Loading...
HomeMy WebLinkAbout09-168MAY 12, 2009 09 -168 RESOLUTION (CARRIED 6 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF CHANGE ORDER NO. 1, FOR PUBLIC WORKS CONTRACT 09 -03 WITH PTS CONTRACTORS INC. FOR CONCRETE PAVING & WATER MAIN ( +$25,988.15) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: PTS CONTRACTORS INC. 4075 Eaton Road Green Bay, WI 54311 Net Increase to contract: $25,988.15 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 541 - 1841 - 1799 -00000 Water Utility Construction Work in Progress Acct. No. 551 - 1910 - 1799 -00000 Sewer Utility Construction Work in Progress Acct. No. 317 - 0410 - 7480 -03303 Special Assessments Fund - Water ( 0 OfHKOIH ON THE WATER MEMORANDUM TO: FROM DATE: RE: Honorable Mayor and Members of the Common Council Steven M. Gohde, Assistant Director of Public Works May 7, 2009 Change Order #1 for Public Works Contract No. 09 -03; USH 41 Corridor Utilities South of Lake Butte Des Morts BACKGROUND Change Order #1 for Contract 09 -03 is scheduled for consideration by the Common Council at the May 12, 2009 meeting. The contract was originally awarded to PTS Contractor Inc. of Green Bay in March of 2009. This change order is for additional erosion control, signage and a change in water main pipe. ANALYSIS Additional erosion control measures and signage were needed to prevent pollution and keep the public informed of the road closure schedule. The water main pipe type was modified due to the long length of boring. The Snap Lok pipe will allow the City to be able to remove and repair the pipe easier in the future. FISCAL IMPACT Funds are available in the 2009 Capital Improvement Budget. The increased amount for each section is as follows: Streets $7,100 and Water Main $18,888.15. RECOMMENDATIONS recommend approval of the Change Order # 1 to Contact No. 09 -03 in the amount of $25,988.15 to PTS Contractors Inc. Respectfully Submitted, / Steven M. Gohde Asst. Director of Public Works Approved: City Manager ]:\Engineering \09 -03 USH 41 Utilities - South of Lake\Project_ Information \Correspondence\Memo \CO # 1 exp.doc CHANGE ORDER # 1 DATED: May 1, 2009 TO: PTS Contractors Inc. 4075 Eaton Road Green Bay, WI 54311 Your present contract with the City of Oshkosh, Contract No. 09 -03 , is hereby amended and changed as follows: NET INCREASE TO: SECTION I - CONCRETE PAVING NET INCREASE TO: SECTION IV -WATER MAIN NET INCREASE TO CONTRACT: Recommended: Director of Public Works 3'A $7,100.00 $18,888.15 $25,988.15 CITY OF OSHKOSH City Manager City Clerk Approved and accepted: C ntra or certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 09 -03 CHANGE ORDER # 1 SECTION I - CONCRETE PAVING ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION I 17EM Furnish, install, maintain CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT Protection, Type D each 25.00 25.00 $140.00 PRICE PRICE 125 Furnish, install, maintain CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER and remove Inlet UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT Protection, Type D each 25.00 25.00 $140.00 $3,500.00 PRICE 126 Additional days required for Message Boards due to Linear D.O.T. delays on Utility Foot 225.00 225.00 $14.50. $3,262.50 445 Agreements each 36.00 36.00 $100.00 $3,600.00 ADDITIONAL WORK: C.O. # 1- (ITEMS 125 -126) - SUB -TOTAL $7,100.00 $0.00 NET INCREASE TO: SECTION I - $7,100.00 SECTION IV -WATER MAIN ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION IV ITEM Additional price per foot for CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT Pipe through casing pipes Foot 715.00 715.00 $19.35 PRICE PRICE 443 Additional price per foot for 16" Snap Lok Watermain Linear Pipe through casing pipes Foot 715.00 715.00 $19.35 $13,835.25 444 Additional price per foot for 12" Snap Lok Watermain Linear Pipe through casing pipes Foot 225.00 225.00 $14.50. $3,262.50 445 Furnish and install 6" - 45 degree bends, complete as specified each 12.00 12.00 $149.20 $1,790.40 ADDITIONAL WORK: C.O. # 1 (ITEMS 443-445)-SUB-TOTAL $18,888.15 $0.00 NET INCREASE TO: SECTION IV - $18,888.15 NET INCREASE TO SECTIONS I & IV $25,988.15 NET DECREASE TO SECTIONS I & IV $0.00 NET INCREASE TO CONTRACT: $25,988.15 Page 1