HomeMy WebLinkAboutMSA # 2 N Main StAmendment No. 2 To: City of Oshkosh Date of Issuance: 918/08 David Patek, P.E. 215 Church Avenue MSA Project No.: 0930567 Oshkosh, WI 54903 -1130 This is an amendment to the Agreement dated August 8, 2006 and does acknowledge that MSA Professional Services, Inc. (MSA) is authorized to begin work on the following project amendment: Project Name: North Main Street (Algoma Blvd. to Irving Ave) The project scope has changed due to: -The presence of privately owned vaults and basement extensions within the Main Street right -of -way. -The building addition to the Oshkosh Centre on the southeast corner of the Ceape Avenue and Main Street intersection, which includes raising the sidewalk near the building entrances The scope of the work authorized is: Section VI.A.1 is added as follows to Section A.2.0 of Exhibit A -Basic Services and Related Matters) The ENGINEER shall investigate for belowground vaults extending within the highway RAN for buildings built at the RYW limits within the project limits. The ENGINEER shall send a letter in advance notifying the property owner that project personnel will be requesting access to the basements of these buildings for the purpose of vault investigation. The ENGINEER shall design the final roadway grades and elevations to match in with the Oshkosh Centre. The schedule to perform the work is: Approximate Start: 10/1/08 Approximate Completion: 12/8/09 The lump sum fee for the work is: $4,836.55 (Vault Investigation) 811.91 (Additional design work, Ceape Ave) Total Contract Amendment $5,648.46 Authorization for the work described above shall amend the Agreement between MSA and OWNER. Any attachments or exhibits referenced in this Amendment are made Page 1 of 2 G:\projects\90s \93 \930566 \Contract\City Contract\Amendment #2.doc part of the Agreement. Payment for these services will be on a lump sum basis. Approval: MSA shall commence work on this project in accordance with your written authorization. This authorization is acknowledged by signature of the authorized representatives of the parties to this Amendment. A copy of this Amendment signed by the authorized representatives shall be returned for our files. if a signed copy of this Authorization is not received by MSA within seven days from the date of issuance, MSA may stop work on the project. SIGNED FOR AND IN BEHALF OF THE MSA PROFESSIONAL SERVICES, INC. CITY OF OSHKOSH � 2 d' rK Mark kohloff, City Manager Pamela R. Ubrig, City Clerk � q�"/l A A^— rAN Ly L rensen, Ae4mYG Attorney '7-S -ou Mi hael J. Statz, P1. Project Manager City Comptroller I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. Address for giving notices: 215 Church Avenue Oshkosh, WI 54903 -1130 Phone: (920) 236 -5065 Fax: (920) 236 -5068 Addresses for giving notices: 2901 International Lane, Suite 300 Madison, WI 53704 -3133 Phone: (608) 242 -7779 Fax: (608) 242 -5664 Page 2 of 2 G:\ projects \90s \93 \930566 \Contract \Cdy Contract\Amendment #2.doc ` Fee Computation Summary by Engineering Task Main Street, City of Oshkosh (Algoma Blvd - Parkway Ave) PROJECT TOTAL Task Activity Direct L abor ; Overhead Direct Fixed Fee /Profit Total Code Costs _ _: Casts Expenses Project Dev- 740 $204.20 $330.62 $50.81 $30.00 $615.63 dmin /Coordination Design- Reports 748 $0.00 $0.00 $0.00 $0.00 $0.00 Envir Imp- Environmental 767 $0.00 $0.00 $0.00 $0.00 $0:00 Documents Proj Dev- Utilities /RR/Agency 746 $0.00 $0.00 $0.00 $0.00 $0.00 Public Info Meetings & 743 $0.00 $0.00 $0.00 $0.00 $0.00' Hearings Survey - General 729 $0.00 $0.00 $0.00 $0.00 $0.00. Prelim Design - General 741 $1,316.26 $2,131.16 $327.50 $446.00 $4,220.92: Preliminary Structure Design 1001 $0.00 $0.00 $0.00 $0.00 $0.00 Finalize Design Elements 742 $283.10 $458.37 $70.44 $0.00 $811.91 Final Structure Design 1002 $0.00 $0.00 $0.00 $0.00 $0.00 Design -R/W -Plats 745 $0.00 $0.00 $0.00 $0.00 $0.00 Development Project Develop- Meetings 747 $0.00 $0.00 $0.00 $0.00 $0;00 PS &E 794 $0.00 $0.00 $0.00 $0.00 $0.00' Consultant Management 773 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL: $:1,803.56 $2,920.15 $448.75 $476.00 $5,648.46 Negotiated Overhead Rate: Percent Profit. 157.38% for original contract Contract Amendment #2.xls 9/812008 Consultant Contract Total Fee Con Project, ID Original Contract CA #1 CA #2 Method of Payment Total for ContractJ' .Work Order Num of Staff' 11 2502 _ - 12 -_ - 59 2573 ation Numtrtei�0,'tstiti erriceslnc” ` a ,. , ,.,,d NTE Total Direct Labo $68,884.09 $379.90 $711067.55 Total Overhead $108,409.78 $642.72 P } Fixed Fee /Profit' $16,842.91 $97.15 L$2,920.15 $17,388.81 Expenses $4,030.00 $25.00 $4,531.00' Streescpe t:' $5 945�DQx $5,945.00 ,r� ifeat $5 X82 OQ $5,406.00 $10,688.00 ooidin twn rc Sypsuifece N � $ 1 X35 00° $ 1,935.00 ��tnv�esfation �F� x S j a TOTAL COST $211,328.78 $6,550.77 $5646.46 - 1( — $223,528:Q1 11 IL— ^ I 1i Negotiated Overhead Rate: 161.91% Percent Profit: 9.5% 157.38% for original contract Schedule of Subcontracts WO RK ELEMENT NAME OF SUBCONSULTANT Method of Payment Subcontract Amount Streetsca a Architecture Historical Coordination s. �rj „Ci jr Mnt' " *$ Rsearc,..Lid' .,° „ . . �.• TE „ Subsurface Investi ation Numtrtei�0,'tstiti erriceslnc” ` a ,. , ,.,,d NTE . -. fi t.'. P } Contract Amendment #2.xls 9/8/2008 �� �!