HomeMy WebLinkAbout09-45FEBRUARY 10, 2009 09 -45 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE CHANGE ORDER NO. 2 FOR PUBLIC WORKS CONTRACT 08 -05 FOR MIRON CONSTRUCTION CO., INC. FOR THE WATER FILTRATION PLANT MODIFICATIONS AND DEMOLITION PROJECT ( +$295,124.52) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: MIRON CONSTRUCTION CO., INC. PO BOX 509 Neenah, WI 54956 Net Increase to contract: $295,124.52 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 541 - 1841 - 1799 -00000 - Water Utility Construction Work in Progress ( 0 OOfH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Stephan M. Brand, Utilities Superintendent DATE: February 2, 2009 RE: Change Order #2 for Public Works Contract No. 08 -05; Water Filtration Plant Modification and Demolition Project BACKGROUND Change Order #2 for Contract 08 -05 is scheduled for consideration by the Common Council at the February 10th meeting. The contract was awarded to Miron Construction Co. Inc. of Neenah, WI. The bid opening for this contract was April 2, 2008 with an anticipated award date of April 22, 2008. Due to the issues surrounding the water tower the contract was not awarded until May 27, 2008. This delay along with the work to remove unsuitable soils found after the initial basin demolition was completed delayed the start of concrete replacement. The other changes are due to additional requirements of the Department of Natural Resources that are not code related but part of departments internal decision making process, and site conditions that have been found in the field to be different than, or not shown on existing site plans. Whenever possible these prices reflect estimated time and material costs and will be adjusted to reflect the actual cost of the work once it is completed. A final adjustment will be done at the end of the contract on these items. ANALYSIS 2a Cold Weather Placement- Payments for concrete blankets and heat during 7 day cure for portion of concrete work affected by initial site conditions and permit delay. Contract times extended an initial 61 days, without liquidated damages and without Contractor's General Conditions markups. 2b Hatches- Provide different model number hatches to satisfy WDNR review comment requirements and additional hatch ladders and concrete sumps for greater operator accessibility. 2c General Conditions- Contractor General Conditions markups for City change order 1 h- replace 16 inch watermain. 2d South Clearwell- 24" Piping Changes- Provide additional pipe fittings to accommodate actual buried piping locations. 2e Basin Overflow- Provide supplemental overflow to satisfy WDNR review comment. 2f Electrical Outlet- Provide exterior electrical outlet at High Lift Pump Station to accommodate dewatering clearwells with portable pumps. 2g High Lift Station Sidewalk- Replace steps with ramp at pump station. Note- this revision does not cause any change to the contract price. H:lstephanb \Water Filtration \CT- BasinDemoProject \Change Orders \CO #2 \CO - 42- Cont- 08- 05WFPFinal.doc 2h GAC Electrical Ductbank- Provide replacement ductbank damaged and temporarily reinstalled as result of actual buried conduit differing from record drawings and work performed in conjunction with City's phase 1 demolition. 2i Electrical Disconnect Replacement- Replace hand switch with circuit breaker to facilitate construction. Note- this revision does not cause any change to the original contract price. 2j Demolish Buried Well- Remove buried, previously abandoned in place well structure. 2k Wall Dowel Evaluation- Conduct structural analysis of alternative dowel placement. Note -this revision is a deduction to the original contract price. These changes were reviewed by CH2M Hill our consultant on the project and the costs related to these changes were reasonable based on their experience with similar work. FISCAL IMPACT Funds are available in the 2008 Property Improvements Section (Water Utility Funds) of the Capital Improvement Budget. RECOMMENDATIONS I recommend approval of Change Order # 2 to Contact No. 08 -05 in the amount of $295,124.52 to Miron Construction Co. Inc. Respectfully Submitted, Step an M. Brand Utilities Superintendent Approved: City Manager HAstephanb \Water Filtration \CT- BasinDemoProject \Change 0rders \C0#2 \C0- #2- Cont- 08- 05WFPFinal.doc February 2, 2008 Change Order No. 2 Project :' Water Filtration Plant Modifications and Demolition Project Owner: City of Oshkosh Contract: 08 -05 Contractor: Miron Construction Description of Change Change Order No.: Request for Quotation No. (Project Modification No.) 2a: RFQ 01B (PM 024) - Cold Weather Concrete Extension add $141,321.00 add 61 days 2b: RFQ 03 (PM 003) - BILCO Hatches add $6,463.00 2c: RFQ I IB (PM 026) - General Conditions Time Ext. CO -lh add $40,257.00 add 30 days 2d: RFQ 13 (PM 015 -1) — South Clearwel124" Piping Revisions add $20,614.00 2e: RFQ 14B (PM 016 -01) —Basin Overflow add $32,478.69 2f: RFQ 15 (PM 017) — Exterior Electrical Outlet add $3,996.00 2g: RFQ 18 (PM 020) — Sidewalk by High Lift Pump Station add 2h: RFQ 19 (PM 021 -1) — GAC Electrical Ductbank add $25,287.00 2i: RFQ 20 (PM 022) — Electrical Disconnect Replacement add $0.00 2j: RFQ 21 (PM 023) — Demolish Existing Well Structure add $25,974.83 2k: Cut Dowels in Baffle Wall Engineering Study deduct ($1,267.00) TOTAL VALUE OF THIS CHANGE ORDER ADD $295,124.52 . ADD 91 days Contract Price Adjustment Original Contract Price $6,070,273.00 Previous Change Orders $159,184.00 Adjustments in Contrast Price this Change Order $295,133.52 'Current Contract Price including this Change Order $6,524,590.52 Contract Duration Adjustment Original Contract Duration (Substantial Completion) 365 days Previous Change Orders 0 days Adjustment to Contract Duration this Change Order 91 days Current Contract Duration including this Change Order 456 - days Revised Contract Substantial Completion Date Sept. 26, 2009 This document shall become a supplement to the Contract and all provisions will apply hereto. RECOMMENDED Engineer - CH2M Hill of RPR - AECOM INC Da APPROVED Contractor — Miron Construction Date RECOMMENDED BY OWNER Director of Public Works Date APPROVED BY OWNER City Manager Date City Clerk Date I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin under this Change Order. City Comptroller Date APPROVED AS TO FORM City Attorney Date _