Loading...
HomeMy WebLinkAbout0099040-BuildingOSHKOSH ON THE WATER Job Address Designer Category Type 1906 MITCHELL ST 110 - New Single Family CITY OF OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD Owner ViENOLA BROS. Contractor VIENOLA BROS. · Building O Sign O Canopy O Fence O Raze No 0099040 Create Date 10/08/2002 Plan Dl-148-1002R Zoning R-1 Unfinished/Basement Finished/Living Garage Foundation Occupancy Permit Park Dedication Class of Const: 8 1120 Sq. Ft. Rooms 5 1120 Sq. Ft. Bedrooms 2 576 Sq. Ft. Baths 1 · Poured Concrete (~ Floating Slab O Pier O Concrete Block (~ Post O Treated Wood Required Flood Plain No Required # Dwelling Units 1 Height 17 Ft. Stories 1 O Other Size 28' x 40' [] Projection Canopies Signs Height Permit Not Required # Structures I Use/Nature NSFPJ New single family 1 story with 2 car detached garage and a 5' x 16' covered porch. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By:~.~ ~% GRANT SCHULTZ HEATING & COOLING SCHAFER ELECTRIC INC Plumbing Contractor O'NEILL ENTERPRISE INC $85,000.00 Plan Approval $75.00 Permit Fee Paid $625.00 Park Dedication $100.00 Date 12/11/2002 FinallO.P. 00/00/0000 [] Permit Voided I In the perfq~ance this wo gr to p orm all work pu uant to rules governing the described construction. Signatur ~ ~. ~-----~ ~ ' -- Agent/Owner' Date Address PO BOX 8042 OSHKOSH WI 54903 - 8042 Telephone Number 303-0934 OSHKOSH ON THE WATER GRADE STAKE FORM Grade Stake Number 6831 Name VIENOLA BROS. Address 1906 MITCHELL ST Create Date 10/08/2002 Lot 8 Block Ward Subdivision Algoma Park Zone Street Number Lot Dimensions [] Sidewalk Existing Building Grade Elevation Stakes Set At Site 10/08/2002 Set By D.W.G. /// Depa~ment of Publ~_~.W. orks I, the undersigned, owner or agent of the above described property agree to ha/~e gr~e~e~t~b 'J~b-efore ~x~qavation Wisconsin Department of Industry, Labor and Human Relations Safety and Buildings Division P,O. Box 2509 Madison, WI 53701-2509 Wisconsin Statues 101.63, 101.73 Owner's Name VIENOLA BROS. Contractor: ~ Con~--1 EIoc'~ VIENOLA BROS. Contractor: SCHAFER ELECTRIC INC Contractor: GRANT SCHULTZ HEATING & COOLING Contractor: I I Con Building Address 1906 MITCHELL ST WISCONSIN UNIFORM BUILDING PERMIT APPLICATION Lot Area Application No. 0099040 Parce No. [] Constr [] HVAC [] Elec [] Plbg [] Erosion [] Other: Mailing Address P.O. BOX 8042 Oshkosh WI 54901 - 0000 Mailing Address PO BOX 8042 Telephone No. Telephone No. 303-0934 . OSHKOSH WI 54903 - 8042 Mailing Address Telephone No. 6364 COUNTY ROAD A NEENAH WI 54956 - 0 (920) 725-2031 Mailing Address Telephone No. 1411 S MAIN ST Oshkosh WI 54902 - 0 (920) 216-1616 Mailing Address Telephone No. CTY RD N PICKETT WI 54964 - 0 428-4700 589-: 1/4, 1/4,Section ,T N,R E(or)W Subdivision Name Lot No. Block No. Aigoma Park 8 District(s) Permit No. Front Rear Left Right New [] Repair Single Family Entrance Panel Forced Air Fumace Fuel [] Alteration [] Raze Two Family Size: [] Radiant Baseboard or Panel [] Addition Garage Servi~e: [] Heat Pump Space Htg [] Move [] Other (print): [] Overhead [] Boiler Water Htg [] Other: [] Underground [] Central Air Conditioning unit will have 3 kilowatt or Other more installed electric space heating [] Site Constructed Concrete Unfinished [] Manufactured [] Masonry Infiltration control option is: [] Full sealing Sewer ofj°ints. [] Blower door test. [] Exterior Basement 1120 Sq. ft. [] Treated Wood [] Municipal air infiltration barrier. Living Area 1120 Sq. ft. 1-Story [] Septic [] 2-Story Permit No. Envelope 20863 BTU/HR Garage 576 Sq. ft. [] Other [] Seasonal Infiltration 13709 BTU/HR ..... [] Municipal Utility Other ' Well $105,000.00 with the conditions of this permit, understands that the issuance of certifies that all the above information is accurate. The applicant agrees to comply with all the permit creates no legal liability, APPLICANT'S SIGNATURE DATE SIGNED This permit is issued pursuant to the following conditions. Failure to comply may result in suspension or APPROVAL CONDITIONS revocation of this permit or other penalty SEE "STANDARD CONDITIONS OF APPROVAL" SHEET [] Town [] Village [] City [] County LJ state of: Municipality Number of Dwelling Location: CityOf Oshkosh 7 0 - 2 6 6 Plan Review $75.00 Construction HVAC Name JOHN ZAP, ATE Inspection Electrical Wis. Permit Seal $30.00 [] Plumbing Date 10/17/02 Other [] Erosion Total $105.00 275825 Cert. No. 70330 SBD-5823(R. 07/92) OSHKOSH ON THE WATER Job Address PARKLAND DEDICATION FEE COLLECTION RECORD 1906 MITCHELL ST VIENOLA BROS. Date 12/11/2002 Name Address P.O. BOX 8042 Oshkosh WI 54901 Subdivision Algoma Park Lot 8 Building Permit Number 0099040 Number of Dwelling Units 1 Fee Required ~//~ ~;~ 00.00 .... ~ -----F~ee Paid Owner's Signature Inspector's Signature Number of Structures Date Date CITY OF OSHKOSH STANDARD CONDITIONS OF APPROVAL Project Address Permit # Please read the following information and sign at the bottom to acknowledge that you have read and agree to comply with these conditions. All habitable rooms must be provided with 8% light and 3.5% ventilation. Bedrooms located on the second floor or below ground level must be provided with egress windows in addition to the light and ventilation requirements. Basement windows are also required to have window well areas in accordance with ILHR 21.03. Garage spaces shall be separated from the dwelling unit in accordance with ILHR 21.082 The door and frame assembly between the dwelling unit and an attached garage shall be labeled by an independent testing agency as having 'a minimum fire-resistive rating of 20 minutes. All drywall joints are required tobe taped/sealed unless the joints are fitted so that the gap is no more than a dimes thickness (1/20-inch) and backed by solid wood or drywall with the joints staggered. All penetrations in exterior walls must be sealed prior to the insulation inspection/ This includes holes in the top and bottom plates, gaps around heating ducts, and holes in the return air spaces. Smoke detectors are required on every floor and within 6' of all bedrooms. The smoke detectors are required to be hardwired and interconnected, Hydromassage tubs are required to have an access panel to motor. The access panel must be accessible without removing the finish of the house. o All overframing must be designed by the truss manufacturer, according to standards set by the truss plate institute, or structural calculations must be provided prior to the rough building inspection. 7. Truss plans must be submitted and approved prior to framing the roof. Truss plans including the tress layout must be provided on site at the rough building inspection. In addition to the truss plans, microlam calculations must be provided on site at the rough building inspection for all microlams with point loads on them. Calculations must be provided, for all Cantilevered floors with point loads. Floor trusses and TJI's must be designed for the cantilevered areas. 10. The property owner and applicant is responsible for compliance with ILHR 21.125 (Erosion Control). When installing access drives, a minimum of 2"-3" diameter stone is required in addition to a minimum of 6" depth, 30'-5ff length, and 14'-20' width. Erosion control measures must be maintained until the lawn is established. 11. All storm sewer inlets must be protected with approved erosion control devices. Tracking (i.e. sediment) must be removed from the street at the end of each workday, Repair any siltation or erosion damage to adjoining surfaces and drainageways resulting from land. development or disturbing activities. 12. The building placard must be posted on site at all times. Once the rough framing is up the placard must be posted on the patio door or on a kitchen windOw. If the placard is not present at any inspection, stop work orders will be posted. Additional placards can be obtained through our department: if the cards are misplaced. 13. All mechanicals must be roughed in prior to requesting the rough building inspection. If on the inspection the mechanicals are notroughed in, the inspection will fail and a $100 re-in, sPection fee will be charged. 14. Attached is a copy of the final inspection checklist. At the final inspection all items on this list must be completed to avoid the $100 re-inspection fee per inspection. 15. When requesting final inspections please note that a minimum of 2 days notice is needed from the time.the inspection is ready. Furniture is only allowed to be placed in the center of the garage floor and a minimum of a 3' pathway must be provided around the walls of the garage. At the final inspection no furniture or personal belongings are allowed in the house. Appliances such as the stove, refrigerator,, washer, and dryer are not to be set in place due to the el~ctrical inspector needing to look at the power serving the appliances. A 6' stepladder must be on site 'at the final inspection to provide access to the attic. 16. The building placard must remain on the patio door .or on a kitchen window until occupancy is approved: Occupancy is not alloWed prior to the placard having all of the final inspection approved stickers on the backside. If occupancy occurs prior to the inspections being approved daily citations will be issued with no further notice being given. 17. All site grading must be,done in ac/ordance ~ith the approved drainage plan on file in the public works office, 3~~/~ NE Corner Mitchell St./ Columbia Ave. O~HKOfH City of Oshkosh Communi~ Development Scalo: ~"= 20' 4 0 4 8 ~2 ~ 20 Foot N DISC~IMER This map Is neither a l~ly re~rd~ map nor a su~w and It ~ ~ot Inte~ed to be u~ ~ on~ sponsible for any inaccuraci~ her~n If ~repen~ are foun~ pl~e ~n~ Ci~ of ~hkosh. Soptombor 23, 2002 By: JN Source: Ci~ of Oshkosh GIS