HomeMy WebLinkAbout1999-Certificate of Occupancy~~
31
6 ~ 5
HVAC GENERAL NOTES:
1. CONTRACTOR SHALL PROVIDE COMPLETE CONTRACTING SERVICES INCLUDING HEATING, VENTIUTINC,
AND NR-CONDITIONING WORK AND CONTROL WORK.
2. ALL WORK SHALL BE GUARANTEED FOR DNE YEAR FROM DATE OF ACCEPTANCE.
3, SEE DRAWINGS FOR SCHEDULES.
4. DUCT STIES SHOWN ARE iNS10E DIMENSIONS.
5. VERIFY LOGTION OF ALL THERMOSTATS.
6, 00 NOT FABRIGTE DUCTWORK WITHOUT FIELD CHECKING CLEARANCES.
7. SEAL NRTICHT BETWEEN ALt DAPPER FRAMES AND DUCTWORK.
8. PROVIDE ORNN FOR SEALED COMBUSTION EOUIPYENT,
9. PROVDE BETWEEN 8`-O" (MIN.) AND B'-O" (YAx.) OF LOw PRESSURE FLEx18LE DUCT TO DIFFUSERS
UNLESS OTHERWISE SPECIFIED,
10. PROVIDE A MANUAL VOLUME DAPPER IN EACH DUCT TAKE-Off AS SHOWN ON THE PUNS.
il. COORDINATE GRILLE AND DIFFUSER LOGTN)NS AND TYPES WITH LIGHTING UYOUT AND CEILING TILES.
12. CUT NEW ROOF OPENINGS AS REQUIRED. COOPERATE WITH ROOFING CONTRACTOR. INSTALL NEW ROOF
CURBS AS SOON AS POSSIBLE AND PRONOE TEMPORARY CAP TO PREVENT DAMAGE TO BUILDING.
13. COMBUSTON NR INTAKES ANO EXHAUST TD RE INSTALLED PER WISCONSIN STATE CODES AND
MANUFACTURER'S GUIDELINES.
14, ALL OUTSIDE NR INTAKES TO HAVE MOTORIZED DAPPER AND BE A MINIMUM OF 10 FEET FROM
ANY BUILDING E%HAUST.
15. INSUUTE ALL OUTSIDE NR, SUPPLY NR AND RETURN NR DUCTWORK TO PREVENT CONDENSATKN4.
16. VERIFY LOGTION OF CONDENSING UNITS WRH OWNER AND/OR ARCHITECT.
17. ALL SUSPENDED EWIPYENT TO BE INSTA.LED A MINIMUM OF B FEET A.F.F.
1B, PER STATE CODES EFFECTNE APRIL 1, 1997: THERMOSTATIC CONTROLS MUST MEET THE SETPgNT
ADJUSTMENT REQUIREMENTS: HUTING DOWN TO 55 DEG. F., COOLING SETPOINTS UP TO B5 DEG. F.
AND DEADBANDS OF 5 ~G. F. MINIMUM. SEE ILHR 63.26 22. SEAL ALL DUCTWORK ACCORDING TO
ASHRAE ANO SMACNA STANDARDS. LOW AND MEDNY PRESSURE SUPPLY DUCTWORK WHICH IS LOGTED
OUTSIDE THE CONDITIONED SPACE SHALL ~ SEALED IN ACCORDANCE MATH SYACNA STANDARDS.
SEE ILHR 63.34
T9. A BAUNCINC AGENCY SHALL BE RESPONSIBLE FOR BALANCING OF THE SYSTEMS. A BALANCING REPORT
SHALL BE RETAINED AT THE SITE AND SHALL BE MADE AVNUBLE FDR INSPECTION. BAUNCING SHALL BE
DONE ACCORDING TO THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) PROCEDURAL STANDARDS,
THE ASSOCIATED NR BALNVCE COUNgL (AABC) NATIONAL STANDARDS OR EOUNALENT BALANCING PROCEDURES.
20. OPERATOC AND YNNTENNVCE MANUALS SHALL BE PROVIDED TO THE BUILDING OWNER OR OPERATOR UPON
COMPLETN)N OF TI# PROJECT. THIS MANUAL SHALL INCLUDE BASIC DATA REUTED TO THE OPERATION AND
MAINTENANCE OF FNAC SYSTEMS AND EQUIPMENT. REOUREO ROUTINE MAINTENANCE ACTIONS SHALL BE
CLEARLY IDENTIFIED, FNAC CONTROLS INFORMATION SUCH AS DuIGRAMS, SCHEMATICS, CONTROL SEQUENCE
DESCRIPTIONS, AND MNNTENANCE AND CALIBRATION INFORWTN)N SHALL BE INCLUDED. PROVIDE ASSOCIATED
RECOMMENDED SPARE PARTS LIST.
21. HVAC CONTROLS SHAH BE TESTED TO ASSURE THAI CONTROL ELEMENTS ARE CALIBRATED, ADJUSTED, AND
IN PROPER WORKING CONDITION.
tp"/ OUTSIDEy FILTER 10"x10"
NR INTAKE ^I ~ NAT. CAS FROM ABOVE ~ U
I` P 1
I
I
I
I
i
I -
I -
i --
i
PROVIDE 8"x8" SLEEVE i I 380
THROUGH FLOOR
41
I ~~
I ~
t
FIRST FLOOR OFFICE HVAC PLAN O
6 5
4 ~ 3 ~ 1 ~ 7
AIR COOLED CONDENSING UNITS
COMPRESSOR CONDENSER
NOM. % CAP YIN ENT FA NS VIBRA TKM! 45gATORS
UNIT
N0.
SERVICE N0. OF
COMPRESS. MOTOR
RPM
~'
TONS SUCT.
TEMP. REF.
TYPE .
STEP OF
REDUCTION .
CIRC.
AMPS
YOLTAGE CFM OF
. ~ .
JUR
TEMP.
N0.
DIR. MOTOR
HP FAN
TYPE
DRIVE
SUPPORT
TYPE
MIN. STAIN:
pEFLECTION
MANUF. YODEL
CU-I LOWER LEVEL 1 4 R-22 -- 30 230/1/80 4025 95 1 26 1/4 PROP. DIRECT TRANE TTP048C10DA
CU-2 UPPER LEVEL 1 5 R-22 -- 37 230/1/80 3800 95 1 26 1/4 PROP. DIRECT TRANE TTP060C100A
GAS FRED FURNACE SCHEDULE
AIR HANDLING DATA ELECTRICAL CHAR. HEATING COOLING
N0~ SERVICE LOGTION
CFY
SUPPLY
CFY
O.A. EXT.
58.
VOLTS
PHAS
N.P.
MBH
INPUT
YBH
OUTPUT
FUEL
SUPPLY
PRESS.
INLET
PRESS.
MBH
NOM.
TONS
EER OF R
~ ACTU ER OE N0.
MN) L REMARKS
F-1 LOWER LEVEL MANUFACTURING 111 1760 275 0.5" 120 1 3/4 100 92 NAT.CAS 47.5 4 10,6 TRANS TUX1000948 COOLING COIL:TXC048A4
f-2 UPPER LEVEL MANUFACTURING 111 1887 275 0.5" 120 1 J/4 100 92 NAT.GAS 53.5 5 9.B TRANE TUX1000980 COOLING COIL:TXC06DM
CE=ICING DIFFUSER SCHEDULE
UNIT IYPE~
30f1-
~CFM
NOTE: PROVIDE ALL AIA DIFFUSERS WITH OPPOSED BLADE VOLUME DAMPERS
ALL DIFFUSER NECK SIZES ARE SAYE A BRANCH DUCT SIZE.
TYPE
THROW
FINISH MOUNTING
P
L
N0.
UY-IN
SURFACE ~~ MANUF, MODEL
CD-1 4-WAY WHITE % 24"x24" KRUECER SHR
AIR REGISTER AND GRILLE SCHEDULE
USE
SUPPLY REGISTER - SR SUPPLY GRILLE - SO ~---~-'-NECK 512E
RETURN REgSTEA - RR RETURN GRILLE = RG 8 X 8
EXHAUST REgSTER - EA EXHAUST GRILLE - EG ER-1
TRANSFER GRILLE - TO 30~
UNIT N0.
CFN
USE
NOTE: PROVIDE ALL REgSTER4 WITH OPPOSED BUDS VOLUME CONTROL DAPPER
FINISH MOUNTING
ND LOGTKIN - MANUF. YODEL
UY-IN SURFACE SIOEWALI
RC-1 SEE PLANS % %RUEGER EGC-5
TC-1 SEE PLANS X KRUECER S SBS H
EC-1 SEE PLANS % KRUEGER EGC=S
NOTE: SEE PLANS FOR OLVJiTRIES AND STIES..
ROOF EXHAUSTERS
UNIT
N0.
SERVICE CFY OF
.STD.
AIR FAN
DUI. MAX.
T,S. ' S"P
IN IN.
WATER MOTDA
NP
ORNE BACKDAAFT
DAMPER
MANUf. YODEL
PRV-1 TOILETS 150 B" 2750 .25 1/20 DIRECT YES PENN VENTIUTOR
PRV-2 VESTIBULE 101 400 B` 3024 .25 120 DIRECT YES PENN VENTIUTOR
CURR AND ROOF OPENING DIM. TO BE FURN, TO GEN. CONTR, BY THE MECH, CONTR.
I
I
i
I
I
I
i
I
i
10'x10" i i
UP TO I
P.B~L-Y ~ 285
400 i
12/8 I
OPN'C ~
IN BOTTOM I
OF 10/10 j
EXH. DUCT
~~
150
NOTE: INSTALL DUCTWORK TO PRV NAT. CAS GOWN TO F~ CONNECT NEW NAT. CAS LINE TO EXISTING,
SO AS TO AVOID WINDOWS. POINT OF CONNECTN)N IS APPROIOMATELY
20x10 FILTER 3B' EAST AND 68' NORTH,
20"z24" G PROVIDE PRESSURE REGUUTORS,
14 14 C
i-1D"II OA INTAKE
SECOND FLOOR OFFICE HVAC PLAN O
4 3
2
J A
IE
IC
~C
E
itti ailtrA1zfa '%0 0
TC CIE ~-;»,
w~rTr rAx 7to-wti
...... ....