Loading...
HomeMy WebLinkAbout09-189MAY 26, 2009 09 -189 RESOLUTION (CARRIED 6 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 09 -05 WITH FOUR -WAY CONSTRUCTION OF WI, INC. FOR HIGHWAY 41 AREA UTILITY RELOCATIONS ( +$62,108) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: FOUR -WAY CONSTRUCTION OF WI, INC. PO BOX 133 BERLIN, WI 54923 Net Increase to contract: $62,108.00 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 541 - 1841 - 1799 -00000 - Water Utility Construction Work in Progress Acct. No. 551 - 1910 - 1799 -00000 - Sewer Utility Construction Work in Progress Acct. No. 317 - 0410 - 7480 -03302 - Special Assessments Fund - Sewer Acct. No. 317 - 0410 - 7480 -03303 - Special Assessments Fund - Water ( 0 OfHKOlH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works DATE: May 21, 2009 RE: Change Order #1 for Public Works Contract No. 09 -05; USH 41 Corridor Utilities North of Lake Butte Des Morts BACKGROUND Change Order #1 for Contract 09 -05 is scheduled for consideration by the Common Council at the May 26, 2009 meeting. The contract was originally awarded to Four -Way Construction of WI, Inc. in March of 2009. This change order is for material changes on sanitary sewer force mains and additional water main work. ANALYSIS The sanitary sewer force main pipe type was modified due to the long length of boring. The Cert-a -Lok pipe will allow the City to be able to remove and repair the pipe easier in the future. The additional water main was added after additional coordination with the Department of Transportation (DOT). The DOT was able to relocate a proposed ditch away from the existing water main location allowing the main to remain. This allowed for the existing water main to be extended approximately 250' to provide fire protection for the properties. The extension will eliminate the need to install approximately 1150' of water main to reach the same area. The extension is 90% compensable by the DOT. The 1150' was determined to be "betterment" by the DOT due to the potential to serve additional lots and thus would have been 100% City cost. The change order is needed because the contract did not contain items for the pipe size of the existing main that was extended. A future change order will reduce the quantities and cost of the water items. FISCAL IMPACT Funds are available in the 2009 Capital Improvement Budget under USH "41" Expansion Utility Relocations. Budget amounts are Sanitary Sewer $1,200,000 and Water Main $1,000,000. These amounts are for all utility work the City needs to perform in 2009 along the corridor. This project is only one. part of the work. The initial contract amount was $904,279.50. The increased amount for each section is as follows: Sanitary Sewer $14,208.00 and Water Main $47,900.00. Adequate funds remain in each of the utility accounts. RECOMMENDATIONS I recommend approval of the Change Order # 1 to Contact No. 09 -05 in the amount of $62,108.00 to Four -Way Construction of WI, Inc. Respectfully Submitted, Approved: A& W�_;a Steven M. M. Gohde Asst. Director of Public Works City Manager IAEngineering \09 -05 USH 41 Utilities -North of Lake\ Project_ Information \Correspondence\Memo \CO #1 exp.doc CHANGE ORDER # 1 DATED: May 5, 2009 TO: Four -Way Construction of WI, Inc. P. O. Box 133 Berlin, WI 54923 Your present contract with the City of Oshkosh, Contract No and changed as follows: NET INCREASE TO: SECTION I - CONCRETE PAVING NET INCREASE TO: SECTION III - SANITARY SEWER NET INCREASE TO: SECTION IV -WATER MAIN NET INCREASE TO CONTRACT: Recommended: Director of Public Works BY: 09 -05 , is hereby amended $2,800.00 $14,208.00 $45,100.00 $62,108.00 CITY OF OSHKOSH City Manager City Clerk Approved and accepted: Contract I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: Comptroller City Attorney CONTRACT: 09 -05 CHANGE ORDER # 1 SECTION I - CONCRETE PAVING ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION I ITEM Additional price pre foot to CONTRACT INSTALLED NET NET COST PER INCREASE EAS E IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT tECR CONTRACCONTRACT CONTRACT Pipe through Casing Pipe, Linear PRICE PRICE 121 Preparation of foundation for Asphalt Paving on Marine Dr., complete as specified lump sum 1.00 1.00 $2,800.00 $2,800.00 ADDITIONAL WORK: C.O. # 1 - (ITEM 121) - SUB -TOTAL $2,800.00 $0.00 NET INCREASE TO: SECTION 1 $2,800.00 SECTION III - SANITARY SEWER ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION III ITEM Additional price pre foot to CONTRACT INSTALLED NET NET COST PER INCREASE /N DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES I IN DECREASE UNIT CONTRACT CONTRACT Pipe through Casing Pipe, Linear PRICE PRICE 317 Additional price pre foot to CONTRACT INSTALLED NET NET COSTPER INCREASE IN DECREASE IN NUMBER use 10" C -900 Cert -a -lok UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT Pipe through Casing Pipe, Linear PRICE PRICE complete as specified Foot 400.00 400.00 $13.35 $5,340.00 318 Additional price per foot to Each 250.00 250.00 $104.40 $26 ,100.00 422 use 12" C -900 Cert-a -lok Pipe through casing pipes, I complete as specified Each 400.00 400.00 $17.42 $6,968.00 319 Furnish & install 10" solid sleeves with Megalugs, complete asspecified Each 2.00 2.00 $450.00 $900.00 320 Furnish & install 12" solid sleeves with Megalugs, , complete asspecified Each 2.00 2.00 $500.00 $1,000.00 ADDITIONAL WORK: C. O. # 1 - (ITEMS 317 - 320) - SUB -TOTAL $14,208.00 $0.00 NET INCREASE TO: SECTION III $14,208.00 SECTION IV - WATER MAIN ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION IV ITEM Furnish and install 16" CONTRACT INSTALLED NET NET COSTPER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT with Poly Warp, complete PRICE PRICE 421 Furnish and install 16" Ductile Iron Watermain with Poly Warp, complete as specified (fittings not included) Each 250.00 250.00 $104.40 $26 ,100.00 422 Furnish and install 16" 45 degree bends, complete I as specified Each 3.00 3.00 $860.00 $2,580.00 Page 1 CONTRACT: 09 -05 CHANGE ORDER # 1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 423 Furnish and install 16" 22.5 degree bends, complete asspecified Each 1.00 1.00 $860.00 $860.00 424 Furnish and install 16" 11,25 degree bends, complete asspecified Each 1.00 1.00 $850.00 $850.00 425 Furnish & install 16" x 6" reducer, complete as specified Each 1.00 1.00 $650.00 $650.00 426 Furnish and install 16" valve, complete as specified Each 1.00 1.00 $6,460.00 $6,460.00 427 Furnish and install 6" 45 degree bends, complete asspecified Each 8.00 8.00 $175.00 $1,400.00 428 Relocate existing Hydrants, complete as specified Each 1.00 1.00 $1,500.00 $1,500.00 429 Abandon water valve manhole, complete as specified Each 1.00 1.00 $4,700.00 $4,700.00 ADDITIONAL WORK: C.O. # 1 (ITEMS 421-429) -SUB-TOTAL $45,100.00 $0.00 NET INCREASE TO: SECTION IV - $45,100.00 NET INCREASE TO SECTIONS 1, II, III, IV $62,108.00 NET DECREASE TO SECTIONS I, II, III, IV $0.00 NET INCREASE TO CONTRACT: $62,108.00 Page 2