Loading...
HomeMy WebLinkAbout09-111APRIL 14, 2009 09 -111 RESOLUTION (CARRIED 6 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE AGREEMENTS / WISCONSIN DEPARTMENT OF TRANSPORTATION FOR RECONSTRUCTION OF US HWY 41: A) 9th AVENUE ($110,600.00) B) OSHKOSH AVENUE /OMRO ROAD ($85,500.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the attached Agreements with Wisconsin Department of Transportation for reconstruction of US Hwy 41 for 9th Avenue interchange in the amount of $110,600.00 and for Oshkosh Avenue /Omro Road in the amount of $85,500.00 are hereby approved and the proper City officials are hereby authorized to execute and deliver the agreement in substantially the same form as attached hereto, any changes in the execution copy being deemed approved by their respective signatures, and said City officials are authorized and directed to take those steps necessary to implement the terms and conditions of the Agreement. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: A) Acct. No. 315 - 0410 - 7480 -00000 - Street Improvement Fund Expenditures Acct. No. 551 - 1910 - 1799 -00000 - Sewer Utility Construction Work in Progress B) Acct. No. 315 - 0410 - 7480 -00000 - Street Improvement Fund Expenditures Acct. No. 541 - 1841 - 1799 -00000 - Water Utility Construction Work in Progress Acct. No. 551 - 1910 - 1799 -00000 - Sewer Utility Construction Work in Progress ( 0 OlHKOlH ON THE WATER MEMORANDUM TO: FROM: DATE: RE: Honorable Mayor and Members of the Common Council David C. Patek, Director of Public Works April 4, 2009 Approve Agreement/Wisconsin Department of Transportation for Reconstruction of US Highway 41 (USH 41) at 9 th Avenue BACKGROUND The Wisconsin Department of Transportation ( WIDOT) is planning to reconstruct USH 41 from State Highway 26 to Breezewood Lane in Neenah beginning in 2009. USH 41 has reached its capacity and will be expanded to meet the public needs and improve safety. The construction addressed in this agreement covers 9 th Avenue from Koeller Street to Washburn Street. ANALYSIS The WIDOT has prepared cost estimates for the proposed work. This agreement allocates expenses to the City of Oshkosh for costs to seal concrete pavement joints, install irrigation systems for the roundabout landscape areas, and adjust sanitary sewer manholes. The WIDOT is bearing all other costs associated with this project. FISCAL IMPACT Funds will be included in the Street Construction and Sanitary Sewer sections of the 2011 Capital Improvement Program. The total estimated cost to the City is $110,600. RECOMMENDATIONS recommend approval of the State /Municipal Agreement. R espectfully Submitted, David C. Patek Director of Public Works Approved: Mark A. Rohloff City Manager I:\ Engineering \Correspondence\David Patek\DOT Agreement 9th Avenue.doc ( 0 QfHK01 ON THE WATER MEMORANDUM TO: FROM DATE: RE: Honorable Mayor and Members of the Common Council David C. Patek, Director of Public Works April 8, 2009 Approve Agreement with Wisconsin Department of Transportation for Reconstruction of US Highway 41 (USH 41) at State Trunk Highway 21 (STH 21) BACKGROUND The Wisconsin Department of Transportation ( WIDOT) is planning to reconstruct USH 41 from State Highway 26 to Breezewood Lane in Neenah beginning in 2009. USH 41 has reached its capacity and will be expanded to meet the public needs and improve safety. The construction addressed in this agreement covers STH 21 from Koeller Street to Washburn Street. ANALYSIS The WIDOT has prepared cost estimates for the proposed work. This agreement allocates expenses to the City of Oshkosh for costs to seal concrete pavement joints, install irrigation systems for the roundabout landscape areas, adjust water valve manholes, adjust sanitary sewer manholes, and relocate watermain. The WIDOT is bearing all other costs associated with this project. FISCAL IMPACT Funds will be included in the street, sanitary sewer, and watermain sections of the 2012 Capital Improvement Program. The total estimated cost to the City is $85,500. RECOMMENDATIONS I recommend approval of the State/ Municipal Agreement. Respectfully Submitted, b-';J p David C. Patek Director of Public Works Approved: Mark A. Rohloff City Manager I:1 Engineering \Correspondence\David Patek \DOT Agreement HWY 21.doc STATE / MUNICIPAL AGREEMENT FOR A HIGHWAY IMPROVEMENT PROJECT DATE: I.D.. February 27, 2009 1120 -10 -72 HIGHWAY: LIMITS: COUNTY: US 41 LENGTH: 0.0 STH 26 — STH 21 Winnebago The signatory City of Oshkosh, hereinafter called the Municipality, through its undersigned duly authorized officers or officials, hereby requests the State of Wisconsin Department of Transportation, hereinafter called the State, to initiate and effect the highway or street improvement hereinafter described. The authority for the Municipality to enter into this agreement with the State is provided by Section 86.25(1), (2), and (3) of the Statutes. NEEDS AND ESTIMATE SUMMARY: Existing Facility (describe and give reason for request): US 41 will be reconstructed from four to six lanes from STH 26 - Breezewood Lane. US 41 has reached its capacity and upgrading capacity will meet the future needs of the travelling public along with improving safety. Proposed Improvement (nature of work): Reconstruct 9` Avenue interchange with US 41 to include 4 multi -lane roundabouts. Describe non - participating work included in the project contract: Sealing concrete pavement joints and irrigation system. Describe other work necessary to finish the project completely which will be undertaken independently by the Municipality: Relocation of water main and sanitary sewer in conflict with project will be relocated prior to project with its own City contract. PHASE ESTIMATED COST Federal / State Municipal Total Estimated Cost Funds % Funds YO Construction (Participating): Project ID 1120 -10 -72 Category 0010 — Roadway Items $4,000,000 $4,000,000 100 $ 0 0 Category 0020 — Sign Structures $ 280,000 $ 280,000 100 $ 0 0 Category 0030 — B -70 -256 9th Ave. $1,600,000 $1,600,000 100 $ 0 0 Overpass Category 0040 — R -70 -36 $260,000 $260,000 100 $0 0 Category 0050 — R -70 -37 $260,000 $260,000 100 $0 0 Category 0060- Lighting $250,000 Priority 1 Funding — Community Sensitive 19,500 L.S. $0 0 Design Priority 2 - Balance $230,500 o 100 /o $0 0 Category 0 — Community Sensitive $80,000 $80,000 100 $0 0 Design Items — Roundabout Landscaping Category 0080 — Adjusting Sanitary $6,000 $5,400 90 $600 10 Manholes SUBTOTAL: $ 6,736,000 $ 6,735,400 $600 Construction (Non - Participating): Category 0090 — Non - Participating — $ 110,000 $ 0 0 $110,000 100 Sealing Concrete Joints & Irrigation System Construction SUBTOTAL: $6,846,000 $ 6,735,400 $110,600 TOTAL COST DISTRIBUTION: 1 $ 6,846,000 1 $ 6,735,400 $ 110,600 This request is subject to the terms and conditions that follow and is made by the undersigned under proper authority to make such a request for the designated Municipality and upon acceptance by the State shall constitute agreement between the Municipality and the State. Signed for and in behalf of Municipality Name Title Date 2 TERMS AND CONDITIONS: 1. The initiation and accomplishment of the improvement will be subject to the applicable Federal and State regulations. 2. The Municipality will pay to the State all costs incurred by the State in connection with the improvement which exceed Federal /State financing commitments or are ineligible for Federal/State financing. 3. Funding of each project phase (preliminary engineering, real estate, construction, and other) is subject to inclusion in an approved program. Federal aid and/or State transportation fund financing will be limited to participation in the costs of the following items as specified in the estimate summary: a) The grading, base, pavement, and curb and gutter. b) Catch basins and inlets for surface water drainage of the improvement with connections to the storm sewer main. c) Construction engineering incidental to inspection and supervision of actual construction work. d) Signing and pavement marking including detour routes. e) Compensable utility adjustment. f) Storm Sewer mains necessary for the surface water drainage (does not include additional upsizing of storm sewer main requested by Municipality). g) Replacement of sidewalks and resurfacing of private driveways, necessitated by the project. h) New installations of street lighting and traffic signals or devices at the time of construction. i) Alteration of existing street lighting and traffic signal devices necessitated by the project. j) Real estate for the improvement. k) Preliminary engineering and State review services. 4. Work necessary to complete the improvement to be financed entirely by the Municipality or other utility or facility owner includes the following items: a) New installations of or alteration of sanitary sewers and connections, water, gas, electric, telephone telegraph, fire or police alarm facilities, parking meters, and similar utilities. b) Damages to abutting property due to change in street or sidewalk widths, grades, or drainage. c) Conditioning, if required, and maintenance of detour routes. 3 5. As the work progresses, the Municipality will be billed for work completed which is not chargeable to Federal / State funds. Upon completion of the project, a final audit will be made to determine the final division of costs. 6. If the Municipality should withdraw the project, it will reimburse the State for any costs incurred by the State in behalf of the project. 7. The work will be administered by the State and may include items not eligible for Federal / State participation. 8. Structure B -70 -256 (9th Avenue over US 41) will become a WisDOT owned structure and WisDOT's responsibility to maintain the integrity of the structure. 9. Retaining walls R -70 -36 & R -70 -37 will become a WisDOT owned structure and WisDOT's responsibility to inspect and maintain the integrity of the retaining walls. 10. The Municipality will at its own cost and expense: a) Maintain al portions of the project that lie within its jurisdiction for such maintenance through statutory requirements in a manner satisfactory to the State and will make ample provision for such maintenance each year. This includes any necessary maintenance of the landscaping within the center of the roundabouts after 2 -year maintenance period specified within the construction contract. No additional landscaping or structures will be allowed in the roundabout without prior approval from the Department. b) Prohibit angle parking. c) Regulate or prohibit all parking at locations where and when the pavement area usually occupied by parking vehicles will be needed to carry active traffic in the street. d) Use the WisDOT Utility Accommodation Policy unless it adopts a policy which has equal or more restrictive controls. e) Maintain clay pavers in the roundabout splitter islands that City of Oshkosh requested to be installed with the project f) Provide complete plans, specifications, and estimates for any Sanitary and Water system work the Municipality wants to let with the State's project. During construction, assume full responsibility for establishing line and grade, pressure and purification testing, and operation of the sanitary and water systems. The Municipality relieves the State and all of its employees from liability for all suits, actions, or claims resulting from the sanitary sewer and water main construction under this agreement. g) Maintain all sidewalks constructed with the project. Maintenance will include but not limited to, sidewalk repair, snow removal, ice control and future replacement ( other than future highway projects) from the sidewalk and mowing of the grass in the terrace between any roadway and the sidewalk. Maintenance will include snow removal across sidewalk on 9th Avenue structure over US 41 and all sidewalks around the roundabouts. 4 h) Maintain the pavement markings associated with the crosswalks within the project limits, which includes, but is not limited to, any necessary repainting or replacement except those caused by future highway projects. i) Maintain all street lighting within the project limits, which includes, but is not limited to, the responsibility for the energy, operation, maintenance, and replacement of the lighting system (including associated costs). j) Maintain all landscaping around the perimeter of the roundabout and in the vision corners. Landscaping in the vision corners shall not obstruct the vision of the drivers and shall be maintained at a height that will ensure a clear line of sight for the motorists and pedestrians. No landscaping or structures will be allowed in the vision corners without prior approval from the Department. k) Own and maintain irrigation system placed in the roundabouts. Once the maintenance responsibility has been transferred to the Municipality, the Department is released from any and all costs associated with the future maintenance and /or removal of the sidewalk around the perimeter of the roundabout, the roundabout landscaping, and crosswalk pavement markings. Public Convenience and Safety While performing any maintenance activities associated with this agreement, the Municipality shall comply with the following conditions. Maintain the safety of the traveling public and control traffic using warnings signs, cones, drums and flaggers. Materials and equipment cannot be stored on the right -of -way. The Department shall be notified 7 days prior to erecting any lane closures or lane restrictions. 11. Basis for Local Participation: Construction — Category 0010 — Construction of the roadway items for the project are 100% Federal /State funded. Construction — Category 0020 — Sign structures required for the roundabouts are 100% Federal /State Construction — Category 0030 — Construction of B -70 -256 9th Avenue structure over US 41 are 100% Federal /State funded. Construction — Category 0040 — Construction of R -70 -36 is 100% Federal /State Funded. Construction — Category 0050 — Construction of R -70 -37 is 100% Federal /State Funded. Construction — Category 0060 — Lighting for the roundabouts is 100% Federal /State Funded. Priority 1 Funding is L.S. $19,5000 for Community Sensitive Design for City requesting black light poles at the roundabouts. It is estimated 65 poles will be black which the black pole costs additional $300 extra per pole for total of $19,500. Construction — Category 0070 — Community Sensitive Design Items is 100% Federal /State funded and include the landscaping in all of the roundabouts at 9 1h Avenue. Construction — Category 0080— Adjustment of sanitary and water manholes are 90% Federal/State funded and 10% City of Oshkosh funded per State Statute 84.295 for adjustment of publicly owned utilities as part of freeway project. Construction — Category 0090 — Non - participating items in the contract are sealing concrete pavement joints and irrigation system and are 100% City of Oshkosh funded. 51 STATE / MUNICIPAL AGREEMENT FOR A HIGHWAY IMPROVEMENT PROJECT DATE: February 27, 2009 I.D.: 1120 -11 -75 HIGHWAY: US 41 LENGTH: 3.838 LIMITS: STH 21— US 45 COUNTY: Winnebago The signatory City of Oshkosh, hereinafter called the Municipality, through its undersigned duly authorized officers or officials, hereby requests the State of Wisconsin Department of Transportation, hereinafter called the State, to initiate and effect the highway or street improvement hereinafter described. The authority for the Municipality to enter into this agreement with the State is provided by Section 86.25(1), (2), and (3) of the Statutes. NEEDS AND ESTIMATE SUMMARY: Existing Facility (describe and give reason for request): US 41 will be reconstructed from four to six lanes from STH 26 - Breezewood Lane. US 41 has reached its capacity and upgrading capacity will meet the future needs of the travelling public along with improving safety. Proposed Improvement (nature of work): Reconstruct US 41 from STH 21 to US 45 including the reconstruction of the US 41/21 Interchange with roundabout constructed at the ramp terminals and at the intersections of STH 21 /Koeller Street & STH 21/Westowne/Brooks Lane. Describe non - participating work included in the project contract: Sealing concrete pavement joints and irrigation system. Describe other work necessary to finish the project completely which will be undertaken independently by the Municipality: Relocation of water main and sanitary sewer in conflict with project will be relocated prior to project with its own City contract. PHASE Total ESTIMATED COST Federal / State Municipal Estimated Cost Funds % Funds % Construction (Participating): Project ID 1120 -11 -75 Category 0010 — Roadway Items $83,000,000 $83,000,000 100 $ 0 0 Category 0020 — Sign Structures $ 870,000 $ 870,000 100 $ 0 0 Category 0030 — B -70 -258 $2,000,000 $2,000,000 100 $ 0 0 Category 0040 — B -70 -259 $900,000 $900,000 100 $0 0 Category 0050 — B -70 -260 $900,000 $900,000 100 $0 0 Category 0060 — B -70 -262 $3,200,000 $3,200,000 100 $0 0 Category 0070 — B -70 -263 $2,800,000 $2,800,000 100 $0 0 Category 0080 — B -70 -264 $2,400,000 $2,400,000 100 $0 0 Category 0090- B -70 -265 $9,500,000 $9,500,000 100 $0 0 Category 0100- B -70 -266 $7,900,000 $7,900,000 100 $0 0 Category 0110- B -70 -267 $2,800,000 $2,800,000 100 $0 0 Category 0120- B -70 -268 $2,400,000 $2,400,000 100 $0 0 Category 0130- B -70 -269 $7,900,000 $7,900,000 100 $0 0 Category 0140- B -70 -270 $660,000 $660,000 100 $0 0 Category 0150 B -70 -274 $400,000 $400,000 100 $0 0 Category 0160 B -70 -276 $620,000 $620,000 100 $0 0 Category 0170 R -70 -13 $1,400,000 $1,400,000 100 $0 0 Category 0180 R -70 -14 $1,420,000 $1 100 $0 0 Category 0190 R -70 -15 $340,000 $340,000 100 $0 0 Category 0200 R -70 -16 $1,200,000 $1,200,000 100 $0 0 Category 0210 R -70 -17 $750,000 $750,000 100 $0 0 Category 0220 R -70 -18 $470,000 $470,000 100 $0 0 Category 0230 R -70 -19 $470,000 $470,000 100 $0 0 Category 0240 R -70 -24 $620,000 $620,000 100 $0 0 Category 0250 R -70 -39 $520,000 $520,000 100 $0 0 Category 0300 - Community Sensitive $130,000 $130,000 100 $0 0 Design Items — Roundabout Landscaping Category 0310 — New Sidewalk — City of $20,000 $16,000 80 $4000 20 Oshkosh Category 0320 — New Trail Connection — $7,500 $6,000 80 $1500 20 Town of Algoma Category 0330 — City of Oshkosh Utility $330,000 $300,000 90 $30,000 10 Items — Water Main, Adjustment of Water Manholes and Sanitary Manholes SUBTOTAL: $ 135,927,500 $135,892,000 $ 35,500 Construction (Non- Participating): Category 0340 — Non - Participating — $ 50,000 $ 0 0 % $50,000 100% Sealing Concrete Joints & Irrigation System Construction SUBTOTAL: $135,977,500 $135,892,000 $85,500 TOTAL COST DISTRIBUTION: $ 135,977,500 $135,892,000 $85,500 2 This request is subject to the terms and conditions that follow and is made by the undersigned under proper authority to make such a request for the designated Municipality and upon acceptance by the State shall constitute agreement between the Municipality and the State. Signed for and in behalf of Municipality Title Date Name TERMS AND CONDITIONS: 1. The initiation and accomplishment of the improvement will be subject to the applicable Federal and State regulations. 2. The Municipality will pay to the State all costs incurred by the State in connection with the improvement which exceed Federal /State financing commitments or are ineligible for Federal /State financing. 3. Funding of each project phase (preliminary engineering, real estate, construction, and other) is subject to inclusion in an approved program. Federal aid and /or State transportation fund financing will be limited to participation in the costs of the following items as specified in the estimate summary: a) The grading, base, pavement, and curb and gutter. b) Catch basins and inlets for surface water drainage of the improvement with connections to the storm sewer main. c) Construction engineering incidental to inspection and supervision of actual construction work. d) Signing and pavement marking including detour routes. e) Compensable utility adjustment. f) Storm Sewer mains necessary for the surface water drainage (does not include additional upsizing of storm sewer main requested by Municipality). g) Replacement of sidewalks and resurfacing of private driveways, necessitated by the project. h) New installations of street lighting and traffic signals or devices at the time of construction. i) Alteration of existing street lighting and traffic signal devices necessitated by the project. 4. Work necessary to complete the improvement to be financed entirely by the Municipality or other utility or facility owner includes the following items: a) New installations of or alteration of sanitary sewers and connections, water, gas, electric, telephone telegraph, fire or police alarm facilities, parking meters, and similar utilities. 5. As the work progresses, the Municipality will be billed for work completed which is not chargeable to Federal / State funds. Upon completion of the project, a final audit will be made to determine the final division of costs. 6. If the Municipality should withdraw the project, it will reimburse the State for any costs incurred by the State in behalf of the project. 7. The work will be administered by the State and may include items not eligible for Federal / State participation. 8. All structures constructed with this project will become a WisDOT owned structure and WisDOT's responsibility to maintain the integrity of the structure. 9. All retaining walls constructed with this project will become a WisDOT owned structure and WisDOT's responsibility to inspect and maintain the integrity of the retaining walls. 10. The Municipality will at its own cost and expense: a) Maintain all portions of the project that lie within its connecting highway limits which remain east of US 41/21 ramps for such maintenance through statutory requirements in a manner satisfactory to the State and will make ample provision for such maintenance each year. This includes any necessary maintenance of the landscaping within the center of roundabout after the 2 -year maintenance period specified within the construction contract. b) Prohibit angle parking. c) Regulate or prohibit all parking at locations where and when the pavement area usually occupied by parking vehicles will be needed to carry active traffic in the street. d) Use the WisDOT Utility Accommodation Policy unless it adopts a policy which has equal or more restrictive controls. e) Maintain clay pavers in the roundabout splitter islands that City of Oshkosh requested to be installed with the project f) Provide complete plans, specifications, and estimates for any Sanitary and Water system work the Municipality wants to let with the State's project. During construction, assume full responsibility for establishing line and grade, pressure and purification testing, and operation of the sanitary and water systems. The Municipality relieves the State and all of its employees from liability for all suits, actions, or claims resulting from the sanitary sewer and water main construction under this agreement. g) Maintain all sidewalks constructed with the project except those along the north side of STH 21 between the roundabout at STH 21 /Brooks Lane and the roundabout at the US 41 SB exit ramp /STH 21 which abut the Town of Algoma boundary. Maintenance will include but not limited to, sidewalk repair, snow removal, ice control and future replacement (other than future highway projects) from the sidewalk and mowing of the grass in the terrace between any roadway and the sidewalk. Maintenance will include snow removal across sidewalk on STH 21 structure over and all sidewalks around all of the roundabouts. h) Maintain the pavement markings associated with the crosswalks within the project limits, which includes, but is not limited to, any necessary repainting or replacement except those caused by future highway projects. i) Maintain all street lighting within the City connecting highway limits, which is that portion of the project east of the US 41/21 northbound ramps. Maintenance includes, but is not limited to, the responsibility for the energy, operation, maintenance, and replacement of the lighting system (including associated costs). j) Maintain all landscaping around the perimeter of the roundabout and in the vision corners. Landscaping in the vision corners shall not obstruct the vision of the drivers and shall be maintained at a height that 5 will ensure a clear line of sight for the motorists and pedestrians. No landscaping or structures will be allowed in the vision corners without prior approval from the Department. Once the maintenance responsibility has been transferred to the Municipality, the Department is released from any and all costs associated with the future maintenance and/or removal of the sidewalk around the perimeter of the roundabout, the roundabout landscaping, and crosswalk pavement markings. Public Convenience and Safety While performing any maintenance activities associated with this agreement, the Municipality shall comply with the following conditions. Maintain the safety of the traveling public and control traffic using warnings signs, cones, drums and flaggers. Materials and equipment cannot be stored on the right -of -way. The Department shall be notified 7 days prior to erecting any lane closures or lane restrictions. Basis for Local Participation: Construction — Category 0010 — Construction of the roadway items for the project are 100% Federal /State funded. Construction — Category 0020 — Sign structures required for the roundabouts are 100% Federal/State funded. Construction — Category 0030 — Construction of B -70 -258 STH 21 structure over US 41 is 100% Federal /State funded. Construction — Category 0040 Construction — Category 0050 Construction — Category 0060 Construction — Category 0070 Construction — Category 0080 Construction — Category 0090 Construction — Category 0100 Construction — Category 0110 Construction — Category 0120 Construction — Category 0130 Construction — Category 0140 Construction — Category 0150 Construction — Category 0160 Construction — Category 0170 Construction — Category 0180 Construction — Category 0190 Construction — Category 0200 Construction — Category 0210 Construction — Category 0220 Construction — Category 0230 Construction — Category 0240 Construction — Category 0250 Construction of B -70 -259 is 100% Federal /State funded. Construction of B -70 -260 is 100% Federal /State funded. Construction of B -70 -262 is 100% Federal /State funded. Construction of B -70 -263 is 100% Federal /State funded. Construction of B -70 -264 is 100% Federal /State funded. Construction of B -70 -265 is 100% Federal /State funded. Construction of B -70 -266 is 100% Federal /State funded. Construction of B -70 -267 is 100% Federal/State funded. Construction of B -70 -268 is 100% Federal/State funded. Construction of B -70 -269 is 100% Federal/State funded. Construction of B -70 -270 is 100% Federal/State funded. Construction of B -70 -274 is 100% Federal/State funded. Construction of B -70 -276 is 100% Federal/State funded. Construction of R -70 -13 is 100% Federal/State funded. Construction of R -70 -14 is 100% Federal /State funded. Construction of R -70 -15 is 100% Federal /State funded. Construction of R -70 -16 is 100% Federal /State funded. Construction of R -70 -17 is 100% Federal /State funded. Construction of R -70 -18 is 100% Federal /State funded. Construction of R -70 -19 is 100% Federal /State funded. Construction of R -70 -24 is 100% Federal /State funded. Construction of R -70 -39 is 100% Federal /State funded. 0 Construction — Category 0300 — Community Sensitive Design Items is 100% Federal /State funded and include the landscaping in all of the roundabouts on STH 21. Construction — Category 0310 — Per WisDOT policy, construction of new sidewalk in areas where it does not exist today is 80% Federal /State funded and 20% City of Oshkosh funded. This includes the sidewalk along the south side of STH 21. Construction — Category 0320 - Per WisDOT policy, construction of new trail connection is 80% Federal /State and 20% Town of Algoma funded. Participation is based on 5' wide trail connection by 500 feet long from Station 115 + -00 to 120 + -00 along north side of STH 21 west of US 41. Construction — Category 0330 — Installation of new water main, adjustment of sanitary and water manholes are 90% Federal /State funded and 10% City of Oshkosh funded per State Statute 84.295 for adjustment of publicly owned utilities as part of freeway project. Construction — Category 0340 — Non - participating items in the contract are sealing concrete pavement joints east of US 41 ramps in the connecting highway limits and irrigation system and are 100% City of Oshkosh funded.