Loading...
HomeMy WebLinkAbout1999-Certificate of Occupancy~~ 31 6 ~ 5 HVAC GENERAL NOTES: 1. CONTRACTOR SHALL PROVIDE COMPLETE CONTRACTING SERVICES INCLUDING HEATING, VENTIUTINC, AND NR-CONDITIONING WORK AND CONTROL WORK. 2. ALL WORK SHALL BE GUARANTEED FOR DNE YEAR FROM DATE OF ACCEPTANCE. 3, SEE DRAWINGS FOR SCHEDULES. 4. DUCT STIES SHOWN ARE iNS10E DIMENSIONS. 5. VERIFY LOGTION OF ALL THERMOSTATS. 6, 00 NOT FABRIGTE DUCTWORK WITHOUT FIELD CHECKING CLEARANCES. 7. SEAL NRTICHT BETWEEN ALt DAPPER FRAMES AND DUCTWORK. 8. PROVIDE ORNN FOR SEALED COMBUSTION EOUIPYENT, 9. PROVDE BETWEEN 8`-O" (MIN.) AND B'-O" (YAx.) OF LOw PRESSURE FLEx18LE DUCT TO DIFFUSERS UNLESS OTHERWISE SPECIFIED, 10. PROVIDE A MANUAL VOLUME DAPPER IN EACH DUCT TAKE-Off AS SHOWN ON THE PUNS. il. COORDINATE GRILLE AND DIFFUSER LOGTN)NS AND TYPES WITH LIGHTING UYOUT AND CEILING TILES. 12. CUT NEW ROOF OPENINGS AS REQUIRED. COOPERATE WITH ROOFING CONTRACTOR. INSTALL NEW ROOF CURBS AS SOON AS POSSIBLE AND PRONOE TEMPORARY CAP TO PREVENT DAMAGE TO BUILDING. 13. COMBUSTON NR INTAKES ANO EXHAUST TD RE INSTALLED PER WISCONSIN STATE CODES AND MANUFACTURER'S GUIDELINES. 14, ALL OUTSIDE NR INTAKES TO HAVE MOTORIZED DAPPER AND BE A MINIMUM OF 10 FEET FROM ANY BUILDING E%HAUST. 15. INSUUTE ALL OUTSIDE NR, SUPPLY NR AND RETURN NR DUCTWORK TO PREVENT CONDENSATKN4. 16. VERIFY LOGTION OF CONDENSING UNITS WRH OWNER AND/OR ARCHITECT. 17. ALL SUSPENDED EWIPYENT TO BE INSTA.LED A MINIMUM OF B FEET A.F.F. 1B, PER STATE CODES EFFECTNE APRIL 1, 1997: THERMOSTATIC CONTROLS MUST MEET THE SETPgNT ADJUSTMENT REQUIREMENTS: HUTING DOWN TO 55 DEG. F., COOLING SETPOINTS UP TO B5 DEG. F. AND DEADBANDS OF 5 ~G. F. MINIMUM. SEE ILHR 63.26 22. SEAL ALL DUCTWORK ACCORDING TO ASHRAE ANO SMACNA STANDARDS. LOW AND MEDNY PRESSURE SUPPLY DUCTWORK WHICH IS LOGTED OUTSIDE THE CONDITIONED SPACE SHALL ~ SEALED IN ACCORDANCE MATH SYACNA STANDARDS. SEE ILHR 63.34 T9. A BAUNCINC AGENCY SHALL BE RESPONSIBLE FOR BALANCING OF THE SYSTEMS. A BALANCING REPORT SHALL BE RETAINED AT THE SITE AND SHALL BE MADE AVNUBLE FDR INSPECTION. BAUNCING SHALL BE DONE ACCORDING TO THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) PROCEDURAL STANDARDS, THE ASSOCIATED NR BALNVCE COUNgL (AABC) NATIONAL STANDARDS OR EOUNALENT BALANCING PROCEDURES. 20. OPERATOC AND YNNTENNVCE MANUALS SHALL BE PROVIDED TO THE BUILDING OWNER OR OPERATOR UPON COMPLETN)N OF TI# PROJECT. THIS MANUAL SHALL INCLUDE BASIC DATA REUTED TO THE OPERATION AND MAINTENANCE OF FNAC SYSTEMS AND EQUIPMENT. REOUREO ROUTINE MAINTENANCE ACTIONS SHALL BE CLEARLY IDENTIFIED, FNAC CONTROLS INFORMATION SUCH AS DuIGRAMS, SCHEMATICS, CONTROL SEQUENCE DESCRIPTIONS, AND MNNTENANCE AND CALIBRATION INFORWTN)N SHALL BE INCLUDED. PROVIDE ASSOCIATED RECOMMENDED SPARE PARTS LIST. 21. HVAC CONTROLS SHAH BE TESTED TO ASSURE THAI CONTROL ELEMENTS ARE CALIBRATED, ADJUSTED, AND IN PROPER WORKING CONDITION. tp"/ OUTSIDEy FILTER 10"x10" NR INTAKE ^I ~ NAT. CAS FROM ABOVE ~ U I` P 1 I I I I i I - I - i -- i PROVIDE 8"x8" SLEEVE i I 380 THROUGH FLOOR 41 I ~~ I ~ t FIRST FLOOR OFFICE HVAC PLAN O 6 5 4 ~ 3 ~ 1 ~ 7 AIR COOLED CONDENSING UNITS COMPRESSOR CONDENSER NOM. % CAP YIN ENT FA NS VIBRA TKM! 45gATORS UNIT N0. SERVICE N0. OF COMPRESS. MOTOR RPM ~' TONS SUCT. TEMP. REF. TYPE . STEP OF REDUCTION . CIRC. AMPS YOLTAGE CFM OF . ~ . JUR TEMP. N0. DIR. MOTOR HP FAN TYPE DRIVE SUPPORT TYPE MIN. STAIN: pEFLECTION MANUF. YODEL CU-I LOWER LEVEL 1 4 R-22 -- 30 230/1/80 4025 95 1 26 1/4 PROP. DIRECT TRANE TTP048C10DA CU-2 UPPER LEVEL 1 5 R-22 -- 37 230/1/80 3800 95 1 26 1/4 PROP. DIRECT TRANE TTP060C100A GAS FRED FURNACE SCHEDULE AIR HANDLING DATA ELECTRICAL CHAR. HEATING COOLING N0~ SERVICE LOGTION CFY SUPPLY CFY O.A. EXT. 58. VOLTS PHAS N.P. MBH INPUT YBH OUTPUT FUEL SUPPLY PRESS. INLET PRESS. MBH NOM. TONS EER OF R ~ ACTU ER OE N0. MN) L REMARKS F-1 LOWER LEVEL MANUFACTURING 111 1760 275 0.5" 120 1 3/4 100 92 NAT.CAS 47.5 4 10,6 TRANS TUX1000948 COOLING COIL:TXC048A4 f-2 UPPER LEVEL MANUFACTURING 111 1887 275 0.5" 120 1 J/4 100 92 NAT.GAS 53.5 5 9.B TRANE TUX1000980 COOLING COIL:TXC06DM CE=ICING DIFFUSER SCHEDULE UNIT IYPE~ 30f1- ~CFM NOTE: PROVIDE ALL AIA DIFFUSERS WITH OPPOSED BLADE VOLUME DAMPERS ALL DIFFUSER NECK SIZES ARE SAYE A BRANCH DUCT SIZE. TYPE THROW FINISH MOUNTING P L N0. UY-IN SURFACE ~~ MANUF, MODEL CD-1 4-WAY WHITE % 24"x24" KRUECER SHR AIR REGISTER AND GRILLE SCHEDULE USE SUPPLY REGISTER - SR SUPPLY GRILLE - SO ~---~-'-NECK 512E RETURN REgSTEA - RR RETURN GRILLE = RG 8 X 8 EXHAUST REgSTER - EA EXHAUST GRILLE - EG ER-1 TRANSFER GRILLE - TO 30~ UNIT N0. CFN USE NOTE: PROVIDE ALL REgSTER4 WITH OPPOSED BUDS VOLUME CONTROL DAPPER FINISH MOUNTING ND LOGTKIN - MANUF. YODEL UY-IN SURFACE SIOEWALI RC-1 SEE PLANS % %RUEGER EGC-5 TC-1 SEE PLANS X KRUECER S SBS H EC-1 SEE PLANS % KRUEGER EGC=S NOTE: SEE PLANS FOR OLVJiTRIES AND STIES.. ROOF EXHAUSTERS UNIT N0. SERVICE CFY OF .STD. AIR FAN DUI. MAX. T,S. ' S"P IN IN. WATER MOTDA NP ORNE BACKDAAFT DAMPER MANUf. YODEL PRV-1 TOILETS 150 B" 2750 .25 1/20 DIRECT YES PENN VENTIUTOR PRV-2 VESTIBULE 101 400 B` 3024 .25 120 DIRECT YES PENN VENTIUTOR CURR AND ROOF OPENING DIM. TO BE FURN, TO GEN. CONTR, BY THE MECH, CONTR. I I i I I I i I i 10'x10" i i UP TO I P.B~L-Y ~ 285 400 i 12/8 I OPN'C ~ IN BOTTOM I OF 10/10 j EXH. DUCT ~~ 150 NOTE: INSTALL DUCTWORK TO PRV NAT. CAS GOWN TO F~ CONNECT NEW NAT. CAS LINE TO EXISTING, SO AS TO AVOID WINDOWS. POINT OF CONNECTN)N IS APPROIOMATELY 20x10 FILTER 3B' EAST AND 68' NORTH, 20"z24" G PROVIDE PRESSURE REGUUTORS, 14 14 C i-1D"II OA INTAKE SECOND FLOOR OFFICE HVAC PLAN O 4 3 2 J A IE IC ~C E itti ailtrA1zfa '%0 0 TC CIE ~-;», w~rTr rAx 7to-wti ...... ....