Loading...
HomeMy WebLinkAbout2007-Plumbing (bathtub) e OSHKOSH ON THE WATER Job Address 2892 RUSCHFIELD DR CITY OF OSHKOSH No 123129 PLUMBING PERMIT - APPLICATION AND RECORD Owner MICHAEL J/AMY J DOMKE Create Date 01/09/2007 Contractor LUDWIG'S PLUMBING Category 410 - Residential-Interior Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures UselNature FR 1 REPLACE BATHTUB ""debt acct of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Wait. St. lee Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Plan Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs I).. ,- , Sanitary Sewer Type # Conn. Type Storm Sewer Water Service Size Material Parcelld # 1340590000 Valuation $~~.o~oo Issued B~lA=.T~ Plan Approval $25.00 0 PerrT1-'-~Voided I $0.00 Permit Fees Date 01/09/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction; While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1903 ASHLAND AVE OSHKOSH WI 54901 - 0000 Telephone Number 231-5770 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.