced concrete QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified Square Yards 100 52.55 -47.45 $38.00 ($1,803.10) 15 8" non - reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified Square Yards 1,500 233.19 - 1,266.81 $37.50 ($47,505.38) 16 8" special High Early Strength, non - reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb and grading, terracing and traffic control, complete as specified Square Yards 100 170.09 70.09 $45.001 $3,154.05 17 Extra crushed stone base, complete as specified Tons 200 279.67 79.67 $14.00 $1,115.38 18 No. 4 epoxy- coated reinforcement rods, Linear installed asspecified Feet 600 280.00 - 320.00 $1.50 ($480.00) 19 Furnish, install, and maintain Type "C" inlet protection, complete as specified Each 20 8.00 -12.00 $40.00 ($480.00) 20 Furnish, install, and maintain Type "D" inlet protection, complete as specified Each 5 0.00 -5.00 $40.00 $200.00) 21 Construct 12" wide radius curb head, complete as Linear specified Feet 150 179.00 29.00 $3.00 $87.00 SUB -TOTAL ADDITIONAL WORK REQUIRED: C.O. #2 $30,968.61 ($61,976.94) 1A Reduction of change order #1, item #1, 8"/7-bag non - reinforced concrete Square Yard - 634.80 - 634.80 $43.75 ($27,772.50) Page 2 INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 1A Reduction of change order #1, item #1, 8"/7-bag non - reinforced concrete Square Yard - 634.80 - 634.80 $43.75 ($27,772.50) Page 2 CONTRACT: 08 -06 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 1 8 "/7 -bag non - reinforced concrete removal & replace ment, including sawing, pavement ties, integral curb & grading, terracing_ & traffic control, complete as Square s ecified Yard 475.46 475.46 $43.75 $20,801.38 2 9 "/7 -bag non - reinforced concrete removal & replacement, including sawing, pavement ties, integral curb & gutter, terracing & traffic control, Square complete asspecified Yard 195.25 195.25 $47.50 $9,274.38 3 Patch apron at 2034 Lump Memominee Drive Sum 1.00 1.00 $100.00 $100.00 4 Construct 8" thick concrete Square sidewalk Feet 122.40 122.40 $3.65 $446.76 5 E -Mat on N. Main Street Square Yard 504.00 504.00 $2.50 $1,260.00 6 Fill in street patch at 932 Winnebago Ave. with Lump ravel, lump sum Sum 1.00 1.00 $280.00 $280.00 ADDITIONAL WORK: C.O. # 2 - (ITEMS 1 - 6) - SUB -TOTAL $32,162.52 ($27,772.50) $63,131.13 ($89,749.44) NET DECREASE TO CONTRACT: ($26,618.31) City of Oshkosh Department of Public Works 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903 -1130 (920) 236 -5065 Of H KOf H ON THE WATER December 10, 2008 Mr. Leroy Fischer Fischer -Ulman Construction, Inc. 1115 S. Theodore Street Appleton, WI 54915 Re; Change Order #2 /Contract 08 -06 Dear Mr. Fischer: Enclosed please find an executed copy of the Change Order between the City of Oshkosh and Fischer -Ulman Construction, Inc. regarding the above - mentioned project. If you have any questions, please call our office at (920) 236 -5065. Thank you. Sincerely, o�CLVt -� ��i�vlcQirw David C. Patek Director of Public Works DCP /clm Enclosure cc: Pam Ubrig, City Clerk (w /original) Lynn Lorenson, City Attorney (w /copy) File Copy (w /original)