HomeMy WebLinkAboutFishcer-Ulman 08-06 # 2CHANGE ORDER # 2
DATED: November 24, 2008
TO: Fischer- Ulm an. Construction
1115 S. Theodore St.
Appleton, W1 54915
Your present contract with the City of Oshkosh, Contract No.
and changed as follows:
CONCRETE SIDEWALK (New and Reconstruction)
NET DECREASE TO CONTRACT:
11
Recommended:
Director of Public Works
08 -06 , is hereby amended
($26,618.31)
($26,618.31)
CITY OF OSHKOSH
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
Comptroller
.1.
A roved and acce d:
ontr ctor
CONTRACT: 08 -06 CHANGE ORDER # 2
CONCRETE SIDEWALK (New and Reconstruction)
1
Sidewalk removal &
INCREASE IN
DECREASE IN
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
complete asspecified
Feet
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
1
Sidewalk removal &
driveway removal,
Square
complete asspecified
Feet
95,725
104,187.74
8,462.74
$0.39
$3,300.47
2
Concrete /asphalt sawing,
Linear
complete asspecified
Feet
5,500
4,327.60
- 1,172.40
$1.75
($2,051.70)
3
Construct 4" thick concrete
sidewalk in various
locations in the City of
Oshkosh, complete as
Square
, specified
Feet
93,600
97,194.90
3,594.90
$2.67
$9,598.38
4
Construct 6" thick concrete
sidewalk in various
locations in the City of
Oshkosh, complete as
Square
specified
Feet
19,100
20,695.96
1,595.96
$3.01
$4,803.84
5
Construct 7" thick
crosswalk areas, complete
Square
asspecified
Feet
4,125
4,721.63
596.63
$3.18
$1,897.28
6
Provide and install metal
detectable warning plates,
complete as specified
Square
Feet
264
288.00
24.00
$28.00
$672.00
7
Three (3") inch asphalt
replacement, complete as
Square
specified
Feet
2,000
1,748.85
- 251.15
$3.50
($879.03)
8
Curb and gutter removal,
Linear
complete asspecified
Feet
500
320.50
- 179.50
$3.00
($538.50)
9
Construct 30° curb and
gutter, complete as
Linear
specified
Feet
500
369.70
- 130.30
$16.80
($2,189.04)
10
Terrace restoration,
including seed, fertilizer,
and mulch, complete as
Square
specified
Yards
360
1,061.63
701.63
$3.50
$2,455.71
11
Furnish and install
pavement ties, complete as
specified
Each
125
55.00
-70.00
$7.00
($490.00)
12
Construct 4" thick concrete
sidewalk in Water Dept.
repair locations at approx.
60 sites, complete as
specified
Square
Feet
3,500
2,142.99
- 1,357.01
$3.95
($5,360.19)
13
Construct 6" thick concrete
sidewalk in Water Dept.
repair locations at approx.
20 sites, complete as
specified
Square
Feet
1,000
1,947.44
947.44
$4.10
$3,884.50
Page 1
CONTRACT: 08 -06 CHANGE ORDER # 2
ITEM
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE 1N
CONTRACT
DECREASE IN
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
14
7" non- reinforced concrete
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
pavement removal and
replacement, including
sawing, pavement ties,
integral curb & grading,
terracing & traffic control,
complete as specified
Square
Yards
100
52.55
-47.45
$38.00
($1,803.10)
15
8" non - reinforced concrete
pavement removal and
replacement, including
sawing, pavement ties,
integral curb & grading,
terracing & traffic control,
complete as specified
Square
Yards
1,500
233.19
- 1,266.81
$37.50
($47,505.38)
16
8" special High Early
Strength, non - reinforced
concrete pavement
removal and replacement,
including sawing,
pavement ties, integral
curb and grading, terracing
and traffic control,
complete as specified
Square
Yards
100
170.09
70.09
$45.001
$3,154.05
17
Extra crushed stone base,
complete as specified
Tons
200
279.67
79.67
$14.00
$1,115.38
18
No. 4 epoxy- coated
reinforcement rods,
Linear
installed asspecified
Feet
600
280.00
- 320.00
$1.50
($480.00)
19
Furnish, install, and
maintain Type "C" inlet
protection, complete as
specified
Each
20
8.00
-12.00
$40.00
($480.00)
20
Furnish, install, and
maintain Type "D" inlet
protection, complete as
specified
Each
5
0.00
-5.00
$40.00
$200.00)
21
Construct 12" wide radius
curb head, complete as
Linear
specified
Feet
150
179.00
29.00
$3.00
$87.00
SUB -TOTAL
ADDITIONAL WORK REQUIRED: C.O. #2
$30,968.61 ($61,976.94)
1A Reduction of change order
#1, item #1, 8"/7-bag non -
reinforced concrete Square
Yard - 634.80 - 634.80 $43.75 ($27,772.50)
Page 2
INCREASE IN
DECREASE IN
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
1A Reduction of change order
#1, item #1, 8"/7-bag non -
reinforced concrete Square
Yard - 634.80 - 634.80 $43.75 ($27,772.50)
Page 2
CONTRACT: 08 -06 CHANGE ORDER # 2
ITEM
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
1
8 "/7 -bag non - reinforced
concrete removal & replace
ment, including sawing,
pavement ties, integral
curb & grading, terracing_ &
traffic control, complete as
Square
s ecified
Yard
475.46
475.46
$43.75
$20,801.38
2
9 "/7 -bag non - reinforced
concrete removal &
replacement, including
sawing, pavement ties,
integral curb & gutter,
terracing & traffic control,
Square
complete asspecified
Yard
195.25
195.25
$47.50
$9,274.38
3
Patch apron at 2034
Lump
Memominee Drive
Sum
1.00
1.00
$100.00
$100.00
4
Construct 8" thick concrete
Square
sidewalk
Feet
122.40
122.40
$3.65
$446.76
5
E -Mat on N. Main Street
Square
Yard
504.00
504.00
$2.50
$1,260.00
6
Fill in street patch at 932
Winnebago Ave. with
Lump
ravel, lump sum
Sum
1.00
1.00
$280.00
$280.00
ADDITIONAL WORK: C.O. # 2 - (ITEMS 1 - 6) - SUB -TOTAL $32,162.52 ($27,772.50)
$63,131.13 ($89,749.44)
NET DECREASE TO CONTRACT: ($26,618.31)
City of Oshkosh
Department of Public Works
215 Church Avenue
P.O. Box 1130
Oshkosh, Wisconsin
54903 -1130
(920) 236 -5065
Of H KOf H
ON THE WATER
December 10, 2008
Mr. Leroy Fischer
Fischer -Ulman Construction, Inc.
1115 S. Theodore Street
Appleton, WI 54915
Re; Change Order #2 /Contract 08 -06
Dear Mr. Fischer:
Enclosed please find an executed copy of the Change Order between the City of Oshkosh and
Fischer -Ulman Construction, Inc. regarding the above - mentioned project.
If you have any questions, please call our office at (920) 236 -5065. Thank you.
Sincerely,
o�CLVt -� ��i�vlcQirw
David C. Patek
Director of Public Works
DCP /clm
Enclosure
cc: Pam Ubrig, City Clerk (w /original)
Lynn Lorenson, City Attorney (w /copy)
File Copy (w /original)