Loading...
HomeMy WebLinkAbout0135134-Plumbing (dishwasher)0 OSHKOSH ON THE WATER Job Address 1150 SAWTELL CT Contractor SOPER PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use /Nature of Work CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner CRAIG &JUSTINE S LARSON No 135134 Create Date 03/13/2009 Category 411 - Res - Interior (Replacement Fixtures) Plan Shower Water Softner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest Flr/Wst Sink Lndry Tray Clothes Wshr Exam Sink Catch Basin Disposal Bidet Sculry Sink Wash Ftn Dishwasher 1 Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector /Grind Drink Ftn Sery Sink Soda Disp Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Valuation ,—, $800.00 Plan Approval $0.00 Permit Fees Issued By $25.00 ❑ Permit Voided Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 2225 BURNWOOD DR OSHKOSH Parcel Id # 1608650700 Date 03/13/2009 WI 54902 -9003 Telephone Number 426 -2151 To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.